ML20212A885

From kanterella
Jump to navigation Jump to search

Grants Approval for Immediate Use of 1983 Edition Through Summer 1983 Addenda of ASME Boiler & Pressure Vessel Code, Section Xi,Until End of First Inservice Testing Interval on 870920.Review of Program & Relief Requests Continuing
ML20212A885
Person / Time
Site: Beaver Valley
Issue date: 12/12/1986
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Sieber J
DUQUESNE LIGHT CO.
References
TAC-61257, NUDOCS 8612290071
Download: ML20212A885 (3)


Text

,

.. V December 12, 1986 Docket No. 50-334 OISTRIRUTION EDoctet F11ej P. Tam NRC PDR" D. Miller Local PDR ACRS (10)

Mr. J. D. Sieber, Vice President PAD #2 Rdg R. Ballard Duquesne Light Company T. Novak G. Bagchi Nuclear Operations OGC-Rethesda A. Masciantonio Post Office Box 4 E. Jordan Gray File Shippingport, PA 15077 8. Grimes J. Partlow

Dear Mr. Sieber:

N. Thompson

Subject:

Approval of use of Updated ASME Code Edition in IST Program for Peaver Valley Unit 1 (TAC 61257)

By letter dated April 1,1986, you submitted your new Inservice Testing Program and associated relief requests for the second ten-year interval. Subsequent to that submittal, we approved an extension of your first ten-year interval by approximately one year (letter, April 28,1986). You indicated that if the request for this extension was granted, you would seek approval to use a later version of the ASME Code for the balance of the first interval, in accordance with 10 CFR 50.55a(g)(4)(iv).

Approval is hereby granted to immediately use the 1983 Edition through the Summer 1983 Addenda of the ASME Roiler and Pressure Vessel Code,Section XI, in accordance with 10 CFR 50.55alg)(4), until September 20, 1987, the end of the first IST interval.

You should review all existing pump relief requests and assure that the relaxation in pump testing frequency allowed by the 1983 edition of the Code does not modify or invalidate the basis for any of the existing relief requests which have been approved by the NRC. You are also reminded that the 1983 edition of the Code is more stringent in the number of pump parameters to be measured during inservice tests (see Table IWP-3100-1). In accordance with 10 CFR 50.55a(g)(41(iv),

all requirements of the later version of the Code must be met.

Our review of your second 120-month IST program and relief requests is ongoina.

Those results will be provided at a later time. If you have additional questions, please contact your Project Manager, Mr. Peter Tam (301) 492-9409.

Sincerely, O

Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc: See next page LA: PAD #2* PM:FT ER * *EP *E8 *0GC M:W0b DMiller PTam , AMasciantonio GRagchi RRallard LRubenstein 10/ /86 12// 86 10/ /86 10/ /86 10/ /86 10/ /86 12/y/86

  • Previous concurrence: See next page 8612290071 861212 4 PDR ADOCK 0500 P

r Docket No. 50-334 -DISTRIBUTION Docket File P. Tam NRC PDR D. Miller

, Local PDR ACRS (10)

Mr. J. D. Sieber, Vice President PAD #2 Rdg R. Ballard Duquesne Light Company T. Novak G. Bagchi Nuclear Operations OGC-Bethesda A. Masciantonio Post Office Box 4 E. Jordan Gray File Shippingport, PA 15077 B. Grimes J. Partlow

Dear Mr. Sieber:

N. Thompson nl pn t,Je NH. , , a

Subject:

Approval of /Updated'IST Program for Beaver Valley Unit I (TAC 61257)

By letter dated April 1,1986, you submitted your new Inservice Testing Program and associated relief requests for the second ten-year interval. Subsequent to that submittal, we approved an extension of your first ten-year interval by approximately one year (Letter, April 28,1986). You indicated that if the request for this extension was granted, you would seek approval to use a later version of the ASME Code for the balance of the first interval, in accordance with 10 CFR 50.55a(g)(4)(iv).

Approval is hereby granted to immediately use the 1983 Edition through the Summer 1983 Addenda of the ASME Boiler and Pressure Vessel Code,Section XI, in accordance with 10 CFR 50.55a(g)(4), until September 20, 1987, the end of

'the first IST interval.

You should review all existing pump relief requests and assure that the relaxatinn in pump te Astinfrequency allowed by the 1983 edition of the Code

/does not' modify or InvalidareNany of the existing relief requests which have r4 M been approved by the NRC. You are also reminded that the 1983 edition of the j,f Code is more stringent in the number of pump parameters to be measured during inservice tests (see Table IWP-3100-1). In accordance with 10 CFR 50.55a(g)(4)(iv),-

all requirements of the later version of the Code must be met.

Our review of your second 120-month IST program and relief requests is ongoing.

Those results will be provided at a later time. If you have additional questions, please contact your Project Manager, Mr. Peter Tam (3011492-9409.

Sincerely, Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc: See next page

- ' M + 644 a -C4mW W M m

  • L pf2,*PM:P & *ER gmn EO' IL EB Q PD: PAD;2 DM er PTam: (AMasciantonio GBagchi RBa(. h OGC/

l ard ti b h ; LRubenstein 1 1/86 10/L*/ 10/21/86 10/14/86 10/31/86 MT/u/86 10/ /86 i

V b o o Mr. J. D. Sieber Beaver Valley 1 Power Station Duquesne Light Company cc: '

'Mr. W. S. Lacey Pennsylvania Power Company Station Superintendent James R. Edgerly Duquesne Light Company Post Office Box 891 Beaver Valley Power Station New Castle, Pennsylvania 16103 Post Office Box 4 Shippingpart, Pennsylvania 15007 Mr. Jess T. Shumate, Commissioner State of West Virginia Department Mr. S. Sovick, Acting Supervisor of. Labor of Licensing 1800 Washington Street, East Duquesne Light C.ompany Charleston, West Virginia 25305 Post Office Box 4 Shippingport, Pennsylvania 15077 David K. Heydinger, M.D.

State Director of Health Mr. John A. Levin State Department of Health Public Utility Commission 1800 Washington Street, East Post Office Box 3265 Charleston, West Virginia 25305 Harrisburg, Pennsylvania 17120 Regional Administrator, Region I 4

Gerald Charnoff, Esquire U.S. Nuclear Regulatory Commission Jay E. Silberg, Esquire 631 Park Avenue Shaw, Pittman, Potts and Trowbridge King of Prussia, Pennsylvania 19406 2300 N Street, N.W.

Washington, DC 20037 Mr. R. Janati Bureau of Radiation Protection Charles E. Thomas, Esquire Pennysivania Department of Thomas and Thomas Environmental Resources 212 Locust Street P.O. Box 2063 Box 999 Harrisburg, Pennsylvania 17120 Harrisburg, Pennsylvania 17108 Marvir Fein Utility Counsel City of Pittsburgh 313 City-County Building Pittsburg, Pennsylvania 15219 Resident Inspector i U.S. Nuclear Regulatory Commission Post Office Box 298 Shippingport, Pennsylvania 15077