Forwards Insp Repts 50-528/86-20,50-529/86-20 & 50-530/86-14 on 860527-0630 & Notice of Violation. Understands That Response to 860616 Notice of Violation, Item 2,will Be Submitted by 860728
ML20212B014
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 07/22/1986
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML17300A307 List:
References
NUDOCS 8608060131
Download: ML20212B014 (2)


See also: IR 05000528/1986020

Text

-

. .

.

, , . . ..

. . ..

S

.

!-

,

./

/Jul. 2 21986

Docket Nos. 50-528

50-529

50-530-

Arizona Nuclear Power Project

P. O. Box 52034

Phoenix, Arizona 85072-2034

Attention: Mr. E. E. Van Brunt Jr. ,

Executive Vice President

Gentlemen:

Subject: NRC Inspection of Palo Verde Units 1, 2 and 3.

This refers to the inspection conducted by Messrs. R. Zimmerman,

C. Bosted, G. Fiorelli, J. Ball and J. Melfi of this office on May 27,

1986, through June 30, 1986 of activities authorized by NRC License Nos.

NPF-41, NPF-51 and Construction Permit Number CPPR-143, and to the

discussion of our findings held with yourself and other members of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

Based on the results of this inspection, it appears that one of your

activities was not conducted in full compliance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

Additionally, paragraph 9 in the enclosed report documents a discrepancy

between the inputs used in the seismic calculation for the diesel

generator bridge cranes, and those required by the design specification.

This instance of failure to assure that procured equipment satisfies the

appropriate design specification is similar in nature to several examples

for which a violation was issued following the NRC Construction Appraisal

Team inspection conducted earlier this year (50-530/86-03). A report of

the team's findings and a Notice of Violation were transmitted to you on

April 4, and June 16, 1986, respectively. It is our understanding that

you have agreed to include your assessment and corrective actions

associated with the adequacy of the diesel generator bridge crane design

verification as part of your response to Item 2, in the Notice of

Violation issued on June 16, 1986. Also, it is our understanding that

you have agreed to respond to that Notice of Violation, in total, by the

revised date of July 28, 1986.

'

O h 28

~ / '

- - - - - -

rs:

.

D

-2-

JUL 2'21986 .

,

Your response to thislNo'tice is to be submitted in accordance with the

provisions of 10 CFR 2.201 as stated in Appendix A, Notice of Violation.

In accordance with 10 CFR 2.790(a), a copy of this letter and the en-

closure will be placed in the NRC Public Document Room.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedure of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be~

'

pleased to discusa them with you.

Sincerely,

~

'

Crigino! signe'd S/,

D. F. Kirs6

D. F. Kirsch, Director

Division of Reactor Safety and Projects

'

Enclosures:

A. Appendix A - Notice of Violation

'

B. Inspection Report Nos. 50-528/86-20 ~

50-529/86-20

50-530/86-14

cc w/ enclosures:

J. G. Haynes, Vice President, Nuclear Operations '

J. R. Bynum, PVNGS Plant Manager

W. F. Quinn, Manager, Nuclear Operations Licensing

T. D. Shriver, Manager, Compliance

W. E. Ide, Manager, Corporate QA/QC

C. N. Russo, Manager, QA Audits / Monitoring

Arthur C. Gehr, Esq.

Ms. J. Morrison

Ms. L. Bernabei, GAP

D. Railsback, Arizona Corporation Commission

,

bec w/ enclosures: <

RSB/ Document Control Desk (RIDS); Resident Inspector; Project Inspector;

G. Cook; B. Faulkenberry; J. Martin

bec w/o enclosure 2:

LFMB

s

[) '

.

NegionV

-

I

-

~ ~~" ~f A M

l RZimmerman/ dot CBosted GFiorelli JBall JMelfi L i ler AChaffee

7/ /86 7/ /86 7/ /86 7/ /86 7/ /86 7/%466 752-/86

- ,

, 3D

m# . -