ML20212A784
| ML20212A784 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 07/11/1986 |
| From: | Foster D GEORGIA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-988, NUDOCS 8607290128 | |
| Download: ML20212A784 (87) | |
Text
-n' c,_
i '8 Georgia Power Company g-I
. Post Office Box 282 Waynesboro, Georgia 30830 Telephone 404 554-9%1, Ext. 3360 g,t 404 724-8114, Ext. 3360
, J 2. El P l; I, GeorgiaPower
- o. o. roue, vice eres, cent n,,,,n en,e. g,,,: n Vogt!e Protect United States Nuclear Regulatory Commission Region II File: X78G03-M117 Suite 2900 Log:
GN-988 101 Marietta Street, Northwest Atlanta, Georgia 30323
Reference:
Vcgtle Electric Generating Plant-Units 1 and 2; 50-424, 50-425; Main Steam Safety Valve Ring Settings Letter GN-942 dated June 12, 1986 Attention: Mr. J. Nelson Grace In previous correspondence concerning the above referenced subject, Georgia Power Company indicated the NRC could expect to be notified of the results of our evaluation of this condition by July 18, 1986.
Georgia Power Company has completd its evaluation and determined that a reportable condition as defined by the reporting criteria of Part 10 CFR 50.55(e) does exist. A Part 10 CFR 21 notification is not required since the NRC has been adequately informed of the existence of this condition (see I&E Information Notice 86-05). A summary of our evaluation is enclosed.
This response contains no proprietary information and may be placed in the NRC Public Document Room.
8607290128 860711 Yours truly/,
{DR ADOCK 050 4
D. O. Foste A
PAH/DOF/tdm Enclosure xc:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 J. H. Miller R. A. Thomas L. T. Gucwa J. P. O'Reilly D. R. Altman C. W. Hayes G. F. Head P. R. Bemis G. ' A. McCarley R. E. Conway J. A. Bailey D. S. Read J. T. Beckham
- 0. Batum Sr. Resident (NRC)
R. H. Pinson G. Bockhold C. S. McCall (OPC)
P. D. Rice C. E. Belflower J. E. Joiner (TSLA)
B. M. Guthrie J. F. D'Amico D. C. Teper (GANE)
D. E. Dutton E. D. Groover NORMS 2
//
[
-,q 6
u EVALUATION OF A P0TENTIALLY REPORTABLE CONDITION MAIN STEAM SAFETY VALVE RINGS SETTINGS Initial Report: On May 14, 1986, Mr. R. E. Folker, Vogtle Project Quality Assurance Engineer, informed Mr.
E.
F.
Christnot of the USNRC-Region II of a potentially reportable condition concerning Crosby main steam safety valve ring settings.
This concern was originally identified to utilities through USNRC I & E Information Notice 86-05.
In subsequent correspondence, Georgia Power Company indicated that the NRC would be informed of the results of the evaluation of this condition by July 18, 1986.
Background Information: I & E Information Notice 86-05, Main Steam Safety Valve Test Failures and Ring Setting Adjustments, was issued by the NRC to alert recipients of a potentially significant problem pertaining to spring actuated main steam safety valves.
In the fall of 1984, Public Service of New Hampshire sent the main steam safety valves (MSSV) for its Seabrook plant to Wyle Laboratories for full-flow testing to determine the proper vent stack size.
To determine full flow, Wyle measured disc travel of the model number 6R10 valves manufactured by the Crosby Valve and Gage Company.
The results of the tests indicated that the valves could not achieve the required disc travel with the factory-set ring setting (+155 notches).
The disc travel achieved was 50% of the full lift necessary to develop required steam flow capacity.
These tests indicate that the Crosby safety valves may not previde full relief capacity in accordance with the design requirement and may not meet the stamped nameplate capacity.
Each main steam line at the Vogtle Electric Generating Plant is provided with five (5) spring loaded safety valves.
The relief capacity of these valves is designed to protect the steam generator and the main steam system from overpressurization.
The main steam safety valves used at the Vogtle Electric Generating Plant are Crosby Model 6R10.
The valves are required to be in compliance with ASME Section III, Division 1, as defined in the 1974 Code Edition, and Addenda through Winter 1975.
This code states, in part, that safety valves shall operate without chattering and attain full lift at a pressure less than 3% above the setpoint pressure.
The valve tag number and their set pressure are shown below:
flain Steam Loop 1 Main Steam Loop 2 1-PSV-3001 1185 1-PSV-3011 1185 1-PSV-3002 1200 1-PSV-3012 1200 1-PSV-3003 1210 1-PSV-3013 1210 1-PSV-3004 1220 1-PSV-3014 1220 1-PSV-3005 1235 1-PSV-3015 1235 Main Steam Loop 3 Main Steam Loop 4 1-PSV-3021 1185 1-PSV-3031 1185 1-PSV-3022 1200 1-PSV-3032 1200 l
h u
l-PSV-3023 1210 1-PSV-3033 1210 1-PSV-3024 1220 1-PSV-3034 1200 1-PSV-3025 1235 1-PSV-3035 1235 Engineering Evaluation:
In the FSAR Chapter 15.2, Decrease in Heat Removal by the Secondary System, the subject safety valves are assumed to prevent overpressurization of the main steam piping and for the removal of heat from the primary coolant system.
As a result of the I & E Notice, Georgia Power Company tested five of the twenty main steam safety valves for Unit 1.
Testing was performed to determine the appropriateness of the as-shipped ring settings (+ 150 for the guide ring and approximately -45 for the nozzle ring).
The results of the test indicated that with the as-shipped ring settings, the valves would not attain sufficient lift to provide full relief capacity.
The reduction in relief capacity resulting from the incorrect adjustment of the valves represents an unanalyzed condition and could have resulted in the loss of the capability to provide full relief capacity.
Subsequently, all twenty - Unit 1 valves were shipped to Crosby's high flow test facility for testing and adjustment.
The ring settings were adjusted to increase the disc travel and to enable the valves to achieve their design relief capacity.
Table 1 summarizes the results of these tests.
Additionally, the NY-1 forms for these valves are included as Attachment 1.
Bechtel Power Corporation, as a result of an NRC request, also verified the safety relief valve backpressure.
Calculation X4C1301V01 indicates an expected value exit pressure of 155 psia.
The calculated value is lower than the backpressure obtained during testing at Crosby.
Review of Quality Assurance Program Breakdown: When Crosby Valve shipped the VEGP main steam safety valves, they met the requirements of the ASME Code and system specifications.
The original valve settings were based on extraplation since there was no facility available to test the valves.
Therefore, our review has concluded that there has not been a significant breakdown in the quality assurance program at Crosby Valves.
==
Conclusion:==
Georgia Power Company has concluded that a reportable condition as defined by Part 10CFR50.55(e) does exist.
A Part 10CFR21 notification is not required since the NRC has been adequately informed of the existance of this condition for Crosby Valves.
Correction Action: Valves for Unit 2 will be adjusted in the future.
This activity will be tracked under PCW action items numbers 28-1026-001 and 2B-1026-002.
g --
. 4.4 6:
o-V06TLE N'JCLEAR PCWER PLANT MAIN STEAM SAFETY VALVES TABLEI MIGH FLOW TEST RESULTS o_...
..+
-..+_.._
-e_.
..._+-
e
.... p
..+
l SET
- RING SETTINGS l0 PEN l RESEAT lACCunULATION : PERCENT : PERCENT ! LIFT !!NCHES) l l VALVE TA6 No l PRESSURE lN0ZILE !6UILE ! PRESSURE l PRESSURE lFRESSUEE lBLCu:0MN lACCUM.
MEASURED AT 31 ACC;M.:
w_
o
..+_
+
+.-
-+-
+... ---
+....... +-
- w.... -
_....+
l l
1185 l -130 :
0l 1180 :
1131 :
1227 l 4.6 :
4.0 1.06 :
11-PSV-3001 1185 :
1186 l 1134 l 12!2 l 4.3 l 3.9 :
1.09 l l
1185 :
l 1191 :
1135 l 1234 :
4.2 l 3.6 :
1.10 :
+-
...o
....+..... +..... +.-
+
...+-
+..... +.
.... +.................,
l l
1185
-130
-59 l 1193 :
1129 l 1223 :
4.7 l 2.5 :
1.02 l l1*PSV-10!!
1187 :
!!26 1224 :
5.0 l 3.1 :
1,c2 :
1185 i 1193 :
1126 1226 :
5.0 l 2.8 l 1.04 :
+.._-
--+.
+
-+___
-+
...+.........+..
....u..
....+
-+............
_+
l l
!!85 l -125 :
-48 :
1188 :
1139 l 1257 :
3.9 :
5.8 :
1.06 :
- 1-PSV-3021 1185 :
1189 1136 1248 :
4.1 5.0 :
1.02 l l
l 1185 :
1185 1136 1236 4.1 4.3 l 1.00 :
+.
_ -+-
-+
--+.
-+-
+.......+.
+
-+
+
+
l 1185 l -165 :
-50 l 1188 l 1128 l 1243 l 4.8 l 4.6 !
1.05 :
- 1-PSV-3031 1185 :
1181 1126 :
1238 :
5.0 :
4.B :
1.07 :
1 1185 :
!!86 :
!!26 1235 :
5.0 :
4.1 l 1.06 :
+-
o....
..o......+=
+.
o
.+
+...
o....
+
l l
1200 l -100 l
-80 :
1200 :
1156 l 1249 3.7 l 4.1 :
1.02 :
!!-PSV-3002 l 1200 :
l 1202 :
1154 1252 l 3.8 :
4.2 1.01 :
1200 :
!!94 1155 ;
1249 l 3.8 ;
4.6 1.02 :
+_
+-
-+-
.+-
+.
--+...._
.+_
-+-- _
+
1200 l -100 1
-50 :
1195 l 1157 l 1252 ;
3.6 4.8 :
1.02 l1-FSV-3012 :
1200 :
!!96 l 1152 1251 :
4.0 1 4.6 l 1.0! !
1200 l l
l 1195 l 1155 l 1253 3.8 :
4.9 :
1.03 :
+-
..o......+.......+.._
o........+
o..
....+-
+-
_.......+
l l
1200 l -100 l
-50 :
1209 l 1140 l 1259 :
5.0 :
4.1 1.05 :
- 1-PSV-3022 1200 :
l 1204 1151 :
1256 4.1 l 4.3 1.0! !
1200 :
1209 l 1140 1257 5.0 :
4.0 1.05 :
+
..+
-+
+
+.........+.....
._+
+.
....+-
+
l l
1200 l -130
-100 1198 l 1152 :
1257 :
4.0 :
4.9 l 1.04 :
l1-PSV-30:2 :
1200 :
1 1203 l 1152 l 1257 4.0 :
4.5 :
1.03 :
1200 :
1202 l 1145 :
1257 :
4.3 l 4.6 l 1.03 :
+.
.+.........+
_+.
-=+
..__+=--
--+-
,===
._+.......,_
-==......+
l l
1210 l -130 ;
-50 :
1210 :
1165 1259 l 3.7 :
4.0 1.07 :
l1-FSV-3003 1210 :
1212 :
1163 :
1247 :
3.9 l 2.9 :
1.06 :
l l
1210 l 1217 ;
1160 l 1255 4.1 3.1 1.06 :
+
o_.
-+
+.............+--
.w
.. +..
... +.._
+...,...p..
l l
1210
-130
-50 l 1209 :
1156 :
1253 l 4.5 :
3.6 :
1.03 :
l1-PSV-3013 l 1210 l l
l 1206 l 1155 :
1251 i 4.5 3.7 :.
1.03 1.04 :
i 1210 1207 l 1156' 1250 l 4.5 3.6 :
p
......+-
-+-
+_
+.........o...
+
+_
_ o..
....+_- -
...........+
I i
- fg*
F.
b VCGILE NUCLEAR POWER PLANT MAIN STEAM SAFETY VALVES TABLE l HIGH FLON TEST RESULTS
+.
....+.
.... +
-+
- -+
.... +
+.....
+.....-
l l SET -
l RING SETTIN6S l0 PEN l RESEAT lACCUMULATIONPERCENT : PERCENT ! LIFT 11NCHES) l
! VALVE TA6 No ! PRESSURE lNCZZLE 16UIDE : PRESSURE : PRESSURE : PRESSURE lBLCWDCWN l ACCl;R.
MEASURID AT 31 R CUM.:
............+
+... +-
.+-
+-
-+-
+.......==
11-PSV-3023 :
1210
-130
-50 :
1220 :
!!61 :
1247 :
4.0 2.2 1.09 :
l 1
1210 l 1211 :
1155 :
1251 4.5 l 3.3 :
1.11 :
1 1210 :
1210 :
1159 l 1249 !
4.2 3.2 :
1.11 l
-+
- s.....
v
+-
...+_
+. -
s..
-+.....
+........
-+
v l
l 1210 l -130
-50 l 1215 115B :
1268 !
4.3 :
4.4 :
1.09 :
!!-PSV-3033 l 1210 :
1212 :
1157 l 1261 4.4 l 4.0 1.10 :
1210 :
1214 l 1155 :
1258 :
4.5 :
3.6 1.10 :
+...
......+
+...+.......e v---
+- -
.+
y
+.
..+
l l
1220 l -170
-50 1222 l 1160 !
1257 l 4.9 l 2.9 l 1.05 :
11-PSV-3004 :
1220 :
1225 :
1154 l 1254 l 5.4 2.4 l 1.04 :
1220 :
1224 :
1157 ;
1255 5.2 l 2.5 l 1.05 :
+---
+
__+-
y
+=
+
+........-
+.......+....
+.........
.... +
l l
1220 l -100 l
-50 1218 1177 l 1274 3.5 :
4.6 :
1.05 :
- -PSV-30:4 l 1220 :
1215 :
1174 :
1270 l 3.8 !
4.5 l 1.05 :
1220 l l
l 1215 :
116B 1274 :
4.3 l 4.9 :
1.04 :
+-
.. +.........+---_
+
y
-+-
-+.........+ _
..+
+...........--
+
l l
1220 ! -130 l
-50 1229 :
1173 :
1256 1 3.9 l 2.3 l 1.07 :
- 1-PSV-3024 :
1220 1231 :
!!67 1263 l 4.3 l 2.6 :
1.09 i l
l 1220 :
1220 :
!!71 l 1263 l 4.0 3.5 1.09 :
e
--+_
+.....+._
+-
_ _+.
+...
..+..... +
...+
1 1220
-130
-50 l 123: :
!!71 :
1272 4.0 l 3.3 1.06 l l1-PSV-30:4 12?0 :
1~27 l 1166 !
1265 4.4 3.3 i 1.04 :
1 1220 :
1230 :
!!66 !
1272.
4.4 i 3.4 :
1.05 :
+....
__+...
--+.......e
+.........+-
.+
v
+.
--s.
-+
l l
1235 : -100 l
-50 :
1232 1187 l 1274 :
3.9 l 3.4 :
1.06 l l1-PSV-!005 :
12:5 :
1226 1184 1272 l 4.! !
3.8 1.06 i i
1235 l l
l 1228 l 1185 1266 l 4.0 :
!. 0 1.04 :
+...
=+
..+.......+---
v
-s.........+.....
_v
_+_
+
l l
1235 l -130
-50 :
1236 :
!!E0 :
1274 4.5 3.1 l 1.15 l l2-FSV-3015 l 12!5 l l
l 1241 :
1175 :
1272 :
4.9 2.5 l 1.15 :
1235 :
1246 :
1180 :
1275 l 4.5 l 2.3 1.13 :
+.............+=-=.
+.......+--- _-+-_-
_+
-+-
+_
_+_
+
l l
1:35
-130
-50 :
1236 l 1175 :
1273 l 4.9 l 3.0 :
1.10 l l1-PSV-3025 l 1235 l l
l 1:43 1171 :
1272 l 5.2 l 2.3 :
1.09 l
l 1235 l 12 6 l
!!71 :
1270 :
5.2 :
2.9 1.10 :
+
_v
-+....+.....+=
y
....+-
-e
...+---
--+
- --+
l l
1235
-100 !
-50 1223 1186 l 1280 :
4.0 :
4.7 :
1.06 l1-PSV-3035 1235 l
l 1227 1183 l 1271 :
4.2 l 3.6 l 1.09 l l
l 1235 :
1225 :
!!B2 l 1278 l
'4.3 l 4.3 l 1.06 :
+
.+ _
-y
+.
_-+===
-+.........+........
+-
-v
+.........-
This table shews the results of the three consecutive tests meeting the folloning acceptance criteria :
J Valve opening pressure shall be within design requirements of plus cr ainus II of the staaped set pressure.
The low set 11185 psig) valves shall close af ter b! cuing down to not lower than the design reouirteent of 951 of stasped set pressure. All other valves shall close af ter blosing down to a nominal value of 951 of stanced set pressure.
Valve shall obtain lif t of 0.974 inches sinious at a pressure no greater than 31 above the opening pressura.
Reference:
CROSBY test procedure T-16472 i
I
{
ATTACH 01T l6 P. ca. /.1 g
i i
k I
CROSSY V A LV E O GAGE CO M P A N Y CROSBY p
WRENTHAW, MA33 b
FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/1.VES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT 1
Safety and Safety Relief Valves
- 1. Manufactured By Crosby Val _ve & Cage Company. 43 Kendrick St.
Wrencham. MA 02093 Name and Address Model No.
HA-75-FN Order No. N64343 Contract Date 3/5/79 National Board No.
~~
Georgia Power Corp., P.O. Box 4545
- 2. Ma'nufactured For Atlanta. Georcin 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3021 Serial No.N62 569-00-0003 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Size R pg p, s ig, -- Inlet 6 Outlet 10 Safety. Safety Relief, Pilot.
Inch Inch Inch inch Power Actuated
- 6. Set Pressure (psig) 1185 576 F
Rated Temperature 893160 lbs/hr sag 3
,oy,,,,,,,,,,
Blowdown (psta) H f S.P.
Stamped Capacity Hydrostatic Test (psig) Inlet 1845 Outlet N/A (Apn11 cable to Valves for Closed Syst.mm Only)
Pressure Retaining Pieces Serial No.
. Material Specification Identification Including Type or Grade *kQ
- b. Bar Stock & Forgings Bearine Adapter ASTM A193-76 Cr. B6 ImpputzRs.xnx N90087-42-0187 ASE S A19 3 Gr. B6, s '
Nozzle N92896-32-0017 ASE SA182cT[pe F316 Disc Insert N92898-33-0059 ASME SA637 Gr. 718,
N92950-32-0005 Spring washersK62821-25-0014 N92951-32-0038 ASME SA105 Adjusting BoltK63649-25-0016 N93583-25-0016 ASE SA193 Gr. B6 Spindle K63648-03-0050 N88895-65-0370 ASE SA193' Gr. B6
- c. Spring K62821-25-0014 NX3378-31-0035 ASTM A689-74
- d. Bolting
- e. Other Pieces l
w n.e Rend N91614 ASME SA193 Gr. B7 Bonnet Nut N88481 ASME SA194 Gr. 2H
=
pwk
/
?. p. l.1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components, Section 1974 Edition, Addenda Winter 1975
, Code Case No.
III, Div. 1, (Date)
Class Date 4///S/f4 Signed Crosby Valve & Gage Co.
by
'_1 (N Certificate Holder)
V(
Our ASME Certificate of Authorization No.
1878 to use the NV symbol expirts September 30, 1980 (Date)
CERTIFICATION OF DESIGN Design information on file at Cresby Unive A cu, en-nnnt.
Stress analysis report (Class 1 only) on file at 1
Design specifications certified by Ada I. Pressman PE State California Reg. No.
16552
~~~
Stress report certified by PE State
~~~
Reg. No.
1Signature not required - list name only.
CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid comission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systens*
of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7/f 7, 19 h q, and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components.
By signing this certifieste, neither the inspector nor his employer makes any warrant, expressed or implied, concerning the equipment described in this Data Report. Further-more, neither the Inspector nor his employer shall be Mqb}g-in trny' manner for any personal injury or property damage or a loss.cf ady f[lnd arising from or connected with
~
this inspection.
Date
/ / ~ ' 19 ' ' ' -
Signed
- d. l (t
(_ (['
Comissions l' ! v. ", f, / [' f. '
f (Inspector)
(Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
I JECNTEL 412
\\Ip i,
CROSBY VAI.VE 6 C ACF C0FPA'sY bb3 Wrenthan, Massachusetts q\\P S. 3.3. l.q 5.3. 3. l.
5.3.3.1.b VALVE TEST REPORT u
I I
Test Procedure No. T-16289 Rev. d
- 6. 3. 3. 3 Quality Assurance Instruction:
320 dad Date:
h ~/I-N Test No.:
N/A Test Procedure No..--r'- //,2 9 9 fgg/. J Size and Style Valve:
L. R so yH 75 e-W Set Pre ssure : 1/f5-f / */c Crosby Component Scrial No.~: A/ fppg/M -oo - coo 3 Assembly No. :,W.M4-9 Crosby Factory Order No.: Alt,y M 3 leen No.
/
Drawing No.:D3 6 C)sg. 9 Rev. 1 Customer's Mark or Tag No.:
/ @SV Sod /
Customer's Order No. : 7AV - 44p c,0 s+. i+.* 5 1.
Hydrostatic Test sgg Sv55f /
j Nozzle _
Dise Insert Valve Body (Outict)
Pressure:
Time:
/
/
Results:
/
/
/
Test Cage No.
/
Cage Calibratior)/ #.e':
/ /
/ / '/
D Water Test No. :/
/
/
)
/
Tested By:
Date Date Date Reviewed and Accepted By:
Date Date Date l-2.
Final Setting Tests (Steam) 1 2.1 Valve Data
/43 -
N /. 6, j
Run Final Spring Fo.:F4 hN-f/-80)S~
No.
Open Close Blowdown Ring Setting: N.R.: - PS 1
//8d
// 3 /
V'f 4.13-G.R.:
4/SO 2
//'7 Y
//28 4"fe
.Te72 Ambient Temperature: 6S*F 3
// > </
// 3a
- # ~3,2fg
-2 '
l Test Cage No. :
70 / 6 4
i Cage Calibration Date: f-/'J-/b 5
.j 2.2 Seat Leakage (Steam)
Pressure:
8 Time:
.fA, w -
dDat
~
Results:
647e5 /M8 i
d{k{ Rev eved,an k -
ff Test Cage No.:
N81/ b f.I2 UO'
~
Cage Calibration Date: f-/2N f-/y.g Date Final Ring Setting: N.R.:
4T Set By: (1 9-/.)"8d G.R. : f/W g,
1 SWL 4ra 9-st,.p3 i
- - - - - - - ~ - ~
T.;
=.
je o.......,
VALVE TEST DATA s
l klualityAssuranceInstruction: Sfo6O note:
O/
/ & m 2-2r g(,
Tcat Number:
Al[A Test Procedure Number:
'7'-/ [ V 9 2 g e v, O Stue and Style Valve: 6R/O NA 95FAI Set Pressure:
/IP5's.s.f s.
Crosby Component Serial Number: A/626'67-CO-Q')O3 Assembly Number: A)6296h Crosby Factory order Number: A/6M Ites: /6'h Drawing Number: DS.(J f 2fTf7 gey,3 Customer Mark or Tag Number:
1 Ast/-302 I Customer order Number: pj9v - vg i
1.
High Flow Test Facility (H.F.T.F.)
I 1.1 Operational Test f
Run Open Acesse Restat Back-Blow-Lift
Temperatures ---
No.
psia psia pois Pressure down %
inches Sprina Body Ambient Spring No.: A(x 3378 1
818 8
- 257 8839 2.oef W T.i t. o' edo igf g(A Final Ring Setting:
2
/I89 s 24S
- 3G If (
M4.1
- 1. o 2.
e / (,
7d7 u(A N.R.:
- 1 2 s
3
- 4 tr
- 1 h ii 16 i90 4/ 4.t,, o o iff 3(4 a/A C.R.:
- '( 8
[y l
2 ' 2["b Instrument Calibration Date:
_ _ _ _ s l ?f!# (
Tested By:
Reviewed /Accep ed By:
45' N
/
v e
1.2 Seat Leakane Test b C M 2_/ h r Seat Leak Pressure:
Test Time:
Results:
Otf S A 775 FAC TO R,[
Reviewed / Accepted By:,
M @/g/f i
2.
Production Test Facility (500 Ft.s)
,N 2.1 Set Pressure verification Test
,,et n
Test Cage Serial N eber:
aZ,7,7. 9 Run Open Cage Calibration Date:
J/27/8/,
No.
psia 1
IS4 2
Adt4 l
3 A/[/:1 2.2 Seat Leakage Test rf!1 M
/Ol#'I OSf b Tested By:
Seat Leak Pressures
?
Test Time:
S M tAfd TG S
/
Results:
S47"/J/~AC 7D J2 y' Reviewed / Accepted By:
J' M N f
,~
Test Cage Serial Number:
27jlf
~
"* F l
Case Calibration Deter tS/2///M f
Ring Setting (As Shipped):
N'. R. : - 12 f Set By:
/
r,acriN e w x 4 a nv " dynoa: t>.a.-rsaf> d e-es
[
l
8.o?. l. A CROSOY V A LV E O GAGE CO M P A N Y CROSBY p
WRENTHAM, MA$$
j 1
FORM NV-1 FOR SAFETY AND SAFETY REl.lEF V/tVES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. 43 Kendrick St.
Wrentham. MA 02093 Name and Address Model No.
HA-75-FN order No. N64343 Contract Date 3/5/79 National Board No.
Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Atlanta. Georstia 30302 order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant
)
Name and Address
- 4. 1.ocation of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3022 Serial NoN62569-00-0007 Drawing No. DS-C-62569 Rev. B afety
~~ Inlet Outlet 6
Orifice Size Pipe Size Type Safety. Safety Relief, Pilot.
Inch Inch Inch Inch Power Actuated
- 6. Set Pressure (psig)
F Rated Temperature 904331 lbs/hr sat 3 5% of S.P.
Stamped Capacity 3
?.0verpressure Blowdown (psig) 1845 N/A Hydrostatic Test (psig) Inlet gogi,g (Apnlicable to Valves for Closed Systems Only)
Pressure Retaining Pieces Serial No.
Material Specification Identification Including Type or Grade Body N92894-31-0002 ASE SA105 Bonnet N92953-32-0007 ASE SA105
)
- b. Bar Stock & Forgings N M8_I_eMAPE'#
N90087-39-0140 E
3 r B6
.i Nozzle N92896-32-0010 ASE SA182 Type' ir316.
)
Insert N92898-34-0102 ASE SA637 Cr. 718 Dise N92950-32-0018 Spring WashersK62821-25-0006 N92951-32-0001 ASE SA105 i
Adjusting BoltK63649-25-0025 N93583-25-0025 ASE SA193 Gr. B6 Spindle K63648-01-0042
,N91761-31-0002 ASE SA193 Cr. B6
- c. Spring K62821-25-0006 NX3378-31-0009 ASTM A689-74
- d. Bolting
(
o I
t 3'.2. I. 2.
~
CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components,Section III, Div. 1, 1974 Edition, Addenda Winter 1975
, Code Case No.
2 (Date)
Class Date M/S d
Signed Crosby Valve & Gage Co.
by (N Certificate Holder)
VY Our ASME Certificate of Authorization No.
1878 to use the NV symbol expires September 30. 1980 (Date)
CERTIFICATION OF DESIGN Design information on file at__.
e,nehv va l u, I cae, rwn ny Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No.
16552 Stress report certified by PE State Reg. No.
~~~
lSignature not required - list name only.
CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 / / 7, 19 G and state that to the best of my knowledge and belief, the N Certificate Holde~r has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components.
By signing this certificate, neither the Inspector nor his ema f makes any warrant, expressed or implied, concerning the equiRiv.nt dgreriBM N th Further-more,neithertheInspectornorhisemoloye'r'shal1beliabik'inahy;taReport.
~
manner for any s
personal injury or property damage or a loss of an)t., Kind'afisin'g' from or connected with i
this inspection.
' 7,
' 19 Date b'! M M '.$ $
/$//>
Signed Commissions s
(Inspe'c to r)
(Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
WHin j
dra
f s
\\y Q
- 6. 3. 3 '
CROSBY VAL"E 6 GACE CO: TAW S. 3,3, j, q Wrentham, Massachusetts
/ ['
- 5. S.3.1. b
~ S. 3. 3. 2 VALVE TEST REPORT f,3,3 3 e
Test Procedure No. T-16289 Rev. M Quality Assurance Instruction:
3c)C G C k U. O.
Date:
h- / I"'f0 Test No.:
N/A Test Procedure No. # /(,2 f9 gg7/.JL Size and Style Valve:
I, M/O MA 75 s "A/
Set Pressure:/J00 f/Vo 8
Crosby Co=ponent Scrial No. : A1 (pdf&f-Od - m'f Assembly No.:A/fpag(,9 Crosby Factory Order No. : A/ lot,/ 2W3 Item No.
4 Drawing No. :n.5-d - &Jgt,9 Rev. A Customer's Mark or Tag No.:
1 P5V - SQsid Customer's Order No.: F /PV l/(,6 CUSt.it. " 7 1.
Hydrostatic Test gy
- g. g. 7 g
Nozzle Dise Insert Valve Body (Outict)
Pressure:
Time:
/
^
Results:
s t ///
/
/
Test Cage No.:
Gage Calibration Dhte:
/
/~
Water Test No.:
Tested By:
Date Date Date Reviewed and Accepted By:
,3 Date Date Date j,a 2.
Final Setting Tests (Steam) i; 2.1 Valve Data t
Run f ra g f s.)
'y
ji Final Spring No.: A/4 3777 No.
Open Close Blot down li Ring Setting: N.R.: - 3 5-1
//96 ife/
- 3. P 3
G.R.: + /S~6 2
n41 irro
.? 9 6
Ambient Temperature:
77 3
ufv ny7 Jr
-2:
j Test Cage No.:
90/4 4
Aff -
)
1 8!
M Cage Calibration Date: 9/s/po 5 A//#
l i
2.2 Seat Leakage (Stean)
Pressure:
/077/s.4 Tested By:
3 4 hvh f, f ![d j
Time:
3%.,
p 4/ D4te ' -
Results:
54 r Reviewed a,nd Test Cage No. :
c,rd / 6 Accepted By; L,42-h -/3N Gage Calibraticn Date: 4//2/fd.),,:L;'i(,5,GIC h f W W Date Final Ring Setting: N.R. : - 3 S-Set By: h b8-M9-/fdd C.R.: 4. / So f'
Date JECHTEL 412 3.t1-20
~.-
WRENTHAM, MA00A@Hs9Lft5?@
VALVE TEST DATA Malit'yAssuranceInstruction:
32 Oleo Date:
4 -i-8(e Test Number:
A//4 Test Frocedure Number:
7- //ed 72.
26v. O Sito and Style Valve: (e E / o
///17f4A/
Set Fressure:
(20 0 PS/G Crosby Component Serial Number: At /s257,f Oo o 7 Assembly Number: A[62IId Crocby Factory Order Number: Al(,7fs'f Ites: /(d Drawing Number: 35-(- 445Z.1 Rev.3 C:stomer Mark or Tag Number: /. Os v-3o z z.
Customer order Number: F/4v - 4/(, c, 1.
High Flow Test Facility (H.F.T.F.)
1.1 Operstional T:st Run Open Acco Reseat Back-Slow-Lift
Temperatures ---
No.
psia pais psia Pressure down %
inches Sprina tody Ambient Nx33 78 1
izo9 ris9
- IM O 18 7 60
'L:
s c.-
198 s8 Spring No.:
Final Ring Setting:
2 slo 7
,2ff asSO sg7
.4 Z,
get a9 sc3 39 N.R.:
-/ OC 3
(209 s2fle
//.3 9
/83 f.f
- M 9;
2c7 4(
R.p, C.R.:
- f0 Instrument Calibration Date; d-f-8(o
_ /!f S Tested By: h,
'/ /~8I Reviewed /Accep ed By:
U 1.2 Seat 1.eakane Test 88
/N 8S/[e Tested By:
Seat Leak Pressure:
U F
ke d Test Time:
Results:
o Arss47 f S /"Ac,7"D/2 Y Reviewed / Accepted By:
I
/
, {s 2.
Production Test Facility (500 Ft.s)
)
2.1 Sec Pressure verification Test p?21 Run Open Test Case Serial Number:
Cage Calibration Date:
+'///86 No.
psia 1
/28 2
al/A-3 iv/A 2.2 Seat Leakane Test Seat Leak Pressures
/0 8' Bond Tested By:
M/
M I
/
/Q 0-@*b Test Times
_3 sersd Results:
oy peppe /up,
Reviewed / Accepted Byi 24 i 17 Test Case Serial lhasber 17M Cage Calibration Dates e//f///.
Ring Setting (Aa Shipped):
N.'R.'s " /00 e., > hie-Lx Mz2 4,q,
s p s w a e. a ca-wou i.neews-:,.S. TML 4-H-!=
I
" ?. 2. /.1 f
I CROSBY V A LV E O GAGE C0 0 P A N Y CROSBY r
WAENTHAM, MASS j
FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/LVES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cane Company. 43 Kendrick St.. Wrantham MA 02093 Name and Address Model No.
HA-75-FN Order No. N64343 Contract Date3/5/79 National Board No.
Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Atlanta. Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3023 Serial No.N62569-00-0011 Drawing No. DS-C-62569 Rev. B afety
~~
Type Orifice Sise Pipe Size Inlet Outlet Safety, Safety Relief Pilot, Inch Inch Inch inch Power Actuated 12M m
- 6. Set Pressure (psig)
F Rated Temperature Stamped Capacity lbs/hr sag 3 911779 5% of S.P.
7,0verpressure Blowdown (psig)
Hydrostatic Test (psig) Inlet _ 1845 N/A ouctec (Applicable to Valves for Closed Systems Only)
Pressure Retaining Pieces Serial No.
Material Specification Identification Including Type or Grade IEL
- b. Bar Stock & Forgings Bearf9ftRmaxAdapter ASTM A193-76 Grf B6'.
1mapot N90087-42-0188 ASE SA193 'Gr. B61 -
Nozzle N92896-32-0029 ASME SA182 Type'F316 Insert Disc N92898-33-0095 -
ASE SA637 Gr. 718 N92950-32-0004 Spring WasherJt62821-21-0019 N92951-32-0020 ASME SA105 Adjusting BoltK63649-25-0013 N93583-25-0013 ASME SA193 Gr. B6 Spindle K63648-01-0044 N91761-31-0033 ASME SA193 Gr. B6
- c. Spring K62821-21-0019 NX3378-31-0031 ASTM A689-74
- d. Bolting
\\
,m-
.. susexa.
.l; i
i P.d. l. A f'
CERTIFICATE OF COMPLIANCE i
We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant ComponentsSection III, Div. 1, 1974 Edition, Addenda Winter 1975
, Code Case No.
2 Class (Date)
M//f/hd Signed Crosby Valve & Cage Co.
by t ;_ __
Date (N Certificate Holder)
(V Our ASME Certificate of Authorization No.
1878 to use the NV c,
symbol expires September 30, 1980 (Date)
CERTIFICATION OF DESIGN Design information on file at t'rn hv univ. t c_. 3. g-.7 3..
Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No.
16552 Stress report certified by
~~~
~~~
PE State Reg. No.
1Signature not required - list name only.
CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid conmission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 / 7, 19 & c.
/
and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components.
.it By signing this certificate, neither the Inspp'ctanca? Til,em?t @,'r g
ployer makes any warrant, expressed or implied, concerning the equipment described in this Data Report. Further-more, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date
..')lz719{l0 I
!*IC,'
//./dd A.;
Commissions
$Ad S $ / 2 b [,
Signed'
~
I (Inspector)
(Nat'1. Bd., State Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
j
, o cal r
Onesv s
/
CROSBY VALVE & CAGE CO:7ANY O
Wrentham, Massachusetts
/
6 O33 q\\
6.3.3.l.a VALVE TEST REPORT
,$.3.3.l, h S.s.s.a Test Procedure No. T-16289 Rev d g,g,3,3 Quality Assurance Instructjon:
MOOO SE V M Date:
9-/f-8d Test No.:
///A Test Procedurg No. : 7 - Af 3 99
&ua Size and Style Valve:
6 'Elo a n 7-i FA/
Set Pressure: /Jr r,.jj Crosby Compenent Serial No.: Nt,JM9-co eta Assembly No. :n/ v 7 Se 7 Crosby Factory Order No.: Atu4303 Item No. 3 Drawing No.: DS c -&a:;e9 Rev. M Customer's Mark or Tag No.:
I PM - 3 0.9 3 Custcmer's Order No.: Pf7v e/v c.
0 0 64 kd'
- II 1.
Hydrestatic Test SEE S/Edr /
1 l
Nozzle Dise Insert Valve Body (Outlet)
Pressure:
Time:
f Reaults:
i / //
f f
Test Cage No.:
Cage Calibration Date:
/
/
i Water Test No.:
Tested By:
Date Date Date j
Reviewed and l
Accepted By:
Date Date Date 1
2.
Final Setting Tests (Steam) 2.1 Valve Data Run Final Spring No.: //M 837f No.
Open Close Blowdown Ring Setting: N.R.:
rs-1
/200
//f6
- 1. 7 C.R.:
+ /_T J 2
in1 t![4 J. 7 Ambient Temperature: -79 * /
3
/Jor
//ff-V/
-2 {
Test Cage No.:
V0/6 4
v/#.-
7 Cage Calibration Date: 1/9/rc 5
N/,4
?
.j 2.2 Seat 1.eakage (Steam)
M 7 J 0-Pressure:
/d i 3 p r,'4 Tested,Ry.L.
Time:
34:e
(/
V Date-f1T Results:
,l
/
Reviewed and I l Test Cage No.:
V4 /l, Accepted By: (,8 f'/3N i
Cage Calibration Date: f/q/fo W
Date Final Rieg Setting: N.R.: -W Set By: Q. a d,.
9 ~ ~OO G.R.: f 150 p'
~~
Date i
sEcmn l
4f2 7-/7-70
--==u--
i
VALVE TEST DATA N/0/%
Sus 11ty Assurance Instructicn: #32 06O Date:
+' Test Number:
N/A Test Procedure Number: F /6'792 Ran/.O Size and Style Valve: G R JO HA #)5 FA/
Set Pressure:
/2 /O ex./.s.,
Crosby Component Serial Number: A)62569-CO-001/
Assembly Number: A/62569 Crosby Factory Order Number: N6>55'5' Ites: 1686 Drawins Number: CSC-62Sdi? Rev.p Customer Mark or Tag Number: 1 PSY-3028 Customer Order Number: PA V -'l&G 1.
Binh Flow Test Facility (H.F.T.F.)
1.1 Operational Test Run Open Accus kasest Back-Blow-Lift
Temperatures ---
Mo.
pois psia pois Pressure down %
inches Sprina Body Ambient Spring No.: A/X 33 78 1
t Zei
- 24a'
// G o 203
- 4. (
t.o9
'73 329 78 Final Ring Setting:
2 24 0
- 250 (IfG lol 4L (
/.s /
&O 240 79 n.R.:
-t3 0 3
s201 8248 IIC8 l Zes"
- 4. ~5 t.o 0 73 z$8 71 C.R.:
- $~D Instrument Calibration Date: M-/O-80 Tested By:
d Reviewed / Accepted By:
Y~ /d ' N 1.2 Seat 14akase Test Seat Leak Pressures iCPT PS/6 rested By:
a --J Do p]
U Test Time:
r Results:
D Aj 6dI7 $ /T,7CM, Reviewed / Accepted I th I
&O '
2.
Production Test Facility (500 Ft.3) 2.1 Set Pressure Verification Test Test Cage Serial Number P59(li4GE
.N2Y Run Open
, '[ '
Cage Calibration Date 8/-//c/%
No.
psia
- )Q
.. ).
4%I 9 A//A af N/A d
g, 2.2 Seat Leakane Test Seat Laak Pressures iOTO PS/[r Tested Sys' Test Time:
't # tato ff 6 E
A' Results:
SADSF4d rDE V Reviewed /AINptedBy: -
~~/ /""'
Test cese Sertal Number:Os#Gasr #29(*f V
Cage Calibration Date: 48/10/ M Ring Setting (As Shipped):
N.R.: -/30 Set Sys M gd awm uw sr www =>. s ria w
E..?.1. 1 f
1 CROSBY V A LV E O GAGE COMPANY CROSBY WRENTHAM, MASS T
FORM NY-1 F051 SAFETY AND SAFETY REl.IEF V/1.V55 Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. ttanufactured By Crosby Valve & Cage Company. 43 Kendrick St.. Wrenth w. U 02093 Name and Address Model No.
HA-75-FN order No. N64343 Cont r.ac t Date 3/5/79 Nattonal Board No.
Georgia Power Corp., P.O. Box 4545
- 2. Punufactured For Atlanta, Georgia 30302 order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3024 Serial NoN62569-00-0015 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Size R
6 10 Pipe Size -- Inlet outlet Safety, Safety Relief. Pilot.
Inch Inch Inch Inch Power Actuated
- 6. Set Pressure (psig) 1220 576 p
Rated Temperature 919 b 8!
h
't0ve rpressu re Blowdown (psig)
Stamped Capacity
~~
Hydrostatic Test (psig) Inlet 1845 outlet N/A (Apnlicable to Valves for Closed Systems Only)
Pressure Retaining Pieces Serial No.
itaterial Specification gN((f Identification Including Type or Crade
- a. nurattga Forgings g
Body N92894-31-0004 ASME SA105 Bonnet N92953-33-0025 ASME SA105
- b. Bar Stock & Forgings ASTM A193-76 Gr. B6
]ja M Pter N90087-39-0138 ASME SA193 Gr. B6 -
Nozzle N92896-32-0020 ASME SA182 Type F316 Dise Insert N92898-34-0104 ASME SA637 Gr. 718 N92950-32-0012 Soring WashersK62821-25-0002 N92951-32-0015 ASME SA105 Adjusting BoltK63649-25-0031 N93583-25-0031 ASME SA193 Gr. B6 Spindle K63648-03-0054 N88895-65-0371 ASME SA193 Gr. B6 l
- c. Sprina K62821-25-0002 EX3.378-31-0005 ASTM A689-74
- d. Bolting
- e. Other Pieces
%., - o.,a N91614 ASME SA193 Gr. B7 Bontid Sut~
N88481 ASME SA194 Gr. 2H k
l
r-E. el. l. A CERTIFICATE OF COMPLIANCE k'e certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components.Section III, Div. 1, 1974 Edition, Addenda Winter 1975
, Code Case No.
2 (Date)
Class
/
' ' c%
4//#/fo Signed Crosby Valve & Gage Co.
by_ V V Date (N Certificate Holder)
Our ASME Certificate of Authorization No.
1878 to use the NV symbol expires September 30, 1980 (Date)
CERTIFICATION OF DESIGN Design information on file at evnehy v > pre g co gg e~ p..
Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No.
16ss?
Stress report certified by'
~~-
PE State Reg. No.
1Signature not required - list name only.
CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7// 7, 19h and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components.
By signing this certificate, neither the Inspector-not his employer makes any warrant, expressed or implied, concerning the equipment described in this Data Report. Further-more, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date
" ~/ [ / 19 '
Commissions 4
- A <: ' / 2 (> (~.
Signed i,'. (i
'/ / /<
s (Inspector)
(Nat'l. Bd., State, Prov. and No.)
g
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
hf
'ECNia 412 l -
i 3.. c t,
CROSBY VALVE & C ASE CO"PA';Y 5.3.3 Wrtnthan, Massachusetts
,o g, g,3,), a
- b VALVE TEST REPORT 9
s.3.3. a-
[
TestProcedureNo.T-16289Rev.d b
- b* b b sob M2 Date:
9 es'.iro Quality Assurance Instruction:
Test No. :
A 1R
_ Test Procedure No.:P /(#2 F9 XET/. A 1
Size and Style Valve:
la Tin M14.qaf #Al Set Pressure: /220.T /Q Crosby Ccmponent Scrial Ro.: M (s 35(s9-On-o:3L5 Assembly No.:M /oM 69 Crosby Factory Order No.: AJ7,4hyi/'3 Item No.
4/
Drawing No. :n-c-(,aST,q' Rev. 8 Customer's Mark or Tag No.: I
- p s / - 3 0r3 4
' Customer's Order No. : 'Pg V 4//,/s 1.
Rydrostatic Test sl* Ei S M E /
Nozzle Dise Insert Valve Body (Outlet)
Pressure:
/
i Time:
- / /4
.,/.
./
Results:
f/f
/L/ / &
___ A/ /A
/
/C
/
Test Cage No.:
Cage Calibration Date:
Water Test No.:
Tested By:
Date Date Date Reviewed and Accepted By:
e Date Date Date i
2.
Final Settir.g Tests (Steam) das l
2.1 Valve Data ANi-MS./.0,
j i
Run l
Final Spring No.:M 331$-3 I-D O OS' No.
Open Close Blowdown 3
Ring Setting: N.R.: -M 1
/.0 / 7
//4 y r3 v,31-%
1 C.R.:
+/SO 2
f2/S
//l.%
f.~2
+0E %
Ambient Temperature: 4 (, F 3
/'.7/1
// /. 1
.5'd W A *4
-2 l
Test Cage No. :
//o/ /e 4
Gage Calibration Date: f-/a -JD 5
- l l
2.2 Seat Leakage (Steam)
CM 7"/4^-M Pressure:
/d 93 Md,
Tested B -
~
Time:
h /A, tDate Results:
64 h S /h
... m. '
' Revle*wed and Test Gage No.:
4/o/ 4 Accepted By:
I i'
Cage Calibration Date:9 -fd-TO Date 9-AT-fd Final Ring Setting: N.R. : - 45' pg Set By:
,_z f
Date G.R. : 4/gc)
AECHTEL 412
- 1. n-f 0 1
., _,. _=__
T
- --a
VALVE TEST DATA
~
fMeg 32060 nate:
311ty Aaturance Instruction:
Tcat Number:
M[t4 Test Procedure Number: 'F/6't92 Fe-vo Sino and Style Valve: 68/OOA WFM Set Pressure:
/22 O s.s.i.9 o
Crcsby Component Serial Number: N62569-OO -00/5 Assembly Number: A/62563 Crschy Factory Order Number: A/62555~
leen: /49 Drawing Number: OS-C-62SCT Rev._O Customer Mark or Tag Number: / 9SV-302Y Customer Order Number: 4t/- b 6 1.
Eigh Flow Test Facility (R.F.T.F.)
1.1 Operational Test Run Open Accts Resent Back-Blow-Lift
Temperatures ---
No.
psia psia psia Pressure down %
inches Spring Body Ambient Spring No.: #f 3378 i
,225
- 2 6 it 74 20 2.
3.3 I. oG
/l4 saf 97 Final Ring Setting:
2
- 232 (24 2 t/(es 207 4,">
I. O S' st?
/99 42 N.R.:
13 0 3
I 22 i IZM 1I72-ZD E 3.%
l.10 to @
2D$
1&
G.R.:
- fD Instrument Calibration Date: t/ 84 s/ m/s G Tested By:
w Reviewed / Accepted By I4 w
1.2 Seat Leakane Test Seat Leak Pressure:
/0 98
/f9/d Tested By:
/_
<.4 84
() [' %/tc Q '
Test Time:
I bk /
C Results:
r>x/SA7754ACJDe /
Reviewed / Accepted By: N 2.
Production Test Facility (500 Ft.s) 2.1 Set Pressure Verif f cation Test Test Gage Serist h aber:
JJJf Run Open Gage Calibration Dates f//#/86 No.
Psia 1
/2 W 2
N/R 3
//19-2.2 Seat Leakate Test
/#
M Seat Leak essure:
1694mW Tested By:.
/>
h f
Test Times
_ q ed Results:
D r 7 5 / Tak-7 2 W Reviewed / Accepted By: 1 M W
Test Cage Serist R o bert J 72.T case Calibration Date:
t'//e/4/o Ring Setting (As Shipped):
N.R.: --/.30 04 >
- ~fC set By, % M bCLLeg g
.guswesewa iw,ew Janwn:
z>. d s k q. s -r
92.I.2
__J
]
zm w_ _. - __ __
CROSBY V A LV E O GAGE COWPANY C FT O S B Y i
J WRENTHAW, WA$$
f e
FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/1VES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufact.2 red By Crosbv Valve & Caee Ccrpanv. 43 Kendrick St.
Wrentham_. "A 0209)
Name and Address Model No.
HA-75-FN order No. Nb4343 3/5/79 ational Boaid No.
Ccint rac t Date N
Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Atlanta. Georgia 30302 Order No.
PAV-466 Name and Address
- 3. ome r Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 3. valve Identification 1-PSV-3025 Serial No.N62569-00-0019 Drawing No. DS-C-62569 Rev. B Type Safety R
-- Inlet out ht 6
10 orifice Size Pipe Size Safety. Safety Relief, Pilot.
Inch Inch Inch Inch Power Actuated 1235 576
- 6. Srt Pressure (psig)
F l
Rated Temperature 9
9
~
Sta ped Capacity
?.0verpressure Blowdown (psig) 4 Hsdrostatic Test (psig) Inlet 1853 outlet N/A (Apn11 cable to Valves for Closed Systems Only)
Pressu.c Retaining Pieces Serial No.
Platerial Spectfication Identification Including Type or Grade
,, ggs Body N92894-31-0007 ASE SA105 Ronner N92953-33-0016 ASE SA105
- b. F.ar Stock & Forgings yxubr,k.uayAdapter ASTM A193-W del C.i
^2 Bearin N90087-39-0125 ASE SAI93 GB. - B&,c sezzle N92896-32-0021 ASE sal'82 3Ype F316 Dise Insert
_N92898-34-0108V.['
ASE SA637 Gr. 718 N92950-32-0024i So ing washers K62821-25-0008 N92951-32-0023 'Y ASE SA105 Adjusting Bolt K63649-25-0030 N93583-25-0030 ASE SA193 Gr. B6
~
Spindle K63648-31-0005
'N88895-46-0209 ASE SA193 Gr. B6
- c. Sprang K62821-25-0008 lx3378-31-0003 ASTM A689-74 d.
Bolting q
- e. Other Pleccs Bonnet Stud h1614
_ _ - _ _ _ - _ _ _ _ASE SA193 Gr. B7
,___, ann n et_.Nur N88481 ASE SA194 Gr. 2H i
- a
- -
r'r iport updated to ret 1cet c a re c t' N.roatuuc teac prt.ssure.
e h. h. h.
I I
CERTIFICATE OF C0!!PLIANCE Uc certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the AS!!E Code for Nuclear Power Plant Components,Section III Div. 1, 1974 Edition, Addenda Winter 1975, Cuce Case No.
(Date)
Class 2
OO
/sho Signed Crosbv Valve & Gage Co.
by (T Datt
/
(N Certificate Holder)
V,F'
~
l Our ASST. Certificate of Authorization No.
1878 to use the s: r.bol expires September 30. 1980 (Date)
CERTIFICATION OF DESIGN Desien information on file at Crosby Valve & Gage Company Stress analys s report (Class 1 only) on file at l
Design specifications certified by Ada I. Pressman PE State California Reg. No.
16552
~~~
Stress reFort certified by
~~~
PE State Reg. No.
1 5ignature not required - list name only.
CERTIFICATE OF SHOP INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of ?tassachusetts and employed by Factory !!utual Systems
- of Norwood. ?!assachusetts have ir.cpected the pump, or valve, described in this Data Report on 7 /r7,19 70 and state that to the best of my knowledge and belief, the N Certificate Holdef h'as constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Cor.ponents.
Ly signing this certificate, neither the Inspector ng,r, h4a empl6',ed makes any warrant, y
e:: pressed or implied, concerning the equipment des ~cribed i'n 'this.Dgta_ Report. Further-r.o re, neither the Inspector nor his emnloyer shall be liable insanyma'nner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Uste e'7 / 8 "7 19 73I)
Signed O F u R d / n t.4 2 Commissions xAa s s 12.64-
/
(Inspector)
(Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston ?!anufacturers !!utual Insurance Company - }!utual Boiler & Machinery Div.
I In
6.3.3 5' 5'
- '9 I
- ,%p 5 3. 3. l. b f
CROSBY VALVE & Cl.0E C0' T/J.7 Wrentha., Mass.;husetts 6.3.3.A VALVE TEST REPORT-q' 53.3.'S Test Procedure No. T-16289 Rev. c2.
Quality Assurance Instruction:
M 06 B 6M el Date:
.S -A7 - 70 I
Test Procedure No.:
7-jz,tgg g,3 v,.2 j
Test No.:
NjA Size and Style Valve:
6refn pn rc ; rd Set Pressure:ja gr rfg i j
Crosby Co: penent Serial No. : g67) c4,9-en-on,9 Assembly No.: A/4J549 I
Crosby Factory Order No.: A/64 3 4 3 I t e:- No.
6-Drawing No. : ns-c-cas c7 Rev. /3 _
l Custoner's Mark or Tag No. :
/ 8V
.aox-Customer's Order No..
pg/- q g, t, 1.
Hvdrostatic' Test f
Nozzle Disc Insert Valve Body (Outlet)
Pressure:
lES3 Pst G J ES3 PE/ 6 3co P.S.< 6 Time:
t c.,m,'re ra n e nrod O o rito M JECHig; wismru sn Results:
SATos m arr Test Cage No.:
3 / 6, 5
MS' fo3 Cage Calibration Date: 5-M-76 mat-70 6 7o Water Test No.:
595-5 94
.Sg.f-412 Tested By: Q %
5-30-80
&aw527-70 k 4/ N u/ 6-9-8
"*"';"* M M @ Q d A
$, O 5 / d o
@ 9 "yate Date 3 t -f d Date 3"
S
~
bate V
Date V
Date T3W S/3oigo
%wnuS1&lPO 2.
Final Se ng Tests (Steam) 2.1 Valve Data 4/3C, P s / 4,.
Run Final Spring No. : NX.33">f No.
Open Close Blowdown Ring Setting: N.R.:
3C-1 f_n 9
// 49 te / -1.fEg
/4n/d G.R.: sigo 2
/Ap 9
//c,9 g, n A:-bient Tc=perature : %op 3
fa o g
//6g f,, / 4. 70'/[
-2 I
Test Cage No.:
4.c is 4
af /,./
/'t=-
l Cage Calibration Date : '?-/4-Eo 5
4/a 7>
/
2.2 Seat Leakage (Steam)
Pressure:
/ I olo Ps/6,.
Tested B T4 4
7-//88
..ul"",i.g.
Date Time:
-a m /,0.
Results:
S AT-
. Revfe,w,,ed and y_/ t/_gg g.,
Test Gage No.:
4 A/6, Accepted By: d,,ws Cage Calibration Date: 0-M-Ed V
Date Final Ring Setting: N. R. : _.3 S' Set By: O
[
,)
c)
G.R.: +,,o r
Date
WRENTHAM, MASSACHUSETTS VALVE TEST DATA 4t./984 31'ity Assurance Instruction: 3206o Date:
Tcot Number:
M /d Test Procedure Number: T-/6'f92 j@rt/ O Siso and Style Valve: 6RIO MA #)5 FM set Fressure: / 2 & f e.s. 4 Crosby Component Serial Number: N62567-OO-OOl3 Assembly Number: M62569 Crocby Factory Order Number: MOSSI Ites: /8f Drawing Number: 18-C.-62F67 Rev._D, Customer Mark or Tag Number: _f R9V 3o26 canto.er order No.ber: pt.wi-qv c 1.
Elah Flow Test Facility (N.F.T.F.)
1.1 Operational Test Run Open Accum Resest Back-Slow-Lift
Temperatures ---
No.
psia psia psia Pressure down %
inches Sprina Boey Ambient Spring No.: afx3378 1
iz M tt74
/'7f zo c.
4.4
/.o9 W
19&
74 Final Ring Setting:
2 124 2.
8473
//7/
20 2
- 5. "Z.
/.08 88 ifJ 7f N.R.:
-f 3o 3
izar.,
sz7o it7 s 203 f,I
/, #
90
- 95 7 s-l C.R.:
ID Instrument Calibretion Dete:
M-T &
hY
/[f/m Tested By:
Reviewed / Accepted t w 1.2 Seat Leakate Test Seat Leak Pressure:
,// 2
[S/d Tested By:
Y E
- ^ - -
/Q V'
Test Time:
Results:
Uan4DS FACJ$AY' Reviewed / Accepted By/cd I Y-9"b N
2.
Production Test Facility (500 Ft.s) 2.1 Set Pressure Verification Test Test Cage Serial Ilumber: Cf6/ Cnt7E
'2.M Run Open d
Cage Calibration Dates V/2/Ps No.
9811 1
92d (e rf - ^
2 a(A
~
3 NfA 2.2 Seat Leakate Test I
Seat Leak Pressures r i 2. l e S/[r Tested By:
Test Time:
~3 niusrtes Results:
C A n 4 f A r,7 V /2_ V Reviewed / Accepted Dy
,,,j p(2((#
Teat Case Sertal Reber:DkSt-GiesW' M272Y g
Case Calibration Date:
4/to/P6 Ring Setting (As Shipped): s.R.: -/30 Set 9 :
b AA J W,2 7
GM4 rale 6wV 2B'So J{ nrPabvAL n, f. f% 4-zd-t G
O
- l. 2-1 r
CROSBY V A LV E O GAGE COMPANY C FT O S B Y p
WRENTHAW. MASS s
FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/1.VES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. 43 Kendrick St.. Wrentha-. MA 02093 Name and Address Model No.
HA-75-FN order No. N64343 Contract Date 3/5/79 National Board No.
Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Atlanta. Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin k*. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3031 serial No.N62569-00-0004 Drawing No._ DS-C-62 569 Rev. B Type Safety Orifice Size R
pgp, si,, -
Inlet 6 outlet 10 Safety. Safety Relief. Pilot.
Inch Inch Inch inch Power Actuated
- 6. Set Pressure (psig),
1185 576 F
Rated Temperature 893160 lbs/hr sag 3
,gy,,,,,,,,,,
Blowdown (psig) 7 M of S.P.
Stamped Capacity Hydrostatic Test (psig) Inlet 1845 outlet N/A (Apnlicable to Valves for Closed Systems Only)
Pressure Retaining Pieces Serial No.
Material Soecification Identification including Type or Grade a.ItsM qu Forgings (Jg Body N92894-31-0005 ASME SA105 Bonnet N92953-32-0004 ASME SA105
- b. Bar Stock & Forgings
- Pter i
(
N90087-39-0151 ASME SA193 Gry BR '.
Nozzle N92896-32-0031 ASME SA182, Olfr nsert ASMRN67Gr. 718 Dise N92898-33-0082_-.
N92950-32-00(6V.\\ a.,.. '~
Spring WashersK62821-25-0015 N92951-32-00ZhnT f's
ASME SA105 tw -
Adjusting BoltK63649-25-0032 H3583-25-0032 ASME SA193 Gr. B6 Spindle K63648-03-0057 N88895-65-0369 ASME SA193' Gr. B6
- c. Spring K62821-25-0015 NX3378-31-0036 ASTM A689-74
- d. Bolting
\\
6 T. 7. l.1 CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components.Section III, Div. 1, 1974 Edition, Addendr. Winter 1975
, Code Case No.
2 (Date)
Class Date M/S//o Signed Crosby Valve & Gage Co.
by
' r_
(N Certificate Holder)
V(
Our ASME Certificate of Authorization No.
1878 to use the hT symbol expires September 30, 1980 (Date)
CERTIFICATION OF DESIGN Design information on file at cronhy valvo i. engo renanv Stress analysis report (Class 1 only) on file at j
Design specifications certified by Ada I. Pressman PE State California Reg. No.
16552 Stress report certified by
~~~
~~~
~~~
PE State Reg. No.
ISignature not required - list name only.
1 CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid coenission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood Massachusetts have inspected the pump, or valve, described in this Data Report on
'/ / ', 19 1 and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Co=ponents.
/j m i l
By signing this certificate, neither the Inspector nor'his employer makes any warrant, j
expressed or implied, concerning the equipment described in this Data Report. Further-
)
i more, neither the Inspector nor his employer shall be liable in any manner for any
}
personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date
~/
7 19 f
Signed
! '*' i e
f
/
t Commissions l' M 9C' / 7 [. [,
(Inspector)
(Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler 6 Machinery Div.
(([
412
gh
.6,g 3 CROSLY VA1.VE & CACE COMPANY Wrsntha:n, Massachusetts s5. 3. 3.1.o VA1.VE TEST REPORT O 6. 3 l. b
- 5. 3. 3.1 Test Procedure No. T-16289 Rev. a
- 5. 3. 3. 3 Quality Assurance Instruction: 34O90 Oc'D 2 Date:
7- /f-d Test No.:
N/A Test Procedure No. -T" 163 29
- (p2/. J Size and Style Valve
- (a d 10 R4 75 /d Set Pressure:#rd-f / ay, Crosby Component Scrial No. :A! L, 3 &i Oo o Y Assembly No.: M e0 % 9 Crosby Factory Order No. : M (44 343 Item No. /
Drawing No. :D5 c. (fMd ? Rev.L Customer's Mark or Tag No. : / 'PSV - @3/
Customer's Order No.: V N V
'/uu C.u st. ik."4 1.
Hydrostatic Test g.g Nozzle Dise Insert Valve Body (Outlet)
Pressure:
Time:
Results:
Test Cage No.:
Cage Calibration Date:
Water Test No.:
Tested By:_
Reviewed and Accepted By:
Date Date Date i
2.
Final Setting Tests (Steam) l 2.1 Valve Data Run fs,j pij r);
Final Spring No. : /JP 317F No.
Open Close Blowdown Ring Setting: N.R.: -Nr 1
d 7G eigs y/
C.R.: r ISO 2
I.77 ii.r f.
- v. Y I
2l Ambient Temperature:
50 3
is 7 7
//.2 r uu Test Cage No. :
6'd/ s 4
A/# -
Cage Calibration Date: 9/,2/to 5
///4
/
,l t
2.2 Seat Leakage (Steam)
Pressure:
/of8/5E Tested By:__ h [M f.r.[pe,
~
.[/
/,
4/
Data Time:
?,, a Results:
SJ T 9
' Reviewed an n
Test Cage No. :
'/0/d
. Accepted ~By: "E V
Cage Calibration Date: 74r/e Date Final Ring Setting: H.R.: - M' Set By:
I-9 '/f-80 l
C.R.:
}- / S 0
(( ~
Date EEV lilO3r 9 /6-r0
VALVE TEST DATA 2!
/NN 2-27-f(,
320 @
Date:
Qual,1fy Aseurance Instruction:
Tset Number:
M/f4 Test Procedure Number:
'T~-/s Y92. /Rev. ( >
Sise end Style Valve: 6 R /c HA '15'-FA/
See Fressure:
l I Ps o.s.t.,.
Cresby Component Serial Number: N6.2567-CO-coo Y Assembly Number: M62569 f
I Cresby Factory Order Number: N69M Ites:M Drawing Number: DQC.gac;fy 3 y,1 Customer Mark or Tag Number:
1 PSt/- 303/
Customer Order Number: pat / -4/c5 1.
Binh Flow Test Facility (H.F.T.F.)
1.1 Operational Test Run Open Accus Reseat Back-Blow-Lift
Temperatures ---
No.
psia psia psia Pressure down %
inches Sprina Body Ambient Spring No.: Rd378 1
ff 8h 12'/3 li l-8 II Z-
'd.$
l of Iav 3/ Z d/4 Final Ring Setting:
2
'I88 82 38 l' E C,
,7 '/
(.0 I. o 7 i ci'"
3o9 sv/4
~ l b 5" 3
l' 8 (*
- l' 3-(
Ii L G IT b 50 I. 0 &
/C17 3I3
/
/4 A N.R.:
C.R.:
- s~O Instrument Calibration Date: 2 - 3 7-8lo he__f w d r > /a /*
Teeted By:
Reviewed / Accepted By:
I 52/(&
1.2 Seat 14akane Test Seat leak Pressure:
/O(.p7 Sh Tested By:
_A *t F.7 #4
' }/j
" V "' Y!/A.d Test Time Results vAI% TIS /:~/%C 7Pe?./
Reviewed / Accepted By:
/
aw a/.,,gb 2.
Production Test Facility (500 Ft.8) 2.1 Set Pressure verification Test i
Test Cage Serial Number:
27,29 Run Open Cage Calibration Dates 7/J//66 No.
psia 1
If8 [
2 AJ $ A l
3 N/A 2.2 Seat teskate Test
[J/)t,e MJ/ 8(*
Seat lask Pressures
/ O l#ls bld' Tested By: '
/
Test Time:
T HI4. toff 6 g
Results:
3A ris fAc.TDit V Reviewed /AcceptedByth 2* M
- m Test Cage Serial Number
,2 U T
~~
' * ' ~
Cage Calibration Date:
1/37/8/v Ring Setting (As Shipped):
N.R.: - 1 (# C
.: "" N 1
Set By:
^ ~. Y8
\\
/
l EM&1A1estwG namw ORYaosie :
% G 756G.
af-9 -t <*
P..'?. /. A f
1 CROSSY V A LV E O GAGE C0 0 P A N Y CROSBY r
WRENTHAM, MASS i
j FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/tVES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosbv Valve & Cage Company. 43 Kendrick St.. Wrenthms. MA 02093
~
Name and Address Model No.
HA-75-FN order No.N64343 Contract Date3/5/79 National Board No.
Georgia Power Corp., P.O. Box 4545
- 2. Phnuf acture.d For Atlanta, Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification l-PSV-3032 Serial NoN62569-00-0008 Drawing No. DS-C-62569 Rev. B Type Safety orgggce g,g,,
R Pipe Size ~ Inlet 6 Outlet 10 Safety Su%, Relief. Pilot.
Inch Inch Inch inch Power Actuated
- 6. Set Pressure (psig) 1200 576 r
Rated Temperature 904331 lbs/M sag 3
?. overpressure -- atowdown (psis) N Stamped Capacity Hydrostatic Test (psig) Inlet 1845 outlet N/A (Apnlicable to Valves for Closed Systemn Only)
Pressure Retaining Pieces Serial No.
Material Specification Identification including Type or Crade kg a.x5eartnqp Forgings Body N92894-31-0008 ASME SA105 Bonnet N92953-32-0006 ASME SA105
- b. Bar Stock & Forgings ASTM A193-76 Cr. B6 M "J M pter N90087-39-0152 ASME SA193 Cr. B6 Nozzle N92896-32-0006 ASE SA182 Type-F316 I sert Disc N92898-34-0103 ASE S A63? Cri "718 N92950-32-0030
~
Spring WasherE62821-32-0028 N92951-32-0035-ASME SA105 I,,:p Y ^,
Adjusting Bo1E63649-25-0004 N93583-25-0004 ASME SA193 Cr. B6 l
Spindle K63648-03-0055 N_88895-66-0375 ASME SA193 Gr. B6
- c. Spring K62821-32-0028 b')L3_3.78-31-0004 ASTM A689-74
- d. Bolting
- 8. 2. /. A CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components Sectior.
1974 Edition, Addenda Winter 1975
, Code Case No.
III, Div. 1, 2
(Date)
Class Date M/S/f4 Signed Crosby Valve & Cage Co.
by e 7
>r (N Certificate Holder)
{'
1878 to use the NV Our ASME Certificate of Authorization No.
symbol expires September 30, 1980 (Date)
CERTIFICATION OF DESIGN Design information on file at c rn a y v, n.,
t r%
7,,,,
Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No.
16552 Stress report certified by
~~~
--~
PE State Reg. No.
lSignature not required - list name only.
CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 /i /
, 19 V U
~
and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components.
... -, n I *,,,*
- By signing this certificate, neither the Inspector nor his ehployer makes any warrant, expressed or implied, concerning the equipment,Je,$cr.ibed'in'this' Data Report. Further-more, neither the Inspector nor his emol' oyer shall be liable in any manner for any i
personal injury or property damage or a loss of any kind arising from or connected with l
this inspection.
- Date,
- /
7 19 Signed
)3:,
,.I.-
Commissions B l F7-(Inspector)
(Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
l k
j h ft:bj dia
CROSBY VALVE 6 CV,E CO:'PA'.Y Q
Wrentham Massachusetts
$, 3,3 e
~
}
VAI.VE TEST REPORT k
5 3. 3. l. b Test Procedure No. T-16289 Rev. M S* 3.3. A S. 3. 5. 3 Quality Assurance Instruction:
40(r0
[4 &
Date: _
9 - /4 -80 Test No.:
Ar/A Test Procedure No. : ( /(pAf f
//V. JL l
Size and Style Valve:
(a T/o
- A 75 /A/
Set Pressure:/2mo.f/ ar, l
Crosby Component Serial No.:iM GpA5(s9 - 00 0 P Assembly No. ://fpAJ'69
~~
Crosby Factory Order No. : #dp431fJ Item No._al.
Dra.ing No.:1Lt.d. As eg9 Rev. M Customer's Mark or Tag No. : 1 PSV - 30.94L Cu.scomer's order No.:_749./46 CA1Lb Id.Y 1.
Hydrostatic Test _ M,$(g/'g /
Nozzle Dise Insert Valve Body (Out yt)_
i Pressure:
. /
/
Time
/V /W
//
A// //f' Results:
/
///
fl/ ////-
/// /i/,L Test Cage No.:
Cage Calibration Date:
/
Water Test No.:
/
Tested By:
Date Date Date Reviewed and Accepted By:
Date Date Date i
2.
Final Setting Tests (Steam) 2.1 Valve Data 4-BS C D/,&,
Run Final Spring No. :///f _Qf $/-d e#
No.
Open Close Blowdown Ring Setting: N.R.:
,9 9 1
//f /
//t/ 2-S S*
'd C.R.:
f/SO 2
//77 11 5 0 Jf W
Ambient Temperature: 664/
3
//fd
//a//
M')
M /.2fo
-2,
Test Cage No.:
/./d/6 4
Cage Calibution Date: fr-/42-/b 5
2.2 Seat 1.cakage (Steaml Pressure:
// M (D//,
Tested B -
71
- 9.A-.-/h d
Time:
R /h M/ r (Date
'b 7, <,f,u rm/ _,
Results:
3 4
/
Reviewed and fg Test Cage No.:
MO /[o
.A f
Cage Calibration 'Date:f /g U"'"q9ep.ged By':
I Date Final Ring Setting: N.R.: -I Set By [ [ A,u m.t 7 $/d-TO C.R. :r/5U T
Date I
T n-fo EEGiTil 412
_.. _ _... =.._.___.. _,_ _. _ _-
- m. - - _ _-
.._. s. -.
WRENTHAM, MASSACHUSETTS
~
VALVE TEST DATA
)
Quility ' Assurance Inscruction: 32060 Date:
N3/PC Tcot Number:
N/A Test Procedure Number: %/6 992 /fet). O Stae and Style Valve: 6R /O #A 957W Set Pressure:
/ 2 0 0 o.s.*.g.
Crosby Component Serial Number: //62667-CO-COOP Assembly Number: /V625h Crosby Factory Order Number: NO555' Item:16L/- Drawins Number: $C(25'69 Rev.)
Customer Mark or Tag Number: - 1.'MSI/- 3032.
Customer order Number: PA t/-#& G 1.
Eigh Flow Test Facility (N.F.T.F.)
1.1 Operational Test Run Open Accum Reseat Back-Blow-Lift
Temperatures ---
No.
psia psia psia Pressure down %
inches Sprina body Ambient Spring No.: pfX337f' 1
ll18 sZ67 fifZ
( 9(,e sl. 0 t.od 10 7 Zt {
74 Final Ring Setting:
2 f203 8df7 t if'4-19 G*
- 4. O f.oy (09 2r9 90 N.K.: - 12 0 3
I20 Z LLC 7 it s49 I fGr si. 'S l.04 ft 5 ZZg 79 C.R.:
-s oo Instrument Calibration Date: d 3-86 Tested tyr Mh m
3 3C Revfowed/ Accepted By:
=/!f[df w
1.2 Seat Leakane Test
- !J C
Seat Leak Pressure:
/096 PS/6 Tested By:
flirgo}
I Teet TLee:
~
s/f)/nf Results:
UAISATo br:ACTD(C'f Reviewed / Accepted by2Coku f N
2.
Production Test Facility (500 Ft.s) l 2.1 Set Pressure Vertiteation Test Test Cage Serial Number:
J7d29 Run Open Case Calibration Dater
- /7/Bf::p No.
psia BECNTEL j
1
.. sv2 l
2
/M 647 3
N/#
l 2.2 Seat Leekane Test l
Seat Leak Pressures
/d [ d eSA#
Tested Dy
/1/3 /
7
{
.b Test Times JAn/ '
Y* 7 Results:
SarnJrArcrog)r Reviewed / Accepted Dy Je l
Test Case Serial lhamber:
J7o27 W
case Calibration Date:
if/7//h l
Rins Setti (As Shi
): 5.R.: -f30 I
C.R.: -too Set 91
'f-/0 ~TCe A)dWet M ESVIEss' J{,4ffAtch4t : 'b-[< W 4-31 N t
- 7. 7 l. A r
~
d CROSBY V A LV E O GAGE CO O P A N Y CROSBY r
WRENTHAM, MASS A
0 hkN '
OR SAFETY AND SAFETY REl.IEF V/IVES Q.C.-44D As Requ1 N by the Provisions of the ASMF. Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosbv Valve & nage Company. 43 Kendrick St.
Wrentham. MA 02093 Name and Address HA-75-FN order No. N64343 coner,c,n,,,3/5/79 Model No.
National Board No.
~
Georgia Power Corp., P.O. Box 454)
- 2. Phnuf actured For Atlanta, Geornia 30302 order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3033 Serial NoN62569-00-0012 Drawing No. DS-C-62569 Rev. B 8
b 0
~~
Type Orifice Size Pipe Size Inlet Outlet Safety, Safety Relief, Pilot, Inch Inch inch inch Power Actuated
- 6. Set Pressure (psig)
F Rated Temperature 911779 lbs/hr sat 3 Stamped Capacity 1
?.0verpressure --
- 57. of S.P.
Blowdown (psig)
'iydrostatic Test (psig) Inlat 1845 N/A ougg,,
(Applicable to Valves for Closed Systems only)
Pressure Retaining Pieces Serial No.
Material Specification Identification including Type or Grade
- a. :Gezzbee Forgings 4/g Body N92894-33-0021-ASME SA105 Bonnet N92953-33-0014 ASME SA105 Bearkn nas maapxt[ttusAdapte ASTM AP3-76 Cr. B6 N90087-42-0196 ASME SA193 Gr. B6 Nozzle N92896-32-0028 ASME SA182 Type F316 Disc Insert N92898-33-0090 ASME SA637 Cr. 718 N92950-32-0027 Spring washerd(62821-21-0017 N92951-32-0030 ASME SAlOS' Adjusting BolcK63649-25-0029 N93583-25-0029 ASME SA193 Gr. B6 Spindle K63648-03-0049 N88895-64-0364 ASME SA193 Cr. B6
- c. Spring K62821-21-0017 NX3378-31-0021 ASTM A689-74
- d. Bolting l
l
V20k1
i
~
3
- 7. c2. /.. L CERTIFICATE OF COMPI.IANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components,Section III, Div.1, 1974 Edition Addenda Winter 1975
, Code Case No.
]
2 (Date)
Class Date M[/f/[J Signed Crosby Valve & Gage Co.
by n--
(N Certificate Holder)
()
Our ASME Certificate of Authorization No.
1878 to use the NV symbol expires September 30. 1980 (Date)
J CERTIFICATION OF DESIGN Design information on file at r*rn e M, t%1yg g ry g gg__ = 7 g
Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No.
tuo Stress report certified by PE State
~~~
Reg. No.
1Signature not required - list name only.
3 CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systens*
of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 / / 7, 19G and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant
]
Components.
By signing this ce'rtificate, neither the Inspector nor his empi, oyer makes any warrant, more, neither the Inspector nor his employeY'sI0dile$)eAJn this' Data Report.
expressed or implied, concerning the equipment descr Further-liable in any manner for any i
personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date "7,/ ' 19 '" '.
t.,
// /'
Commissions h I c3 % 3 / > /, D Signed
}
/
(Inspector)
(Nat'l. Bd., State. Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
g
5.3.3. l.a Wrantham, Massachusetts
,s
~
5 3. 3. l. b VAI.VE TEST REPORT
- 6. 5.3.2.
.h TestProcedureNo.T-16289Rev.k b* 3* 3 3 Quality Assurance Instruction: OMMO N Y. d Date:
f-/3~-fb Test No.:
h/A
_ Test Procedure No.: 7 - /(gggg
&p, A Size and Style Valve:
L '116 M M ~78 #A/
Set Pressure:/2m * / *fo
~
N (p AS69 OO /JL Asseebly No.:Afd 3 ff,
Crosby Component Serial No.:
Crosby Factory Order No. : A/IP4/.94/3 Ite:n No..$
Drawing No.:Dlpd-63g6v Rev. J Customer's Mark or Tag No. : 1 SiSV - 30,3.7 Customer's Order No.: 'P Air -4 4(.
/
Cust. i+.* l,'L 1.
Hydrostatic Test g
pgg j No zzle Dise Insert Valve Body (Outlet)
Pressure:
4_
./
/
Time:
I
//I
!A/ ///-
s>/,
Results:
/
/ //'
M////
/
/
I '
g Test Cage No.:
Cage Calibration Date:
Water Test No.:
Tested By:
Date Date Date Reviewed and Accepted By:
Date Date Date i
l 2.
Final Setting Tests (Steam) 2.1 Valve Data
/ /S C) -Nd l
Run t
Final Spring No. : /./IN77 ~.'f/-odh No.
Open Close Slowdown 4.M' FC 1
/,93 /
//_5f" i.3 Ring Setting: N.R.:
/
G.R.:
-/- /50 2
/2 2.
//f_f 37 c) pog Ambient Tc=perature:
""7 /'f7 3
/d'Pe9
//fr Sr Mf/g
-2 ;
I Test Cage No. :
- 0/ e-4 Cage Calibration Date: 7 /y/b 5
2.2 seat 1.cakage (Steam)
Pressure:
[O[7 k$/de Tested B
, /
7 h b 9"/f *M Time:
, 3 m fA/,
(Date
%7/sj'A /d
- '.,,, y, g - - rs t '
Results:
g Reviewed and'.
ig 9)j;)Q Test Cage No.:
M Accepted,8y:_7 Cage Calibration Date: f"-/42-f)
'f Date Final Ring Setting: N.R. : - 96 SetBy:h uIm 9 */J-Fo C.R.: +)ST) f' Date I
JECH1EL i
412 9-17 80
'l
..=...u--
T
WRENTHAM, MASSACHUSETTS
~
VALVE TEST DATA s
)
Qu211ty asurance Instruction:
32060 Date:
3/3/Ms Tcet Number:
d[/S Test Procedure Number: %/6 8f92 feV.O Size and Style Valve:
A;N/O #A-95-FM Set Freseure: / 2 /o p.s.,p.
Crosby Component Serial Number:Al62569-cO-o o / 2.
Assembly Number: N 62567 Cr:sby Factory Order Number: N60555 Ites: /6@ Drawing Number:l6-C42567 Rev._~b Customer Mark or Tag Number: / A9)/-3033 Customer order Number: PA e w'Gr, 1.
High Flow Test Facility (H.F.T.F.)
1.1 Operational Test Run Open Acetas Resent Back-Blow-Lift
Tempe ratures ---
No, psia psia psia Pressure down %
inches Sprina Body Ambient Spring No.: A/t 12 78 1
2 2 t (.
- 2W ttS 7 act
- 4..I
/. o?
//o 19 7 7S Finst Ring Setting:
2
,L&
82 4 /
It O 20 o 4/, *I
- t. 0 6
/t1 7(f fJ N.R.:
'l50 3
+44 e 24 0 trif 14 )
- 4. 5 1.08 grg zg$
gf C.R.:
- 90
[
l
+4' Instrument Calibration Date: 8-3/-80 Tested By:
h
- 3 31 $ f.
Reviewed / Accepted B k1tff)
V 1.2 Seat 1.eakane Test
~j Seat Leak Pressure
/COS
[3/h Tested By:
c%
3 8
Test Times 3 h /A/ d T E 8 3II!A(
Results:-
Sp4"T75F4f,7D,2 */
Reviewed / Accepted By:
l 2.
Production Test Facility (500 Ft.s) alp 2.1 Set Pressure verification Test E
,g Test Cage Serial Number:
Run Open Cage Calibration Date:
No.
Esta k
2 3
647 i
2.2 ' Seat Leakane Test l
Seat Leak Pressures Tested By:
4 Test Timer Results:
Reviewed / Accepted By:
Test Case Serist Number:
Cage Calibration Dates Ring Setting (As Shipped):
N.R.:
-f 30
- - 4'O ME. %C.R./,//az See ny:
3 U'
,~
jWirtAMSA/N(, SW16sDl APPWM- ; 3'
P. 7. /. A.
r
~
l CR05SY V A LV E O GAGE COOPANY CROSBY WRENTHAM, MA$$
i*
T FORM NV-1 FOR SAFETY AND SAFETY REl.1EF V/IVES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & cage Comnany. 41 Kendrick St.. Wrentham. MA 02093 Name and Address Model No.
HA-75-FN order No. N64343 Contract oste 3/5/79 National Board No.
Georgia Power Cor P.O. Box 4545 Atlanta, Georgia $b302
- 2. Manufactured For Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vegtle Nuclear Power Plant Name and Address
- 4. 1.ocation of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3034 Serial NoN62569-00-0016 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Size R Pipe size -- Inlet 6 outlet 10 Safety, Safety Relief Pilot.
Inch Inch inch Inch Power Actuated
- 6. Set Pressure (psig) 1220 576 F
Rated Temperature 919226 lbs/hr sat, 3 M f S.P.
Stamped Capacity
?. overpressure -- Blowdown (psig)
Hydrostatic Test (psia) Inlet 1845 outlet N/A (Apnlicable to Valves for Closed Systema Only)
Pressure Retaining Pieces Serial No.
Material Specification Identificatio1 Including Type or Grade
- b. Bar Stock & Forgings
$$8M A @ Pter N90087-39-0157 ISE hA 3' Gr. Y6*
Nogale N92896-32-0019 ASME SA182. TypeiP31M. k ASME SA63hGtQl7M" '
Insert N92898-34-0105, Disc
'1 N92950-32-0020 i
Spring washersK62821-25-0003 N92951-32-0009 H.OI J ASME SA105 A5TM Al'3J-/b Ur DO Adjusting BoltK63649-25-0026 N93583-25-0026 ASME SA193 Gr. 86 Spindle K63648-01-0043 N91761-31-0021 ASME SA193 Gr. B6
- c. Spring K62821-25-0003 NX3378-31-0006 ASTM A689-74
- d. Bolting
j I. 2. /..L CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components.Section III, Div. 1, 1974 Edition, Addenda Winter 1975 Code Case No.
2 (Date)
Class 4 //.6~/94 Signed Crosby Valve & Gage Co.
by 4 9
/
Date (N Certificate Holder)
VV Our ASME Certificate of Authorizption No.
1878 to use the NV symbol expires September 30, 1980 (Date)
)
CERTIFICATION OF DESIGN Design information on file at Croshv valve A ca go ene nny Stress analysis report (Class 1 only) on file at__
l Design specifications certified by Ada I. Pressman PE State California Reg. No.
16552
~~~
Stress report certified by
~~
PE State Reg. No.
ISignature not required - list name only.
CERTIFICATE OF SHOP 1NSPECTISN I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Magsachusetts have inspected the pump, or valve, described in this Data Report on
/ !.
, 19.*f. '
and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components.
Ly signing this certificate, neither the Inspec;or nor his employer makes any warrant, expressed or implied, concerning the equipmen,t desqr,4he,4 4 pp. pay (Report. Further-i more, neither the Inspector nor his employer shdll be 11'abl,4,jf 4,anyjedinner. for any personal injury or property damage or a loss of any kind. arising;f,rget:oc, connected with this inspection.
' 19
- Date Signed
,'. 4 Commissions if4C"
' 2 / i.
' (Inspec t or)
(Nat'l. Bd., State Prov. and No.)
j l
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
g f
412
CROSBY VALVE & CACE C0"PANY o
5.3.3 Wrsntham, "assachusetts
- 5. S. S. I. o
).
VAI.VE TEST REPORT O-} b
- 6. 3. 3..a.
TestProcedureNo.T-16289Rev.d
- d. 3. 3. 3
?
Quality Assurance Instruction:
.3510 D
.1 Date:
9-/5~9 Test No.:
Ml8 Test Procedure No. : -T" /63 F9 l
Size and Style Valve: to R to M n 05 /~Al Set Fressure: /2;io r / /g
~
5 j
Crosby Component Scrial No. : ALag2,4 - oo -oo s(p Assembly No.: Allo 35(,9 Crosby Factory Order No.: A1(J 3(/3 Item No. 4f Drawing No. @.5 d.-(ad55>T Rev.g l
Customer's Mark or Tag No. :
'} PSV - 3 o3//
I Customer's Order No.:_7AV - //6g cost.W.# ll.
1.
Hydrostatic Test gg yy7 g
j l
Nozzle Dise Insert Valve Body (Outlet)
Pressure:
Time:
/
/
/
Results:
b
//
/ _
1/ / J Test Cage No.:
Cage Calibration D.pte:
/
/
Water Test No.:
/
Tested By:
Date Date Date Reviewed and Accepted By:
Date Date Date 2.
Final Setting Tests (Steam) 2.1 Valve Data
/. R S - P S//,,
Run Final Spring No. :pVf.Mf.J/- 0006 No.
Open Close Blowdown Ring Setting: N.R. : -SE 1
/J/(o
//4f' S/
V./78 G.R.:
+ 1 $~
2
/,2/ 7
//ft/
$~3
%3S Ambient Temperature:
6 TF 3
/2/7
//t,v
.f 3
/43.5"
-2 l Test Cage No. :
t/d/ (p 4
Cage Calibration Date: 7-/.2-80 5
2.2 Seat Leakage (Steam)
Pressure: /dfS* MS/A,
Tested B MIb E/dW Tinet 8 /M /A/
FDate l
Results:
SMe 5 F#dh a-Reviewed and Test Cage No. : h/b Ap ' W[M
/3M f-/J -fd 4fg W5'd Cage Calibration Date:
-0i
'gy Date E*O
' ' ' f6 U.'d Set By:
//-
S*/S'-90 Final Ring Setting: N. R. : - ff'
~
C.R.: +/SD y~
Date BECHTEL 417 Cl-n-70 s
t T
Ut5t9FT24
~
r-WRENTNAM, MASSACHUSETTS VALVE TEST DATA
)
QualitybsuranceInstruction: 32.o(O Date:
+/f/pg A/ 4 Test Procedure Number: T-/6992 Rev.O
/
Tcet Number:
Size and Style Valve: ts R10 #A 95-FM Set Pressure:
/ 2 20 p.s.t.p.
l Crosby Component Serial Number: N62569-00-ooI6 Assembly Number: N62569 l
Crosby Factory Order Number: N6755tf' Item:f,C f_ Drawing Number: M<-625f? Rev.}
Customer Mark or Tag Number: / Retf-303+
customer Order Number: PW-4(s6 1.
High Flow Test Facility (H.F.T.F.)
1.1 Operational Test Run Open Acetas Reseat Back-Blow-Lift
Temperatures ---
No.
psia psia psia Pressure down %
inches Spring Body Ambient Spring No.: Nif 33 78 1
I229 82 6 i
/165 207 4/. 2
/,,);
Ig]
22f 8T Final Ring Setting:
2 e E24 iM s/ W M
g, (
,. o 7
- 3 f}
TI N.R.: -l30 3 iLl7 826 % II W 20 7 d, i 2.07 I 2 fo T.1 A 9I C.R.: -SO Instrument Calibration Date: t/-J-hb Tested By: ) _e_ C Reviewed / Accepted B ///pt ' ~ 1.2 Seat Leakane Test Seat Leak Pressure /ON bib Tested By: 4 8 Al Test Time: "J N /Nurn G ~ Results: SA77 $fAc.?D P., Y Reviewed / Accepted B 4e 8/[s[$d Y . J,4 *J, Y \\ N k$ .gQt 2. Production Test Facility (500 Ft.s) 2.1 Set Pressure Verification Test pV ( {OIg @ia Test Case Serial Number Run n N ps Cage Calibration Date: No. 1 l 2 3 M7 j 2.2 Saat Leakane Test l Seat Leak Pressure Tested By: 4 } Test Time l Results: Reviewed / Accepted By: f ] Test Case Serial Ilumbert q i Cage Calibration Dates I Ring Setting (As Shipped): N.R.: a lIO l C.R.: -ID Set Dy MS-W /, JPL g&ianceires
- nentso 4 Moo w
- .: 3 6. fh tw #-
P.J.l.2 r d CROSBY V A LV E O GAGE CO M P A N Y t CROSBY J WAENIHAU UA03 e F FOR}f NV-1 FOR SAFETY AND SAFETY RELIEF V/IVES Q.C.-44D As Required by the Prnvisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosbv Va_lve & r. age Company. 43 Kendrick St.
Wrentha-MA 02093 Name and Address 3/5/79 HA-75-FN Order No. N64343 Contract Date National Board No. Model No. Georgia Powet corp., r.0. Box 454)
- 2. Phnufactured For Atlanta, Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3035 Serial nan 62569-00-0020 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Size p g p, S g,, -- Inlet Outlet R
6 10 Safety. Safety Relief. Pilot, Inch Inch Inch Inch Power Actuated 1235 576
- 6. Set Pressure (psig) r Rated Temperature 930397 lbs/hr sag 3 R f S.P.
Stamped Capacity 7,gy,,,,,,,,,, B;owdown (psis) Hydrostatic Test (psig) Inlet 1853 outlet N/A (Applicable to Valves for Closed Systems Only) Pressure Retaining Pieces Serial No. Material Specification khf[g Identification Including Type or Crade
- a. razungs Forgings Body N92894-31-0001 ASME SA105 N92953-33-0015 ASME SA105 Bonnet
- b. Bar Stock & Forgings b! M RpMPter N90087-52-0343 ASME SA193 Gr. B6 Nczzle N92896-32-0025 ASME SA182 Type F316 Insert N92898-34-0109 ASME SA637 Gr. 718 Dise 392950-32-0023 Spring WashersK62821-25-0011 N92951-32-0005 ASME SA105 Adjusting BoltK63649-25-0014 N93583-25-0014 ASME SA193 Gr. B6 Spindle K63'648-31-0012 N88895-50-0203 ASME SA193 Gr. B6 3 -$sf.
..,ib A689 74
- c. Sprins K62821-25-0011
.liX3R8-31-0032 ' AS
- d. Bolting
[
- e. Other Pieces Bonnet Stud 51614 ASME SA193 Gr. B7 Bonnet Nut N88481 ASME SA194 Gr. 2H
\\ FRON'
P.J./..L. CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components, Section III, Div. 1, 1974 Edition, Addenda Winter 1975 , Code Case No. Class 2 (Date) Date F//S/Pd Signed Crosby Valve & Gage Co. by Aw (N Certificate Holder) VV' Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Design information on file at ernchu Union
- p. rnen en - ny Stress analysis report (Class 1 nnly) on file at Design specifications certified by Ada 1. Pressman PE State California Reg. No.
16552 Stress report certified by ~~~ PE State Reg. No. 1jignaturenotrequired-listnameonly. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on
~7 h '1, 19 h and state that to the best of my knowledge and belief, the N Certificate Holddr has constructed this pump, or valve, in accordance with the ASMC Code for Nuclear Power Plant Components. By signing this certificate, neither the Inspector nor his employer makes any warrant, expressed or implied, concerning the equipment described in this Data Report. Further-more, neither the Inspector nor his employer.aball..sbo,Jiaueliktidy tenner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Date
- 1 !
- I' 19 I' ' '
1 L. i/ Commissions I l'/F / b /, Signed (Inspector) (Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
+ r i.. -. ,/, \\ CROSBY VALVE & CACE COMPANY ,A 0 6,3 3 Wrsntham, Massachusetts /g7 (,. de
- 5. 3. 3. l.ct VAI.VE TEST REPORT S. 3. 3. I. b l
S. 3. 3. 2 TestProcedureNo.T-16289Rev.d f, 3, 3, 3 l i Quality Assurance Instruction: 33Ol#O [/7/ 2 Date: 7 - /f-D Test No.: N/A Test Procedure No.: -r-/6aP9 # L= &fJL. Size and Style Valve: (a R. l b IJA 76 #Af Set Pressure: /-J35 T / '79 i Crosby Compor.en: Serial No.:N (m16(aT 0 o 2 0 Assembly No. : A//,3569 I Crosby Factory Order No.: Aj(o t/34/3 Item No. 5 Drawing No.: DSC-(aks(,9 Rev. A Customer's Mark or Tag No.: _/ PSV -30 M Customer's Order No. : "P AL/ -4//,(, cus+. M.
- 41o 1.
Hydrostatic Test g,r_ g ;/ur- / Nozzle Dise Insert Valve Body (Outict) 1 ? Pressure: Time: Results: / ,ff Test Cage No.: /$ ,f Cage Calibration Date: '/// 4///T /(/ / /l Water Test No.: '}/ / //' Tested By: Date Date Date Reviewed and Accepted By: Date Date Date 2. Final Settin: Tests (Steam) 2.1 Valve Data, Ope)n ps,) 2 Run p, Final Spring No.: A/F3 3 7 i No. Close Blowdo.m Ring Setting: N.R.: - 60 1 / ;L y/ f)cf J. 7 G.R.: 1/7s* 2 i a ts 12er 23 I Ambient Temperature: 77 3 / J u- ,209 2.2 -2 I Test Cage No. : 'fo/h 4 1 / 4 18-1 Cage Calibration Date: y/f.2/$s 5 '/,1. e .I 2.2 Seat I.eakage (Steam) J!>o Pressure: / //6/ p.,*e Tested By: [M f 1 Times h. '. ' (/ V Da'te ' Rasults: 54 r Revietted 'afM 'j Test Cage No. : %/4 Accepted By': Ledh > 9-/f<@ Cage Calibration Date: 9/,s/rj Data 0/2.2. Final Ring Setting: N.R.:. - (d Set By: .5 is+, G.R.: + / 7$- 9' Date 4 8ECNTEl l 41? T-17 -h .. -. = -. _.
.ms.. WRENT11AM, MASSACHUSETTS e VA1.YE TEST DATA Quality Assurance Instruetion: 32o60 Date: 4/2/N Test Number: A/!A Test Procedure Number: "T-/6V72. MGV,0 Site and Style Valve: M/O #A-75-FAJ Set Pressure: /2 35 P.S./.P. Crosby Component Serial Number: NG2569-OO-OO2O Assembly Number: N62569 Crosby Factory Order Number: N675'97 Ites: /6% Drawing Number:bS-C-62567 Rev.) Cxstomer Mark or Tag Number: / PSL/-ROM ~ Customer Order Number: PM-46 G 1. Eith Flow Test Facility (H.F.T.F.) 1.1 Operational Test, kun Open Accus Reseat Back-Blow-Lift
Temperatures ---
No. psig pela pela Pressure down % inches Sprina Body Ambient $pring No.: A/X 3 $ 7$ 1
- 2 2(, tES1 It8b 19 7 dl, O
- f. Cia 8' 3 198/
(p3 Final Ring Setting: 2 e2 30 f474 i 84 20o 4.I 1.09 &al (98 70 N.R.: -/OO s gzt2 ed! I% IA ] 14, ( ). I Q @d 292 7f C.R.: 'ID Instrsment Calibration Date: 4-246 Tested By: w% t/ 2.96 Reviewed / Accepted By t/.t.[q1 y 1.2 Seat 14akane Test Seat Leak Pressures ///2-PS/d-Tested By _ Gh V AC Teet TLee: ciaT5,Trs l':.*--2 f'2a7 d.rto-$c., Results: D A.I 6 A D S[4 C.TO QA ( Reviewed / Accepted By: Y As 2. Production Test Facility (500 Ft.8) ,s , Q\\ 5'*
- 2.1 Set Pressure verification Test j
s,' ',,. Test Cage Serial Number: J 7'19 Run ( '_Openpsia'a Cage Calibration Date: 9'/J/fg No.t* 0, n 1 i 'd : f 23r BECHTEL 2 6v a/4 647 3 J/i4 2.2 Seat Leakage Test Seat Leak Pressure: /// / 95/d Tested By: f12 4 b F d Test ilmet '$ MtN <.f rGS Results: S A ris PAC,rDtt y' Reviewed / Accepted By: f*2' m Test Cage Serial Numbers _ J72 f Cage Calibration Date: W/J///. Ring Setti e Shi N.R.:_ -10 0 .R.: - f0 Set 9 : f/O ~$fr 1 rgewemi, sunew iunom. : > WA Mtc-t
y.a.[.E(( ~ ~ ' " 'W 6TTnCHM WT 'n I CROSSY V A LV E O GAGE CO O P A N Y CROSBY e WRENTHAM, MASS F FOUt NV-1 FOR SAFETY AND SAFETY RELIEF V/1VES Q.C.-44D As Required by the Provisions of the ASME Code Rules I DATA REPORT Safety and Safety Relief Valves 1
- 1. Manufactured By Crosbv Valve & r. age Company, 43 Kendrick St.. Wrentham. MA 02093 Name and Address HA-75-ni Order No.N64343 Contract Dat 3/5/79 Model No.
~~ National Board No. GeorgiaPowercorp.,t'.O. Box 45b
- 2. Manufactured For Atlanta Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address 4: 1.ocation of Plant Burke County, Georgia
- 5. Valve Ide.,cification 1-PSV-3001 Serial NoN62569-00-0022 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Site R
6 10 pip, s g,, -- Inlet Outlet S1fety. Safety Relief. Pilot, Inch inch Inch inch Power Actuated
- 6. Set Pressure (psig) 1185 576 7
) Rated Temperature Stamped Capacity s h sag 3 7, g y,,,,,,,,,, -- Blowdown (psis) H f S.P. Hydrostatic Test (psig) Inlet 1845 Outlet N/A (Apn11 cable to Valves for Closed Systems Only) Pressure Retaining Pieces Serial No. Material Specification Identificaticn Including Type or Grade a.xmgaup Forgings 4Q Body N92894-33-0024 ASME SA105 Bonnet N92953-33-0035 ASME SA105
- b. Bar Stock & Forgings g j g {gpter N90087-52-0351 ASME SA193 Gr. B6 Nor:1e N92896-32-0027 ASME SA182 Type F316 Dise Insert N92898-34-Olli ASME SA637 Gr. 718 N92950-32-0037 Spring WasherE62821-21-0022 N92951-32-0017
,ASME SA105 Adjusting Bolg63649-25-0006 N93583-25-0006 ASME SA193 Cr. B6 Spindle K63648-31-0027 N88895-42-Alah ? g)C,AD b
- c. Spring K62821-21-0022 NX3378-31-003I.7
,;MbNfj[ht-pVRFW U
- d. Bolting
- e. Other Pieces
____ Bonnet Stud 614 ASME__SA193 Gr. B7 f Bonnet Nut N88481 ASME SA194 Gr. 2H fhM/ h
e h l . S. l. k CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components Section III, Div. 1, 1974 Edition, Addenda Winter 1975 , Code Case No. (Date) Class Date S// /fd Signed Crosby Valve & Gage Co. by (N Certificate Holder) VV Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Design information on file at croshv Vnivo A rw. rnmnnny Stress analysis report (Class 1 only) on file at Ada I. Pressman Design specifications certified by PE State California Reg. No. 16552 Stress report certified by' ~~~ PE State Reg. No. 1Signature not required - list name only. M h CERTIFICATE.0F SHOP INSPECTION I, the undersigned, holding a valid comission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood Massachusetts have inspected the pump, or valve, described in this Data Report on
"/ / / ' t , 19 y n and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code..foq pgclear Power Plant Components. By signing this certificate, neither the Inspector nor his employer makes any warrant, expressed or implied, concerning the equipment described in this Data Report. Further-more, neither the Inspector nor his employer sgli pgg g*1st@n6VIbr any g personal injury or property damage or a lod'sdr any Rind arf 41Mg from or connected with this inspection. T/ ' ' 19 Date Signed _ ] f.. ' r Commissions !.' A *; G / " (. t i / (Inspector) (Nat'l. Bd., State, Prov. and No.)
- Arkwright-Bostoa Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
( .~ e CROSBY VAI.VE 5 CACE CO:7A'.Y Wrentham, Massachusetts .h gg3
- 6. 3.3.1.4 VALVE TEST REPORT S.3 3.1. b Test Procedure No. T-16289 Rev, c2 S.3.3.2-
- 6. 3. 3. 3 Quality Assurance Instructien: M O dP O YN 1 Date:
9-/6-60 Test No.: /V/A Test Procedure No.:2"'-/62#9 T E V al Size and Style Valve: (, Ffn MA
- 15 #A/
Set' Pressure: //?T I / #7c Crosby Component Serial No.: Mla:LT 6 9-d C n n.23 Assembly No. : A/ $Pe75/o Y Crosby Factory Order No.: NM3A/3 Iten No. ~/ Drawing No.:M-C. Rev. L Customer's Mark or Tag No.: 1 DSV .300/ Customer's Order No.: 94, /ed, C.Usi. (b. I Sd ET / 1. Hydrostatic Test 566 E Nozzle Disc Insert _ Valve Body (Outlet) Pressure: / / Time: / / / Results: /1 //o
- //,
///// Test Gage No Gage Calibratieri Date: / / Water Test No.! Tested By: Date Date Date Reviewed and Accepted By: l Date Date Date l 2. Final Setting Tests (Steam) i l' l 2.1 valve Data 4MS-j%/4, Run Final Spring No. :/'437/8M-do3'I No. Ocen Close Blowdown l Ring Setting: N. R. : - 4 S" l // St' O //.'ft/ / / 9 /o 1 I G.R. t/SO 2 ~/s f'/ //39 in %) 9 Ambient Temperature: 7/P 3 // #"k- // f t < ~,.R MJ fg -2 {: 4 #/6 4 -l / Test Gage No.: Gage Calibration Date:7-/,.2-fh 5 l i; 2.2 Seat Leakage (Steam) g f Pressure: /d 6_<~ PS/d, Tested B dr @W $ -/1-/d 3/n a Time: l Results: ( Date C,M v4wGr-g.,,,.~. 9.l h, j,{ k r - (',y t l it-Test Gage No.: [d/[ - Og CONhN I $/N Gage Calibration Date: F-/#*M. r: .,s V Date 'l Final Ring Setting: N.'R. : -d Set By: h. y A,, S-/f80 G.R.: N52) ~ Date 8ECH m i 412 9-t((-to 1 I. ll ,,.,,. ~,, n, ._,_.,_.g_-
edL9mnzsa, masanwaa .a e VA!.VE TEST DATA kun11(y Assurance Instruction: 3 2060 Date: 3 /2 5/96 Test Number: W /A Test Procedure Number: ~T-/6L/f2 Sev.o Size and Style Valve: (f)O MA 25~FAI Set Pressure: J/R5'p.s./.p, Crcsby Component Serial Number: M62567-OO -CO2'2. Assembly Number: A)62567 Cresby Factory Order Number: N69555 Item: [6,1 Drawing Number: MS-O 62.f67 Rey,'_D Customer Mark or Tag Number:
- 1. MS\\.>- 3 o ol Custo.er order Nu.ber: PA/- 4 6 1.
High Flow Test Facility (H.F.T.F.) 1.1 Operational Test Run Open Accum Reseat Back-Blow-1.i f t
Temperatures ---
No. psia psig psia Pressure down % inches Spring Body Ambient Spring No.: Mx 3'578 1 sit o s22 7 8838 ftf +4. te t. oG
- 15 zei 90 Final Ring Setting:
2
- # 8(*
s z.f z
- 8J4 s##
45 f.o9 is t zog 9 '? N.R.: -l30 3 ss 41 8234 8'3f IJi 42. LtO fe$ 207 T7 l C.R.: L / L. Instrument Calibration Date: 3 -2f-8(.e .s I,,'c f9 f Tested By: cc j// Reviewed /Accep ed By: ~ I 1.2 Seat 14akage Test lb bb 3fE( Ft Seat Leak Pressures e OG 7 P SIk Tested By: Test Time: Results: u A/ S AT e S fAUD2 v' Reviewed / Accepted By: (.v///w ( vm 2. Production Test Facility (500 Ft.8) 3 S 2.1 Set Pressure Verification Test Test Cage Serial Number: 7%LT Run Open i .r Cage Calibration Date: J/)7/f4 No. psiaC 1 .H3l 2 1)fA 3 A)/A 2.2 Seat Leakage Test // . feJ7 #/, Seat laak Pressure / Cl, 7 Tested By: Test Times 3 AltA/u E4 / '_ad'M'k Results: SA 7t S #AC.7D/2 y' Reviewed / Accepted By: 2 +# Test Gage Serial Neber: J '7d'f Cage Calibration Dates . 9/) 7//4 Ring Setting (As Shi d): N.R.: "I30 G.K.s L V l-m g.f//W Set By: a a ( fxtrt+1Gid/AfC RAftEn.) { apt *tto#L 's.6.1' d' 4~9-fb t
e.1. /. A f d CROSBY V A LV E O GAGE COMPANY
- CROSBY, WRENTHAM, MASS
= FORM NV-1 FOR SAFETY AND SAFETY RE1.IEF V/1VES Q.C.-44D As Required by the Provisions of the ASME Code Pules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. 43 Kendrick St.. Wrentham. HA 02093 Name and Addreas Model No.
HA-75-FN ' order No. N64343 Contract Date 3/5/79 National Board No. Georgia Power Corp., P.O. Box 4545
- 2. Punufactured For Atlanta, Georgia 30302 Order No.
PAV-466 Nar-e and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3002 Serial NoN62569-00-0005 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Size R
p g,, S g,, -- ing,e 6 outlet 10 5atety, Safety Relief Pilot, Inch Inch inch inch Power Actuated
- 6. Set Pressure (psig) 1200 576 F
Rated Temperature Stamped Capacity sag 3
- overpressure --
Blowdown (psia) Hydrostatic Test (psig) Inlet 1845 Outlet N/A (Arnlicable to Valves for Closed Sy. stems Only) Pressure Retaining Pieces Serial No. Material Soeelfication Identification Including Type or Grade
- a. Kaur$oss Forgings Body N92894-31-0016 ASME SA105 4Q sonnet N92953-33-0037 ASME SA105
- b. Bar Stock & Forgings i
ASTM A193-76 Gr. B6 Ig @ g g pter N90087-39-0142 ASME SA193 Gr. B6 Norale N92896-32-0023 ASME SA182 Type F316 Insert N92898-34-0100 ASME SA637 Gr,,7 M ' Dise N92950-32-0023 s . e-Spring WashersK62821-25-0004 N92951-32-0004 ASMF/SAIO5 Adjusting BoltK63649-25-0003 N93583-25-0003 ASME'SA193 Gr. B6 Spindle K63648 0048 N88895-64-0363 ASME SA193 Gr. B6
- c. Spring K62821-25-0004
_N_X,3 378-31-0007 ASTM A689-74
- d. Bolting
- e. Other Pieces B onn e t _St ud. __ ____,
N91614 ASME SA193 Gr. B7 ~~ Bonnet Nut N88481 ASME SA194 Gr. 2H
a o P. 2./. A CERTIFICATE OF COMPLIANCE R We certify that the statements made in this report are correct and that this valve conforma to the rules of construction of the ASME Code for Nuclear Power Plant Components. Section III, Div. 1, 1974 Edition, Addenda Winter 1975 Code Case No. 2 (Date) Class Date 4 /f/g"o Signed Crosby Valve & Gage Co. by _n-(N Certificate Holder) Qk Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Desii;n information on file at crnehy vnico x cnoo e ny Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 Stress report certified by ~~~ ~~~ PE State Reg. No. 1Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on
'/// /, 19 :s O and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components. By signing this certificate, neither the Inspector nor his emplo kN'anywarrant, r \\ ejiort. Further-expressed or implied, concerring the equipment described i R a more, neither the Inspector nor his emnloyer shall b pWahir'for any personal injury or property damage or a loss Q-rom or connected with this inspection. c -Q 6 cot q Date .i 19 . \\. 0 Signed t- / ' Commissions -I45( / 1 ( (, ,s (Inspector) (Nat'l. Bd., State, Prov, and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
AEGREl 4f2 i
o, a v a f. CROSBY VALVE 5 CACE C0:9/J't l f Wrantham, Massachasetts f( i[6 s.a.s.I.a VALVE TEST REPORT 0.3.3. I. b l S. B. S. X. TestProcedureNo.T-16289Rev.d
- 6. 3. ~6 3
~ 9-/*[-Td 1 Quality Assurance Instruction: 32O6C 6'U. 2 Date: Test No.: N/A. Test Procedure No. :-7'- //,Op9 T E U JL Size and Style Valve: (a 7f/c
- 78 #A/
Set Pressure:/.Wo f /%' N(a)S69-co - OOad" Assembly No.:M [,3 5'b 9 Crosby Co=ponent Serial No. : Crosby Factory Order No.: M (ed/J/;3 Item No. 2 Drawing No.:P.5-d-/,As-69 Rev.1 Customer's Mark or Tag No.: I "PSV-3002 Customer's Order No. : ' pat / -gh ca s4. W.
- 5 1.
Hydrostatic Test 4%E.SN~/27 / fi {- Nozzle Dise Insert Valve Body (OuticO Pressure: i Time: / d Results: / / / Test Gage No.: / / /J _ I! // l! Cage Calibration (;Hfe:/ # / V / // / / F t. WaterTestNo./ / /l / //' / 'l / / l l' Tested By: / l3 Date Date Date d Reviewed and Accepted By: Date Date Date 2. Final Setting Tests (Steam) l 2.1 valve Data / SS-2$/.6 Run I'l Final Spring No. :/F t/ dg d/[-3/-Cod 2io. Open Close Blowdown. Ring Setting: N. R'. : ' e 3 f 1 //9 (~ //V/ f'/ '/8 ll C.R.: -l /,f 6 2 //9) //4 e f7 Yi f Ambient Temperature: _ d I' *A 3 // 77 /////) O t./.> -2 Test Cage No. : 9@/(, 4 Cage Calibration Date: f-/_J.Td 5 2.2 Seat Leakage (Steam) ,gn Pressure: / 4 ) $ 8 9. / t$, Tested By-O y'g // l Time: ,Q h IAI. q D) p p Results: Q Trs& c74rY~ Reviewed a Test Cage No.: [d/d 8Eg Accep Gage Calibration Date: f-Az-/D N.R.:- v. b4h y' ' gy' - Date ._M ks -ga rinal una Setting: M t Date I G.R. :-f /S0 ..g C [ 1. BECN M 4f2 e 9 Is-ru s .,__._-l _._._m_
WRENTHAM, MASSACHUSETTS VALVE TEST DATA Qua51ty Assurance Instruction: 32o60 Date: 3/2p/pg Test Number: At /A Test Procedure Number: T-/6 W 2 REV, O Size and Style Valve: s R fo-#A-75 FAl S.t pressure: /200 pst#. Crosby Component Serial Number:N6256T-00-oooS' Assembly Number: A)6 25'69 Crosby Factory Order Number: A/fhS3 5' Iten:M Drawing Number: DS-C-62569 Rev.] Customer Mark or Tag Number: / PS\\/-3 OO2. Customer Order Number: 9,W - g(,(, 1. High Flow Test Facility (B.F.T.F.) 1.1 Operational Test Run Open Accus Resest Back-Blow-Lift
Temperatures ---
No. psia psia psia Pressure down % inches Sprina Body Ashtent Spring No.: Af X J378 1 820 0 81d 8' N (93
- 3. 7 f.o?
D $2d El Final Ring Setting: 2
- 2c 1.
1252 si f4 (O 18 p, o I 91 2.47 g g" N.R.: -10 0 3 049A s VIN li bT I4b 38 f. 0 2-9d ZZ4 S Y' C.R.: -90 Instrument Calibration Date: 3-2h-8b l 3 29,84 - j Tested By: _w Reviewed /Accepte I f )\\>tI % 1.2 Seat 14akane Test ._1 b 3kh Seat Leak Pressure: /OSO F5/6 Tested sy: ff esul o AISAnsp:AcJDAW Reviewed / Accepted By: /f f. A4 U s' 3l N l 2. Production Test Facility (500 Ft.8) , r#, $ 2.1 Set Pressure Verification Test _ Test Cage Serial Number: 2M7 Run - Open Gage Calibration Date: .3/31//6 No. psia 1 s 26 C, 2 afA 3 AffA l 2.2 Seat Leakane Test Seat Leak Pressure /080 #5/4-Tested By: h wert> J,S/ Test Tine 3 /4rsfu rfS ' / I Results: JA r/S#Ar Td/2 V Reviewed / Accepted By: e /4M/ 7"//-JP[ Test Cage Serial Number: J L2d Gage Calibration Date: 3/J//J7e Ring Setting (As ipped) N.R.: -/OO .R.: -FO
- Elil' Set By:
r enaeame-,w,w 4 wux
- n. n. 76
>{-2-tto
eO. $. 5 f I CROSBY V A LV E O GAGE CO M P A N Y
- CROSBY, WRENTHAW, MASS J
FORM NV-1 FOR SAFETY AND SAFETY REl.!EF Vt1VES Q.C.-44D As Required by the Provisions of the ASMF Code Rules DATA RFPORT Safety.ind Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. 43 Kendrick St.. Wrentha m MA 02093 Name and Address Model No.
HA-75-FN order No. N64343 Contract Date 3/5/79 National Board No. Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Arinnen. r'om e n intn?
Order No. D Ay_ u r, 'Name ahd Address
- 3. Owner Alvin W. Voetle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. valve Identification (1-PSV-300)
Serial No.N62569-00-0029 Drawing No. DS-C-62569 Rev. B R 6 10 Type Orifice Size Pipe Site In.et Outlet Safety. Safety Relief, Pilot. Inch Inch inch ire Power Actuated 1210 576
- 6. Set Pressure (psig)
F Rated Temperature 911779 lbs/hr sat, 3 *0verpressure -- Blowdown (psig) 5% of S.P. Stamped Capacity Hydrostatic Test (psig) Inlet 1845 ouet,t N/A Pressure Retaining Pieces (Apn11 cable to Valves for Closed Systems Only) Serial No. Material Specification Identification Including Type or Grade
- a. turusogs Forgings Body N92894-33-0030 ASE SA105 Bonnet N92953-33-0019 ASE SA105
- b. Bar Stock & Forgings Bearine Adapter ASTM A193-76 Cr. B6 impoedRadsc N90087-39-0147 ASME KA193 Cr. B6 Nozzle N92896-32-0037 ASE SA182 Type 7316 Dise Insert N92898-34-0118 ASME SA637 Gr. 718 N92930-329 001 Spring WashersR62821-32-0030 N92951-32-0021 ASME SA105 Adjusting BoltK63649-25-0020 N_9_3583-25-0020 ASME SA193 Gr. B6 Spindle K63648-03-0051 N88895-64-0359 ASME SA193'Cr. 56
- c. Sprina K62821-32-0030 NX3378-31-0038 ASTM A689-74
- d. Bolting
- e. Other Pieces Ennner Stud N91614 ASME SA193 Cr. B7 Bonnet Nut N88481 ASME SA194 Gr. 2H
_ e, w_ wqnr I
F.a.1..:L. CERTIFICATE OF COMPLIANCE We certify th'at the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components, Section III, Div. 1, 1974 Edition, Addenda Winter 1975 , Code Case No. 2 (Date) Class Date' M/ho Signed Crosby Valve & Gage Co. by s -w (N Certificate Holder) VW Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) i CERTIFICATION OF DESIGN Design information on file at renesu v,1uo t g 7 e c p.,,,.. Stress analysis report (Class 1 only) en file at l 1 Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 Stress report certified by 1 PE State Reg. No. ISi nature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factorv Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 // , 19 T t and state that to the best of my knowledge and belief, the N Certificate Holciet has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant
- n. ? ' l Components.
i g . n em
- i ".
By signing this certificate, neither Ah4r41d feh, tor' nor his empioyer makes any warrant, i expressed or implied, concerning the equipment described in this Data Report. Further-more,tielther the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Date ~/ 19 ' Signed I Y /*< Commissions ?.I 4 %9 / ' l. (Inspector) (Nat'1. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
dECHTEL 4ra
$.&. ). 1.,, CERTIFICATE CF CO!PLIANCE k'c certify that the staterwnts c.ade in tl.is repart are correct and that this valve confer:s to the rules of construction of the ASME Code for Nuclear Pcwcr Plant Components, Sectica III, Div. 1, 1974 Edition Addsnda,yinter 1975 code case No. 2 (Date) Class E///8'o Signed Crosby Va ec & Cage Co. by a Date (N Certiticate Holder) VW Our ASME Certificate of Authorization No. 1878 to use the NV synbol expires September 30, 1980 (Date) t CERTIFICATION OF DESIGN Design information on file at crn a y vm.,. s. cn g,, e 7 -.,,, I Stress analysis report (Class 1 only) en file at l Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 Stress report certified by ( PE State Reg. No. ISignature not required - list nane only. 8 CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid cor::.ission issued by the National Board of Boiler and Pressure Vessel Inspectors and the Etate or Province of Massachusetts and ceployed by Factorvltutual Systens* of Norwood. Massachuictts a 1 ave inspected the pu: p, or valve, described in this Data Report on ~/ // *, 19 f C and state that to the best of my knowledge and belief, the N Certificate Holcfet has censtructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components. 1 By signing this certificate, neither the Inspector nor his empl6yer.,makhslany warrant, 3 expressed or implied, concerning the equipment described Api tMs 8ata Report. Further-nore, neither the Inspector nor his employer.shallde' liable in any manner for any personal injury or property damage or a Ioss of any kind arising from or connected with this inspection. Date ~/' 19 ' t Signed 5 !'N /*< t. Commissions Af 4 SS / ' (.. l (Inspector) (Nat 'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
YQ 4r2 l@e t., -e v
a-vs .e [Ng g,3,3 CROSBY VAL'.'E & CA0E CC"PANY Wrentham, Massachusetts qu's
- 5. S. 3. l.a VALVE TEST REPORT S. 5. 3.1. b
~ 5 3 3.2 Test Procedure No. T-16289 Rev. 5 3. 3. 6 f Quality Assurance Instruction: NG UO Date: 9-/f-EN Test No.: N/A Test Procedure No. @ /(pR f 9 Raty.."L Size and Style Valve: '6 1/O M M 6/Al Sc't Pressure: [/o S/ % Crosby Component Serial No. : N(aJtS69 -co -002 9 Assembly No. :A//s,3,5/,9 Crosby Factory Order No.: A] (al/34/3' Item No. 3 Drawing No. :DS-C-(sasM Rev. 8 Customer's Mark or Tag No.: 1 - W - 3003 Customer'.s Order No.:_ p/W //(,(, C.Ost. L M $ 1. Hydrostatic Test g j-pgg 7- / Nozzle Dise Insert Valve Body (Outlet) I Pressure: -7 Time: / / / Results: 1? / /, // // ) Test Cage No.: Cage Calibration Datc:/ / / / /,' //' / l Water Test No.: / / / 2 /
- t Tested By:
Date Date Date Reviewed and h, Date Date Date 2. Final Setting Tests (Steam) f 2.1 Valve Data Run j05op f$ o')
- f I
Final Spring No.: /i/if U~/9 No. Open Close Blowdown , j Ring Setting: N.R.: .i f 1 /2 o1 f/_r v
- v. s-e G.R.: +tcc 2
o o e, y i t $2 ./ y 1 ! Ambient Temperature: 7 J-3 , 7 o f, // c f << s -2,I Test Cage No. : Vc//, 4 MA _ Gage Calibration Date: t/a/to 5 v/4 N 2.2 Seat Leakage (Steam) q* Tine: Tasted'By:) /hfrt,ya$,73/fo Pressure: / o f C / r.'S Results: 3AF . " ' J '& :. ~. ' (/Date ' - ' >'Keviewed and h Tes: Gage No. : Yo/6 Accepted By: ( _42 9'/8 8 Gage Calibration Date: t/s.r/f U Date Final Ring Setting: N.R.: - 3f Set By: h. d u-9-/f'80 G.R.: + / -77) g' Date I RECHTu t 412 T IV-t o i T .m.. .. c j
WRENTNAM, MASSACHUSETTS VALVE TEST DATA Qu&lity ' Assurance Instruction: 22.06O Date: 3/2')/P6 l Test Number: Af/A Test Procedure Numbe.r: %/6'f')2. Rev.O Size and Style Valve: 6 R/O NA -95 FA) Set Pressure: /.2 / O p.s./.p. Crosby Component Serial Number: A/62567-OO-CO2Cf Assembly Number: A162569 Crosby Factory Order Number: A/P)S33' Item:M Drawing Number: OS-C-(2569 Rev.3 Customer Mark or Tag Number: I f6\\/- 2C03 Customer Order Number: P4 t/- 4//e(p 1. High Flow Test Facility (H.F.T.F.) 1.1 Operational Test Run Open Accum Reseat Back-Blow-Lift
Temperatures ---
No, psis psia psia Pressure down % inches Sprina Body Ambient Spring No.: Al X 3378 1 21 O l2g1 f/(, f f 94 3.7 s.07 to? M 2if '19 Tinal Ring Setting: 2 e 2. s 2.
- 2/./ 7
///,3 s9i 3,i s.01 f(( gezgo go N.R.: -f3D 3 s 2.l ? 8 24T /t (r 0 ti G 44. ( s.O G to '/ pard /O 79 C.R.: - (O %g Instrument Calibration Date: 3'27"[b Tested By: ~'T f 17 Reviewed /Accepte By: h 8 m9 alaw,' 1.2 Seat Leakate Test d 3/2ik Seat Leak Pressure: /ofi Pst C Tested By: Re 1 (.>af S/1 T75f/k/04/ Reviewed /Accepte By JN/hd p.ii 2. Production Test facility (500 Ft.8) , ga ! ,r 2.1 Set Pressure Verification Test
- I' Test Cage Serial Number:
J/J2f Run f'i Open Gage Calibration Date: J /J7/82, No. psia 1
- 204/
2 M lh 3 n/A 2.2 Seat Leakage Test Seat Leak Pressures /09i Tested By: 1.0 M[ Test Times I He A/Off $ / Results: 54 775 #AC7C/2 V Reviewed / Accepted By 7.3 M O Test Gage Serial Numbers c7 76L7 Gage Calibration Date J/A7/RL Ring Setting (As ipped N.R.: -s30 .R. -fC Set By: , 44 C h,YY,I6 / g m m >. E Tiz u b. t-! -!G c,araezinc. wasw
- 7. a?. l. L d
CROSBY V A LV E O GAGE COOPANY CROSBY WRENTHAM, MASS T i FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/IVES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & C. ige Companv. 43 Kendrick St.
Wrentham. MA 02093 Name and Address Model No. HA-75-FN order No. N64343 Contract Date 3/5/79 National Board No. Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Atlanta Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. I.ocation of Plant Burke County, Georgia
- 5. Valve Ideatification 1-PSV-3004 Serial No,N62569-00-0013 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Size R
6 10 p gp, s gg, -- ing,g Outlet Safety, Safety Relief. Pilot. Inch Inch Inch Inch Power Actuated 1220 576
- 6. Set Pressure (psig)
F Rated Temperature Stamped Capacitym2M hs/h sag 3 M f S.P. y,oy,,,,,,,,,, Blowdown (psig) Hydrostatic Test (psig) Inlet 1845 Outlet N/A (Applicable to Valves for Closed Systems Only) Pressure Retaining Pieces Serial No. Material Specification Identificatton Including Type or Grade k
- a. rancega Forgings Body N92894-31-0013 ASME SA105 2
Bonnet N92953-33-0029 ASME SA105
- b. Bar Stock & Forgings ASTM A193-76 Gr. B6 g g g 4pter N90087-42-0193 ASME SA193 Gr. B6 Nozzle N92896-32-00ll ASME SA182 Type F316 insert N92898-33-0096 ASME SA637 Gr. 711P Disc N92950-32-0035 Soring WashersK62821-25-0016 N92951-32-0013 ASME SA105 Adjusting BoltK63649-25-0005_N_9,3583-25-0005 ASME SA193 Gr. B6 Spindle K63648-03-0053 N88895-64-0362 ASME SA193' Gr. B6
- c. Spring K62821-25-0016 NX3378-31-0023 ASTM A689-74
- d. Bolting
- e. Other Pieces Bonnet Stud bl614 ASME SA193 Gr. B7 Bonnet Nut N88481 ASME SA194 Gr. 2H 4
i NO/I/
P.D.1. 2. CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components, Section III, Div. 1, 1974 Edition, Addenda Winter 1975 , Code Case No. 2 (Date) Class Date W/SMd Signed Crosby Valve & Cage Co. by hen _ (N Certificate Holder) Q{ Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN l Design information on file at crnehy. w1vo t cm,,o tw.s.,,, Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 ~~~ Stress report certified by PE State Reg. No. 1Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid comission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 // 7, 19 '# r.
and state that to the best of my knowledge and belief, the N Certificate Holdsr has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components. I By signing this certificate, neither the Inspector nor his employer makes any warrant, expressed or implied, concerning the equipment described in this Data Reporto. Further-i more, neither the Inspector nor his employer shall be liable in any,sdrinW for any 1 personal injury or property damage or a loss of any kind arising'from or connected with this inspection. ~ 1 Date 7 [? 19 '" P Signed \\ b ( t. h ' C.l. l:' l' l l i Commissions } d d S 7 / 2 (, b './ (Inspector) (Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
6 P.D. I. L CERTIFICATE OF C0!!PLIANCE k'e certify that the statencnts made in this report are correct and that this valve conforms to the rules of construction of the AS!!E Code for Nuclear Power Plant Cce;onents, Section 1974 Edition, Addenda b' inter 1975 2 (Date) ~, code case No. III, Div. 1, Class Date g/SMd Signed Crosby Valve & Cage Co. by k'b m % ~ (N Certificate Holder) Q Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires Septenber 30, 1980 (Date) CERTIFICATION OF DESIGN I Design information on file at crn=hy valu,, t c,3,, en p.q, Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 Stress report certified by PE State ~~~ Reg. No._ ISignature not required - list nar.c only. CERT!FICATE OF SliOP II:SPFCTION I, the undersigned, holding a valid co ::is:,lon issued by the National Board of Boiler and Pressure V,essel Inspectors and the State or Province of Itas s achuse t,t_s and erployed by Factory !!utual Systems
- of
':o rvood. '!a s ' ofuir e t t s have inspected the pump, or valve, described in this Data Report on, ~/ /f 7, 19 '# r. and state that to the best of my knouledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the AS!!E Code for !;uclear Power Plant Cocpenents. By signing this certificate, neither the Inspector nor his employer makes
- varrant, expressed 'or implied, concerning the equipment described [n s.h
%Nr. Further-more, neither the Inspector nor his employ,er shpHf9fBM614,in{ s m:rnfW, " or any g personal injury or property damage or a ' loss ofany kind fa'r.isip3if fiidfobc(unnected n this inspection. e..C.; 5 ' '"" Date '7 [/ 7 19 I' ~ e \\ b ( <. a s ( f f I l :' I' 4 ( Commissions } ld S $ 1.2 6 6 Signed r '/ (Inspector) (Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
w k i
CROSBY VALVE 5 GACE CC: TAW S 6.3.J6 Wrsntham }!assachusetts W'
- 5. 3. 3. l.a S. 3. 3.1. b VA1.VE TEST REPORT g,3,3,A, TestProcedureNo.T-16289Rev.h O'
Quality Arsura ce Instruction: 3800'O Nd Date: 7 - /f-N Test No.: Id Test Procedure No. : - 7"~ - /l c2 f 9
- El/. J >
Size and Style Valve: (o K Jc3 uA 75 #A/ Set Pressure:Wc I / t/c Crosby Component Serial No. : A} {a25(d' -co m /3 Assembly No. :A/(pJtS(o9 9 Crosby Factory Order No. : Af (pl/31/3 Item No. 4' Drawing No.:D$-C-(,2SG9 Rev. 6 Customer's Mark or Tag No'. : / PS\\/- 3o09 ' Customer's Order No. : P/7 9 -M(,4, C,USI. d. # 43 1. Hydrostatic Test m p,y f Nozzle Dise Insert _ Valve Body (Outlet) Pressure: ) Time: / Results: / / Test Gage No : , /~) / /I/ Cage Calib tion pat $: J-- /V / iff /A////) Water Test No.: / / / // ' f ///e/- ( V j~ V Tested By: Date Date Date Reviewed and Accepted By: Date Date Date 2. Final Setting Tests (Steam) 2.1 Valve Data i Run fa.) fa s,'9 '7, g Final Spring No. : A/}'37'/T/ No. Open Close Blowdown l, Ring Setting: N.R.: -s r 1 /2 32 //7 7 -/ r [ l G.R.: + /rc 2 r a j a. f r yg
- 4. 5-Ambient Temperature:
7 7 *c 3 Ia il // 74 v s- -2 l ! Test Gage No.: Vd//. 4 g/J - 7 i Gage Calibration Date: 9//J/t, 5 A//s - 2.2 Seat Leakage (Steam) Time: 7 & J.,' ' Tested By: rt/htdr fJ!fo Pressure: //o f r,/, g / Date Results: 54T Reviewed and,, i f Test Gage No.: h/4 Qcepted 8 h 3 l Gage Calibration Date: 9//J/fo .-
- D \\ -
y Ur.? " Date I, . * ! het 1 y ar,.Am 9 '/6'-26 Final Ring Setting: N.R.: - 88 G.R.: +1So C/ ~ ~~ Date
- 1 JEQirgg 7 41a 17-70
.... =. - -.
^^ GJLAAubrimunuas,s s a ~ VALVE TEST DATA ' Quality.Aasurance Instruction: 32o60 Date: Y22/96 Test Number: Al[/4 Test Procedure Number: '7~-/6 'f92 MeV,0 Size and Style Valve: 6 M / O # 4 - 9 5 '- F M Set Pressure: /2 l?C p.s.s'.p. Crosby Component Serial Number: A/62569 00 /3 Assembly Number: N6 2,5fy Crosby Factory Order Number: NO555' Ites:M Drawing Number: hS-C-62569 Rev.) Customer Mark or Tag Number: 1 ASl/-3 COY Customer Order Number: 9 M - 4 G (o 1. Eigh Flow Test Facility (H.F.T.F.) 1.1 Operational Test Run Open Accum Reseat Back-Slow-Lift
Tesrperatures ---
No. pais psig psia Pressure down % inches Spring Body Ambient Spring No.: MA3378 1 i t z z.
- 2. c 7 f i c,, o 2o2.
e,f 9 i, o f er s9r (, c, Final Ring Setting: 2 s t 2.( #4f*/
- 11'4 Zoo
(..( /, o./ 90 (f( f9 M.R.: -83 0 3 8 BAN ' AiI '#57 ZB f i.L-r.O I 84 Lf 78 4 fC, C.R.: - IO Instrument Calibration Date: 3 8b m "I /., 7 ft" Tested By: Reviewed /Acce ed By:_ bh II17./s'. 1.2 Seat 14akate Test 'J/22]8t$ Seat Leak Pressure: /ChN 83/4 Tested By: Test Time: 3 N /Mu TTS V Results: SA DSfETDAM Reviewed / Accepted M JI?7/m -V-a 2. Production Test Facility (500 Ft.8) NW APPLICAdLE 2.1 Set Pressure Verification Test Test Cage Serial Number: Run Open Cage Calibration Date: No. psig 1 Ti 3 2.2 Seat Leakate Test Seat Laak Pressures Tested By: Test Time ~ Results: Reviewed / Accepted By: Test Cage Serial Nusbert Cage Calibration Date: f Ring Setting (As Shipped): N.R.: - /J D C.R.: -5o Set By:
- 1. b.4ft 3/g f u-y,.gy GMf,tA/EKk/N4 ftsvim1s> ${ sVtaav4t.
s E. / git $bo 4 1 - f t,o
- 9..?. l..t I
CR0 sty V A LV E O GAGE COOPANY CROSBY p WRENTHAM, MAS $ l / FORM NV-1 FOR SAFETY AND SAFETY REl.IEF V/IVES Q.C.-440 As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. 43 Kendrick St.. Wrencham. MA 02093 Name and Address Model No.
HA-75-FN Order No. N64343 Contreet Date 3/5/79 National Board No. Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Atlanta, Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant l
Name and Address
- 4. l.ocation of Plant Burke County, Georgia
- 5. Velve Ider.tific:tica l-PSV-3005 Sesial NoN62569-00-0017 Drawing No. DS-C-62569 Rev. B Type Safety R
6 10 Orifice Size Pipe size -- Inlet outlet Safety. Safety Relief, Pilot. Inch Inch Inch Inch Fower Actuated
- 6. Set Pressure (psig) 1235 576 F
Rated Temperature Stamped Capacity s N sa g 3 ,gy,,,,,,,,,, M S.P. Blowdown (psig) Hydrostatic Test (psig) Inlet 1853 outlet N/A (Applicable to Valves for Closed Systems Only) Pressure Retaining Pieces Serial No. Material Specification Identification Including Type or Grade
- a. Xiost1ose Forgings Body N92894-31-0012 ASME SA105 44 N92953-33-0038 ASME SA105 Bonnet j
- b. Bar Stock & Forgings M M i g pter N90087-52-0348 ASME SA193 Cr.- I6 Nogale N92896-32-0009 ASME SA182 Type F316 Insert N92898-34-0106 ASME SA637 Cr. 718 Dise N92950-32-0005 Spring WashersK62821-25-0007 N92951-32-0006 ASME SA105 Adjusting BoltK63649-25-0035 N_93583-25-0035 ASME SA193 Cr. B6 ASTM A193-13 Gr. 56 Spindle K63648-31-0010 N88895-42-0171 ASME SA193 Gr. B6
- c. Spring K62821-25-0007 NX3378-31-0028 ASTM A689-74
- d. Bolting
- e. Other Pieces Bonnet Stud 91614 ASME SA193 Gr. B7 Bonnet Nut N88481 ASME SA194 Gr. 2H pgont
o
- 8. a. J. p.
CERTIFICATE OF COMPLIANCE l We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components Section III, Div. 1, 1974 Edition, Addenda Winter 1975 , Code Case No. 2 (Date) Date v//S/fo Signed Crosby valve & cage Co. by (N Certificate Holder) VV Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Design information on file at crnehy vniv, x. rng,rw n.nu Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 ~~~ Stress report certified by ~~~ PE State Reg. No. 1Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commisdiiih' 15stled 'by' the National Boar'd '6f Boiler and ~ Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 / / 7, 19 e t*
and state that to the best of my knowledge and belief, the N Certificate Hold 6r has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components. By signing this certificate, neither the Inspector nor his employer' elds 'n = st any yarrant, expressed or implied, concerning the equipment described In this Data. Report. Further - more, neither the Inspector nor his employer shall be liable is ang @ntk F fo Eany J personal injury or property damage or a loss of any..k,1r4JmisfrYg"'from or connected with j this inspection. Date 7 7 19' Signed Ii. / / /. Comnissions d } 05 5 / ll. ( (Inspector) (Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
wum 412
i d' ~ t vh Sj
- 5. 3. S CRO5BY VALVE & C/.0E COMP /J.T
- /g.\\ Wrentham, Massachusetts / 5 3.5.1.cl ~ VALVE TEST REPORT 4 S. 3.3. L b S.3 3.;L Test Procedure No. T-16289 Rev, cd 6.3.3.3 Quality Assurance Instruction: 3d Clc0 hA 4 -d'N Date: Test Procedure No. r-/~~- /6";LF9
- El/E Test No.:
- 9.5" FA/
Se( Pressure: ;35 r /Q Size and Style Valve: (a 'K /c Crosby Component Serial No. : 1]/M69 00 //J Assembly No.: A[/,2S/o f ] ~ Crosby Factory Order No.: 4 /d/3/3 Item No. S Drawing No. :DS-C-(s.lLartriiP Rev.fi 1 3cos-Customer's Order No.: ' pat / - 4/G t., { Customer's. Mark or Tag No. : J h\\/ Ct)sh. *k. & 'l ~ l 1. Hydrostatic Test _ grfg pga ;,- / Nozzle Dise Insert Valve Body (Outlet) Pressure: i / Time: // / / Results: /A // a _ A' / / s/// Test Cage No : f Cage Calibrati6n Date: / / Water Test No.: Tested By: l Date Date Date Reviewed and [ Accepted By: i t Date Date Date r i j 2. Final Setting Tests (Stea.:-) l l 2.1 Valve Data /83-FMd - l <-Run j Final Spring No.:Mg3)8.8/~## No. Open Close Blowdown ij // F 2 W .3/kb Riog Setting: N.R.: c./3r L [ Time: . ~. ate Results: ~ S Jn /A/, / 4/ /6 jpg El Reviewed and y' 'J/El j! 4 / Test Gage No.: 6 Accepted By:., j Gage Calibration Date: 9./.;2 f3 Q' Nl,,.7 Date Final Ring Setting: N. R. : - 4. i Set By: b _ u N[Yb j G.R. : -4/ 2 > 1 ][!Date
- l l
BECHIEL l' 412 i-n.F0 I( l s
WRENTHAM, MASSACHUSETTS VALVE TEST DAT_A 3/2g/p6 Quality' Assurance Instruction: 32060 Date: Tcet Number: M /A Test Procedure Number: T-/f W2, Rey, O Size and Style Valve: 6R /O # A 95 FA) Set Pressure: /23F p.I/.y. Crosby Component Serial Number: N62f67-CD-CO/ 7 Assembly Number: N62569 Crosby Factory order Number: /\\)695$~f Itea: /6Y Drawing Number: DS-062567 Rev.} Customer Mark or Tag Number: / N -300.5' Customer order Number: pat / - #6,6 ~ 1. High Flow Test Facility (H.F.T.F.) 1.1 Operational Test Run Open Accus Resent Back-Blow-Lift
Temperatures ---
No. psia psia psia Pressure down % inches Spring Body Ambient Spring No.:A x33 '79 1
- 23 E
- 27.I erf 7 M3
- 3. l
,oG tus" zo c. rt Final Ring Setting: 2 122 6 t&74 / r f d/ zot 4.( s.00 /07 g ic.) PL N.R.: - /O O 3 t22'l 82/s & fr 8 s' l t99 '4. 0 l r.o rf 10 & 2tM gI C.R.: - (O Instrument Calibration Date: 3 ~ N-8b l 3 dt Tested By: Reviewed /Accep ed By 7I 1.2 Seat IAakane Test Seat Leak Pressure: /// b Tested By: 38 8/ Test Time: '3 N /AfuT$ $ r Results: S W75#/ETDS Y Reviewed / Accepted By: /h h [@f 2. Production Test Facility (500 Ft.s) f/0T Y k iO & Y 2.1 Set Pressure verification Test 7 Test Cage Serial lhamber: Run Open Gage Calibration Date: No. psia 1 1 2 3 2.2 Seat Leakane Test Seat IAsk Pressure: Tested By: Test Times Results: Reviewed / Accepted By: Test Gage Serial Ihamber: Cage Calibration Date Ring Setting (As Shipped): N.R.: =/06 C.R.: ~S6 Set By: b e / taler f y- '5 A Enstar4 RING W o w g y tna m : 'ty,f. fhDC& Q.g.gg
8.9.l.o1 1 i CROSSY V A LV E O GAGE COCPANY CROSBY r WRENTHAM, MASS j FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/1VES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & cage Company. 43 Kendrick St.
Wrenchme. MA 02093 Name and Address HA-75-ni order No. N64343 Contract Date 3/5/79 ~~ Model No. National Board No. Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Atlanta. Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address 4 Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-30ll Serial NoN62569-00-0002 Drawing No. DS-C-62569 Rev. B Type Safety R
6 10 Orifice Site p gp, 3 g,, -- Inlet Outlet Safety. Safety Relief, Pilot. Inch Inch Inch inch Power Actuated 1185 576
- 6. Set Pressure (psig)
F Rated Temperature Stamped Capacity 93160 ns/ h sag 3
- 7. overpressure ~~ Blowdown (psis)
N Hydrostatic Test (psig) Inlet 1845 outlet N/A (Annlicable to Valves for Closed Systems Only) Pressure Retaining Pieces Serial No. Material Specification Identification Including Type or Grade Mg Body N92894-31-0009 ASE SA105 Bonnet N92953-33-0033 ASE SA105
- b.. Bar Stock & Forgings ASTM. A193-76.Gra. B6 jg g @ Pter N90087-42-0194 ASMF SA193 Cr. B6 '
Nozzle N92896-32-0005 ASE SA182 Type F316 Dise Insert N92898-33-0060 ASE SA637 Cr. 718 N92950-32-0034 Spring WashersK62821-25-0012 N92951-32-0008 ASE SA105 Adjusting BoltK63649-25-0034 N93583-25-0034 ASE SA193 Cr. B6 Spindle K63648-03-0052 N88895-66-0373 ASE SA193 Cr. B6
- c. Spring K62821-25-0012 NX3378-31-00ll ASTM A689-74
- d. Bolting
- e. Other Pieces Y91614 Bonnet Stud ASE SA193 Cr. B7 Bonnet Nut N88481 ASE SA194 Cr. 2H J
l a
- 9. 9. I. 2.
CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components Section 1974 Edition Addenda Winter 1975 Code Case No. III, Div. 1, (Date) Class M//S/84 Signed Crosby Valve 6 Gage Co. by /T g7 - Date (N Certificate Holder) (' ~ Our ASME Certificate of Authorization No. 1878 to use the NV l symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN i Design information on file at Crosbv valve A cage enensny Stress analysis report (Class 1 only) on file at 1 Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 ~~~ Stress report certified by ~~~ PE State Reg. No. 1Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Shssachusetts have inspected the pump, or valve, described in this Data Report on
/ // /,19 _(O and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for 4%e'ar Power Plant Components. By signing this certificate, neither the, g c M M M hes' any warrant, expressed or implied, concerning the equipment desgri M is Data Report. Further-more, neither the Inspector nor his employer sh'all.be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection. Date '[ 7 19 ~* ' ' Signed b -[ [ > ' ' I I /- i-Commissions N o e <: 12 (, 6 i (Inspector) (Nat 'l. ~Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
JECHTEL i 412 F
es \\
- b. b. b U{ $
s CROSBY VALVE & CACE COSTNN Wrantham, Massachusetts g S.3.3, ),q
- 6. -3. S. I. b
'i VALVE TEST REPORT i 6.3..S.3.- Test Procedure No. T-16289 Rev. A 8*3*b D Quality Assurance Instruction: 3 mob"O 36 V.-2 Date: k-/6-f) Test No.: N/A Test Procedure No. : J"'" /&J P9 ggt /..,2. Size and Style Valve: (r 60
- 7_f EA/
~ Set Pressure: //ES f / '/c Crosby Component Scrial No. : Al&J 5(,'l- 00 -oOD.2 Assembly No. : //6c256 9 Crosby Factory Order No.:A/(f V JV3 Item No. / Drawing No.: D S -d -/ ?Jf.- 9 Rev. A i f Customer's Mark or Tag No. : / - P_5 V - 3 0 // Customer's order No. : 7 8 v - 4/(e& ~ Cust. R.#P. - 1. Hydrostatic Test m .Cf a z p- / Nozzle Dise Insert Valve Body (Otdlet) Pressure: / ~ / Time: /" / // _, / /. Results: / / 7 / /) / / // _, M // //) Test Cage N.: ~ 1 Cage Calibratio Date: / / / / // Water Test No. / / / Tested By: Date Date f Date Reviewed and Accepted By Date Date Date l 2. Final Setting Tests (Steam) i 1 2.1 Valve Data M# N/, f, { Run Final Spring No. :#)/h>[-3/-co // l No. Open Close Blowdo'in Ring Setting: N.R.: .3S' 1 //ff.'2. //3 2. _Co M,23 [ G.R.:__f/3*O 2 Ambient Temperature: 74 'A 3 'J/ 7 f // 3/ 40 2 'f. o 7 //>f // '3 0 44F 4/,o / -2l Test Cage No. : </0/g, 4 Gage Calibration Date: f-42-/3 5 2.2 Seat Leakage (Steam) -l! ht ht44/ $ -/f-/8 Pressure: M [d 2'S/ d, Test 6,///c/#c/dr-V$_ g 3 q C AQ%, s 8/p> /A', Time: / l '- [ Date Results: ( Reviewed and Test Gage No. : IS/d Accepted By: ( I' Cage Calibration Date: f-/4-JD U Date Final Ring Setting: N.R.. ".3 I SetBy:[ 9 -//- fd Date I G. R. : -/-(Tt) Y j BE0im 442 9-1710 ~
- ity Assurance Instructicn:
3 2M Date: 3/26/4>6 test Number:_ At /A Test Procedure Number: h/fl#2 (,0,0 Sise and Style Valve: 6 Rio HA 95FM Set Pressure: / / 85 p.s.f.y, ~ Crcsby Component Serial Number: A/62569-co-Ooo2. Assembly Number: M625N ~ Cresby Factory Order Number: /\\/69.53[f Item: /68f Drawing Number: Df-C-62Sf7 Rev.b Customer Mark or Tag Number: 1 DS\\/-30// Customer order Number: PAv-a/OU l. High Flow Test Facility (H.F.T.F.) I 1.1 Operational Test 1 Run Open Accus Reseat Back-' Blow-Lift
Temperatures ---
No. pois psia psia Pressure down % inches Sprina Body Ambient Spring No.: NK337I 1
- 93 st23 14 2.9 894 4."1 f.o1
- 2 1 ZZ(
g3 Final Ring Setting: 2 f( 8 7 s 2N ft2.C. f g (. i.o 1.01 e&Q 24 3 g4 N.R.: -330 3 Ig 4 J e520 f t 2.6 ff? f.0
- 1. o 4 e 2,f 22 (
gf C.R.: -69 Instrument Calibration Date: 3 8C -e ft.L,[fr Tested By: y-Reviewed / Accepted By: 6 fit 1.2 Seat 14akate Test 0h Seat IAak Pressure: [ O(# 7 PI[ Tested By: hj g M A e 1 vsdSAr/5/Ac7DsN Reviewed / Accept d By: c j 2. Production Test Facility (500 Ft.s) 2.1 Set Fressure Verification Test Test Cage Serial Neber J %7.T Run Open Gage Calibration Dates .1417/f6 No. psia 1 Ilf3 2 A/[t% 3 at fa .e et
- 2.2 Seat 1,eakane Tect g M C O.
.5 Seat.14ak Pressure 7OG7 #$/6 Test d JIp '/ Test Tine E H eatu T*f $ 'I Results: SA7/3 FAC.7DE Y' Reviewed / Accepted By: E 8'S Test Gage Serial Number: .fZ21 i F Cage Calibration Date: J/s77/f4 Ring Setting (As Shipped): N.R.: ~ 830 l . _.Ar . 4-hA% Set By: 2, ad,,a m,w m,~ ( w ae m : %. e. WeC i u-# -fts y prei e- / Mfff7V f7W
m
- 17. 2. J. s I
CROSSY V A LV E O GAGE COWPANY C Ff 0 S B Y j WRENTHAM, MASS FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/IVES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT { Safety and Safety Relief Valves
- 1. Manufactured By Crosbv Valve & Cage Comp.iny. 41 Kendrick St.
Wrentham. StA 02093 Name and Address Model No. HA-75-FN order No. N64343 ___ Cont rac t Date 3/5/ 79 National Board No. Georgia Power Cor P.O. Box 4545
- 2. Manufactured For Atlanta, Georgia $d$02
{ Order No. PAV-466 j Name and Addrens
- 3. Owner Altin W. Vogtle Nuclear Power Plant Name and Address
- 4. 1.ocation of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3012 serial NoN62569-00-0006 Drawing No. DS-C-62569 Rev. B Type _
Safety neigte, st=, R pgp, S;g, -- ;nig 6 Outlet 10 Safety, Safety Relief, Pilot. Inch Inch Inch inch Pever Actuated
- 6. Set Pressure (psig) 1200 576 F
Rated Temperature 904331 lbs/hr sag 3 Stamped Capacity M f S.P.
- r. overpressure -- Blowdown (psig)
Hydrostatic Test (psig) Inlet 1845 outlet N/A Pressure Retaining Pieces (Applicable to Valves for Closed Systemn Only) Serial No, Material Specification h[g Identification
- a. ruussesgu Forgings including Type or Crade 412 Body N92894-31-0010 ASME SA105 l
Bonnet N92953-32-0005 ASME SA105 i
- b. Bar Stock & Forgings BearinERanxAdapter ASTM A193-76 Gr. B6 summet N90087-42-0195 Asw sA193 cr. B6 Nozzle N92896-32-0018 ASME SA182 Type F316 Disc Insert N92898-34-0101 ASME SA637 Gr. 718 N92950-32-0033 Spring washersK62821-25-0005 N92951-32-0010 ASME SA105 Adjusting BoltK63649-25-0028_N93583-25-0028 ASME SA193 Gr. B6 9
Spindle K63648-01-0041 _N91761-31-0006 ASME SA193 Gr. B6
- c. Spring K62821-25-0005 E 3.'78-3__1-0008 ASTM A689-74
- d. Bolting
= - -
- e. Other Pieces Bonnet Stud N91614 ASME SA193 Gr. B7 Bonnet Nut N88481 ASME SA194 Gr. 2H front
- 7. J. /. $l.
CERTIFICATE OF COMPL1ANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Powar Plant Components, Section III, Div. 1, 1974-Edition, Addends Winter 1975 , Code Case No. 2 (Date) Class M//.S~/fd Signed Crosby Valve & Cage Co. by n7 _ Date (N Certificate Holder) V( Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Design information on file at crnehy va!v, s. c_, o o em,7,,,,, Stress analysis report (Class 1 only) on file at 1 Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 Stress report certified by ~~~ ~-- PE State Reg. No. 1Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusette have inspected the pump, or valve, described in this Data Report on
'/ // 7, 19 6 e and state that to the best of my knowledge and belief, the N Certificate Holdet has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components. By signing this certificate, neither the Inspector nor his employer makes any warrant, expressed or implied, concerning the equipment described in this Data Report. Further-more, neither the Inspector nor his employer shall be liable in any.' manner. for any personal injury or property damage or a loss of any kind arising frbm or connected with this inspection. ' 19 ' ' Date 'S a ' Signed ( Commissions ll1838 /2 b ( 'I < 11 fr /^ i-i< r / (Inspbetor) (Nat'l..Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
NHIEL 44
d t< c. e c,. CROSBY VAI.VE & CACE CO."FANY S.S. 3 @3;c,0 Wrsntham, !!assachusetts S. 3. 3.1, q VAI.VE TEST REPORT d.3,3,I,( 6.3.3.2 Test Procedure No. T-16289 Rev. 6 3.a 3 Quality Assurance Instruction: 3do60 foT. 2 Date: 9-/fd Test No.: N/A Test Procedure No. :--f*- /6 a P9 h.2 Size and Style Valve: ( g/o //g 75" FA/ Set Pressure:/Joo d' A g Crosby Component Serial No.:A/(,4tS(s9- 00 -000 to Assembly No. :A//agf 9 Crosby Factory Order No.:A1 (d/.34/J Item No. 42 Drawing No.:DS-d. (eJS69 Rev. B Customer's !! ark or Tag No. : / PSV -Jo/A Customer's Order No.: 94v. 4 /4 / COST. @. % 1. Hydrostatic Test $gg $ME7" ( Nozzle Disc Insert Valve Body (Outlet) 1 Pressure: / Time: / Results: / / + / /A Test Cage No.:
- L,
,9 Cage Calibrati6n D pe/ / / // // ^ { Water Test No.: / / ' /' l l / j Tested By: ~ 't Date Date Date ti Reviewed and Accepted By: d Date Date Date jh 2. Final Setting Tests (Steam) i h 2.1 Valve Data ,//3 S - J h / 4, Run I Final Spring No. : /1)bf$ d.?/-dboI No. Open Close Blowdown Ring Setting: N. R ' : ' - 38 1 //F'V //9#/_ M3 _%,fo2h ~ C.R.: f/SO 2 //V2 //Vs D 3,fMs Ambient Temperature,: '7g ep. 3 // y f f/ 4/g-t,/7 t/,og -2 ; l Test Gage No. : //0/(# 4 Cage Calibration Date: f-/ 2 -/D 5 1 2.2 Seat Leakage (Steam) Pressure: /dM [f/ d, Tested By /u {t[4xx// 9-/f'-/d l Time: . Qsn iA. f Date / Results: 6#M ;Mhev/ Tast Cage No.: s/4/h* r! e / Cage Calibration Date:9%3-/# 47g ' Date Final Ring Setting: N.R.: Yo SetBy:(d '_ZD 7-#N) G.R. : A /ob ( Date BECHTEL l 412 I '7-lW-D i ._,e
WRENTNAM, MASSACHUSETTS l [ VALVE TEST DATA Y2//6 Wality ' Assurance Instruction: 3 206O Date: Tcat Number: A//A Test Procedure Number: ~F-/6N2 feV. C Size and Style Valve: 6 R 10 HA 95FN s.t Fressure: /2co p.dg. Crosby Component Serial Number: N6256? 0006 Assembly Number: AJ62 Sr69 Crosby Factory Order Number: A/f95' 5' Iten:R Drawing Number: $-C-62569 Rev.) 5 Customer Mark or Tag Number: 1 PSV 30/2-Customer Order Number: PAv./66 l. High Flow Test Facility (H.F.T.F.) j 1.1 Operational Test Run Open Acca Reseat Back-Blow-Lift
Temperatures ---
i No. psia psia psia Pressure down % inches Sprina Body Ambient Spring No.: A/r317f 1 //97 /2 (<~ fr IV (89 3.9 /,0 3 9G 2c/ fE Fina1 Ring Setting: 2 /899
- 2f3 18 5~S' (87 3, 9
(.0M 10/ Zo# 91 N.R.: ~ fnn 5 !!97 42.ste it 5'7 ($C 36 1.04 10 2. 21 1 tE C.R.: -ST Instrument Calibration Date: d-2-8b Tested By: b ) k W V 48s / Reviewed / Accepted
- / /or W
i 1.2 Seat 14akane Test hs C Seat Leak Pressures (O N M/b Tested By: ' A Test Time: 's 4/Afv765 Results: SA715 Et4 c,TV /2 M Reviewed / Accepted I 2[Af w 2. Production Test Facility (500 Ft.s) 2.1 See Pressure verification Test f Test Cage Serial Number: Run Open Cage Calibration Dates No. psig i f 2 3 l 2.2 Seat Leakate Test Seat Leak Pressure: Tested By: l Test Time: Results: } Reviewed / Accepted By: Test Gege Serial pueber ,I Case Calibration Date Ring Setting (As Shipped): M.R.: - / 00 C.R.: "JD -WC, m J,,}n kt 647 Set ny: y g&fgfhY h$ Y Se he g*&5
m
- 8. D.1.1.
1 CROSOY V A LV E O GAGE C0 0 P A N Y C FT O S B Y ~ WRENTHAM, MASS T FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/1VES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. l.1 Kendrick St.
Wrentham. MA 02093 Name and Address Model No. HA-75-FN order No. N64343 Contract Det,3/5/79 National Board No. -- Georgia Power corp., P.O. Box 4545
- 2. Manufactured For Atlanta. Georgia 30302 Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3013 serial NoN62569-00-0030 Drawing No. DS-C-62569 Rev. B Type Safety Orifice Size R
Pipe Size -- Inlet 6 outlet 10 Safety, Safety Relief. Pilot. Inch Inch inch Inch Power Actuated
- 6. Set Pressure (psig) 1210 576 F
Rated Temperature 911779 lbs/hr sag 3 5% of S.P. Stamped Capacity ?.overoressure ~~ Blowdown (psig) Hydrostatic Test (psiR) Inlet 1845 outlet N/A (Applicable to Valves for Closed Systems Only) Pressure Retaining Pieces Serial No. Platerial Soeelficat ion Identification Including Type or Grade M
- a. hartoes Forgings Body N92894-33-0023 ASME SA105 g
N92953-33-0024 ASME SA105 Bonnet
- b. Bar Stock & Forgings M M A $ Pter N90087-52-0349 ASME SA193 Cr. B6 Nozzle N92896-32-0003 ASME SA182 Type F316 Insert N92898-34-0119 ASME SA637 Gr. 718 Dise N92950-32-0038 Spring WasherE62821-32-0039 N92951-32-0011 ASME SA105 Adjusting BoltK63649-25-0021 N93583-25-0021
,ASMBGAlb[.rv.Cr. ' B 6 spindle K63648-31-0014 .N8889 5-42-02110 ' ' ASME SA N3"Cr. B6
- c. Spring K62821-32-0039 NX3378-31-0016 ASTM A689-74
- d. Bolting
- e. Other Pieces Bonnet Stud 1614 ASME SA193 Gr. B7 Bonnet Nut N88481 ASME SA194 Gr. ?H
~~ _h i FRon y
9 P. O. /. a_ CERTIFICATE OF COMPLIANCE We cer.ify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components, Section III, Div. 1, 1974 Edition, Addenda Winter 1975 , Code Case No. 2 Class (Date) Date 8/Mo Signed Crosby Valve & Cage Co. by (N Certificate Holder) QQ Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Design information on file at crnchy W1va A ca o run ny Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 ~~~ Stress report certified by ~~~ PE State Reg. No. Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory hatual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on
-/ //'I, 19Q and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components. By signing this certificate, neither the. Inspector nor his employer mak$s any warran't, ~ expressed or implL J.-concerning the equipment described in this Data Repot.t.' Further-more, neither the Inspector nor his employer shall be liable ingnyF5dhtleF'for any personal injury or property damage or a loss of any kingsdiffdg from or connected with this inspection. W' Date 19 ' _/r. '/// Commissions 'l.I d C { / 1 6 f' Signed '*4 (Inspector) (Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler 6 Machinery Div.
IECNTR 412
- q. g p
\\ CROSBY VALVE 6 CACE CC:' PAW e Wrantham, Massachusetts t1 D*
- s. 3. 3. i.,
VALVE TEST REPORT 6.3.3.1.1 Test Procedure No. T-16289 Rev. a
- s. a. s.;L g, 3, g,,3 Quality Assurance Instruction:
MO (# O [ f// ob Date: h//-F7.) Test No.: N/A Test Procedure No. @ /dr 289
- 432 al.,
Size and Style Valve: (mKjo RR 715-#A/ ~ Set' Pressure:f)/c r /c7o Crosby Component Serial No. : A.)(,35(,ct-co M O Assemb_y No.:A//,25(,9 Crosby Factory Order No.: M (al/31/3 Item No. 3 Drawing No..RFC-(m2Sd,9 Rev. J/ Customer's Mark or Tag No. : / PSV -3o/3 Customer's Order No.: ~P A V l/ u,, cos+. W ID ~ 1. Hydrostatic Test y Sggb-g / 0 Nozzle Dise Insert Valve Body (Outlet) i, V Pressure: I Time: k Results: / { Test Cage No.* / / /l/ h Gage Calibra. on/ D/tfe: '//' / Water Test.o.:/ / l Tested By: Reviewed and Date Date Date 3 Accepted By: I Date Date Date - 0 2. Final Setting Tests (Steam) ly l l 2.1 Valve Data 2 dC ~- b /d. Run Final Spring No. :AYt.578~8/~04 No. Open Close Blowdown Ring Setting: N.R.: --- 4, 6-1 /,:;/'/ //(,7 C.;;L I,4Mk[
- o G.R.:
.,/.g o 2 /Joj;- '// i'J MP ,' I Ambient Temperature: u */ 3 /#o/ //R. 3c/ A -2 i I ~ Test Cage No. : //S/// _ 4 ~ ~ k Cage Calibration Date: 9 </J-M 5 1 -l 2.2 Seat Leakage (Steam) , d 74.e.zt 9-r r' # Pressure:, /d 7'7 25/A Tested B : Time: A Jn/As Date 4A f $4>c/b, Results: 7 Reviewed and Test Cage No. : M/[ Accepted By: (,.,f. Cage Calibration'Date: 4' -/,d'O -s-9
- J Date 1,
Final Ring Setting: N.R.:-d[ ~,,Sej,Ry ' 9-//. -JO G.R. :-N60 u Date i i t BEatm 4I2 %IS'-S o . - _ -. - =... _. ~
WRENTHAM. MASSACHUSETTS j VALVE TEST DATA Nd4 ' Wality'AssuranceInstruction: 32.060 Date: Tcet Number: Test Procedure Number: C/68A>2 Med.C Sise and Style Valve: rif/C //A-FFAl Set Pressure: /2/C p.si.s. Crosby Component Serial Number: N62669-00-0030 Assembly Number: N67568f Crosby Factory Order Number: N6gi3~8~ Ites: g Drawing Number: 8 4256fRev.) Customer Mark or Tag Number: / PS V,g o/.2 customer Order Number:o8N- @ 1. High Flow Test Facility (H.F.T.F.) 1.1 Operational Test Run Open Accum Reseat Back-Blow-Lift
Temperatures ---
No. psia psia psia Pressure down % inches Sprina Body Ambient Spring No.: AIX3378 1 /209
- 25'l
//ft li1
- 44. (
t, o4/ /00 2o4 g2. Final Ring Setting: 2 i 20C-12(/ if fd l#I 4/, G /. 0 ( /0 7. 207 P s' N.R.: -t 3 0 3 I20 ) f r.TD /t ftp 18 G 4/. [ /.O_f /0 Z-di 2 SG c.R.: - 50 Instrument Calibretion Date: " 3 '8(e Tested By: A S./ 3!A L y-Reviewed / Accepted By: i u I 'I I M i-1.2 Seat Leakane Test Seat Leak Pressure tO8T [$/[r Tested By: V.7 A C V' Test Time. Results: e./MS4r/4p/$cJ$2 / Reviewed / Accepted By: E - ~ 8-lhfit 2. Production Test Facility (500 Ft.8) 1 2.1 Set Pressure Verification Test Test Cage Serial Number .,2 7.7-f Run Open Case Calibration Date: M/f/88 No. psia ggg 1 /2/7 ys a 3 h i 2 A//A g p, , - l, 89Q?8 3 w/X* \\ \\ \\ v 2.2 Seat Leakane Test d' ' N* (,Q Seat Leak Pressure /88945/f Teste 4/ N"' / Test Time: J m uel Results: h gpAcyM.f Reviewed / Accepted By: - 1 Y ** N Test Cage Serial Numbers l173 f W l Cage Calibration Date $ ///14 / Ring Setti As Shi N.R.: IT O CO .R.: Set ty: 4-/O-76 MA G. Ecve6o) d & b : .b. f $ W~O~5 J
- 8. 2. l. 2.
1 CROSBY VALVE O SAet CO M P A N Y CROSBY a p WRENTHAM, WASS j FORM NV-1 FOR SAFETY AND SAFETY RELIEF V/1VES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA REPORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. 43 Kendrick St.
Wrentham. MA 02093 Name and Address Mcdel No. HA-75-FN order No. N64343 Contract Date3/5/79 National Board No. Georgia Power Corp., P.O. Box 4545
- 2. Manufactured For Ar1nnen. Conrein 10107 order No.
PAV-466 'Name a'nd Address
- 3. Owner Alvin W. Vosttle Nuclear Power Plant Name and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3014 Serial NoN62569-00-0014 Drawing No. DS-C-62569 Rev. B Type Safety Orifice size R pip. S t, -- Inlet 6 outlet 10 Safety. Safety Relief. Pilot.
Inch inch Inch inch Power Actuated
- 6. Set Pressure (psig) 1220 576 F
Rated Temperature 919226 lbs/hr sag 3 Stamped Capacity 7,o y,,,,,,,,,, -- Blowdown (psig) 5% of S.P. Hydrostatic Test (psig) Inlet 1845 outlet N/A Pressure Retaining Pieces (Apolicable to Valves for Closed Systems only) Serial No. Material Specification Identification including Type or Grade Body N92894-31-0015 ASME SA105 (I,.i Bonnet N92953-33-0010 ASME SA105
- b. Bar Stock & Forgings D M d dPter N90067-42-0199 d
ASTM A193-76 Ga-- B6 ASME SA193 Gr. B6 Nozzle N92896-32-0015 ASME SA182 Type F316 Dise Insert N92898-33-0088 ASME SA637 Gr'.' 718 N92950-32-0019 Spring Washerd(62821-25-0001 N92951-32-0024 ASME SA105 Adjusting BoltK63649-25-0015 N93583-25-0015 ASME SA193 Gr. B6 Spindle K63648-03-0056 ,N88895-65-0372 ASME SA193 Gr. B6
- c. Spring K62821-25-0001 NX3378-31-0002 ASTM A689-74
- d. Bolting g.a
- e. Other Pieces Bonnet Stud N91614 v. m V "' AW S A19 3 Gr. B 7 Bonnet Nut N88481 ASME SA194 Gr. 2H 7/ont
i . - e 4 3F. JP. /. ;t CERTIFICATE OF COMPLLANCE su We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components, Section III, Div. 1, 1974 Edition, Addenda Winter 1975 , Code Case No. Class 2 (Date) Date 4///.5~//4 Signed Crosby Valve & Cage Co. by f___ (N Certificate Holder) (%,/ ( Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Design information on file at Croshv valve & cage enmnnny Stress analysis report (Class 1 only) on file at Design specifications certified by Ada I. Pressman PE State California Reg. No. 16552 Stress report certified by PE State Reg. No. 1Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on
~/ ' 7, 19 P r. and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components. By signing this certificate, neither the Inspector nor his employer makes any. warrant, expressed or implied, concerning the equipment described in this Data Report. Further-more, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising f rom-or connected with j this inspection. sa '7 Date 19 yvJ.~'h..'"' Signed I' A. ( - 'e// Commissions l' i *T C C / ? 6. v. 1 "I (Inspector) (Nat'l. Bd., State, Prov, and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler 6 Machinery Div.
dECNTEL 412 ,/
r / = O S 32) CROSBY VAI.VE & GAGE COPPANY ,\\ S 3.3. La Wrsntham, Massachusetts / \\, e
- 6. 3.B.L b
~ VALVE TEST REPORT 53.3.2 Test Procedure No. T-16289 Rev. O Quality Assura ce Instruction: SO 6 0 [ M el. Date: 9 -/N 60 Test No.: A JA Test Procedure No.: L -/ /(p;L79
- E5/l1 Size and Style'Vaive:_
(o JCJo M A @ #A/ Set' Pressure:/ m o r/$ Crosby Co:rponent Serial S'o.~ : Al lnELG9-co -co f V Assembly No. : a//m256 9 Crosby Factory Order No.: Af'(op.393 ~ Item No. ~4/ Dra.ing No. :b5f-6Jty(,iF Rev. J Customer's Mark or Tag No. : 1 ps\\/ - 3O M tustomer's Order No. : 'p/p V _ //g/,, d Cust. I4.
- 14 1.
Hydrostatic Test h4 gj.9 j Nozzle Dise Insert Valve Body (Outlet) Pressure: Time: Results: Test Gage No.- I Gage Calibration Date: " l Water Test No.: 3 e i, Tested By: 4 Date Date Date t Reviewed and 7, Accepted By: Date Date Date a 2. Final Setting Tests (Steam) lj 2.1 Valve Data Kun fs 5 /> 9
- 7,
} Final Spring No. : M L7 '79 No. Open Close Blowdo.m a Ring Setting: N.R.: - 2 s' 1 / 2 2 '/ //79
- 3. ~/
)f C.R.: + tro 2 122y t/f/ .t. 5-Ambient Temperature: M *4 3 /d4i e/79 f.4 '1 Test Gage No.:
- 0/t 4
/ lid l Gage Calibration Date: 9/a/<a 5 p//d S 4 i 2.2 Seat I.eakage (Sream) Pressure: //c.2 Tested By: h [M 9 >[fo Time: %,n Q / Dacc Results: $N T ~'" . Review"dandl 3 Test Gage No. : vo/g Accepted By: - f/M Gage Calibration Date: 1/o 4 Date Final Ring Setting: N.R.: - 35' Set By: 0.15.2., e,-/ngo G.R.: +/_sU (/ Date i BECNTEl 41 9.n.2n 'gt 1 ).
~ ~ ~ ~~ WRENTHAM, MASSACHUdt.IIS ~ ~ ~ ~ ~~~ ~ e VAI.VE TEST DATA I Quality Assurance Instruction: 72O&a Date: M"M-8fo Test Number: ai/a Test Procedure Number: 7-fran 2. 244/. O l Size and Style Valve: /,E/0 g,4 7f/4/ Set Pressure: /2.20 PS/d-i Crasby Component Serial Number: A//,2dd-Ob-oo/d Assembly Number: A/(,7,57,9 l Crt:sby Factory Order Number: A//, w g Ites: /(,# Drawing Number: ts-c-GysT,$ Rev.g Customer Mark or Tag Number: /Py b/ - w / Customer Order Number: /%/-y/s(, l 1. Bish Flow Test Facility (H.F.T.F.) 1.1 Operational Test j Run Open Accum Reseat Back-Blow-Lift
Temperatures ---
Mo. psia psia psia Pressure down % inches Sprina Bob Ambient Spring No.: AlvE E ?$_ 1 ILt9 tL7G 1979 20 0 3.d loof 92 2c(, 9l Final Ring Setting: 2 82: 7 iM2 il / G ~200 J. (s /.Os' /00 2,4 & 2. -l N.R.: -10 0 3 tin 1 eL76 187 0 2DO d.l /, cd 4g 2nd f0 C.R.: - (o Instrument Calibration Date: M-M-8[o Q/Q!AC Tested By: l Reviewed / Accepted By: b 1.2 Seat 14akane Test g Seat La'ak Pressure: ION M/h Tested By: I M t M!$[ I amtGA.77MA( 7D/2 / Reviewed / Accepted By: 2. Production Test Facility (500 Ft.8) 2.1 Set Pressure Verification Test Test Case Serial Number: ,77M Run Open Cage Calibration Date: Y8//6 No. psia BECHTEL 1 il 29 647 2 A/[A 3 At{rt 2.2 Sest Leekane Test / Seat 14ak Pressure /d 98 Tested By:' / Test Ties dssa/4/ b8d Results: A n,# w sAs>' Reviewed / Accepted By:. an Test Cage Serial Numbers
- 7Af G
Gage Calibration Date: W///4" 7tPC, $6.rptwc. s >.' Al 2 -/00 Mi,2L"'Adr PJJi G, it : ib m At. ~n.f. ser sy': 9-w -97, w -re-
ww 6 P. e?. l..'L d CROSBY V A LV E O GAGE CO O P A N Y f CROSBY o WRENTHAM, MAS $ r FORJ1 NY-1 FOR SAFETY AND SAFETY RELIEF V/IVES Q.C.-44D As Required by the Provisions of the ASME Code Rules DATA RF. PORT Safety and Safety Relief Valves
- 1. Manufactured By Crosby Valve & Cage Company. 43 Kendrick St.
Wrentham. MA 02093 Name and Address Model No. HA-75-FN order No. N64343 Contract oste 3/5/79 National Soard No. -- Georgia Power Cor P.O. Box 4545 Atlanta, Georgia $U502
- 2. Manufactured For Order No.
PAV-466 Name and Address
- 3. Owner Alvin W. Vogtle Nuclear Power Plant Nane and Address
- 4. Location of Plant Burke County, Georgia
- 5. Valve Identification 1-PSV-3015 Serial NoN62 569-00-0018 Drawing No. DS-C-62 569 Rev. B Type Safety Orifice Size R
pi p, S t,, -- Inlet 6 10 Outlet Safety, Safety Relief. Pilot, Inch Inch Inch inch Power Actuated
- 6. Set Pressure (psig) 1235 576 F
Rated Temperature Stamped Capacity ?. Overpressure " Blowdoe 4s W Hydrostatic Test (psig) Inlet 1853 Outlet N/A (Apnlicable to Valves for Closed Systems Only) Pressure Retaining Pieces Serial No. Material Srecification Identification Including Type or Grade Body N92894-31-0011 ASE SA105 Bonnet N92953-33-0020 ASE SA105
- b. Bar Stock & Forgings ASTM A193-76 Gr. B6 g grggApter N90087-39-0146 ASE SA193 Gr. B6 Norrle N92896-32-0030 ASE SA182 Type F316,
~ Disc N92898-34-0107 ASE SA637 W71[ Insert N92950-32-0021 Spring WasheraK62821-25-0010 N92951-32-0031 ASE SA105 Adjusting BoltK63649-25-0012 N93583-25-0012 ASE SA193 Gr. B6 ASTM A193 Gr. B6 Spindle K63648-31-0009 N88895-42-0169 ASME SA193 Gr. B6
- c. Spring K62821-25-0010 NX33,78-31-0033 ASTM A689-74
- d. Bolting
- e. Other Pieces Bonnet Stud 1614 ASE SA193 Gr. B7 Bonnet Nut N88481 ASME SA194 Gr. 2H
~- FEon T
1 N O F.o?. l..~L CERTIFICATE OF COMPLIANCE We certify that the statements made in this report are correct and that this valve conforms to the rules of construction of the ASME Code for Nuclear Power Plant Components, Section Code Case No. III, Div. 1, 1974 Edition, Addenda Winter 1975 Class 2 (Date) 4//S/74 Signed Crosby Valve & Gage Co. by / Date (N Certificate Holder) Q( Our ASME Certificate of Authorization No. 1878 to use the NV symbol expires September 30, 1980 (Date) CERTIFICATION OF DESIGN Design information on file at g7c33y y= 7.,c 7, g c ,p Stress analysis report (Class 1 only) on file at 1 Design specifications certified by Ada I. Prememan PE State California Reg. No. g5$7 Stress report certified by PE State Reg. No. 1Signature not required - list name only. CERTIFICATE OF SHOP INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Massachusetts and employed by Factory Mutual Systems
- of Norwood. Massachusetts have inspected the pump, or valve, described in this Data Report on 7 / / ~/, 196 O and state that to the best of my knowledge and belief, the N Certificate Holder has constructed this pump, or valve, in accordance with the ASME Code for Nuclear Power Plant Components.
By signing this certificate, neither the Inspector nor his emplpyar makes any warrant, expressed or implied, concerning the equipment,deqcribed*fn this Data Report. Further-more, neither the Inspector nor his employer stiall be liable in any manner for any personal injury or property damage or a loss of any kind, arising from or connected with this inspection. ~' Date 19 ' ' Signed ) ~ f / /- Commissions .\\.I n e .. t i_ / ( ( / c (Inspector) (Nat'l. Bd., State, Prov. and No.)
- Arkwright-Boston Manufacturers Mutual Insurance Company - Mutual Boiler & Machinery Div.
412
I L. U i t O c. l D
- {p 3,3,3 CROSBY VALVE & GAGE COMPANY cr Wrenthan, Massachusetts R(\\
.5.3.3, I.q VALVE TEST REPORT $,3,3,l, h S.3.3..'L, Test Procedure No. T-16289 Rev. M g, 3, 3 Quality Assurance Instruction: 3 2 O (r O K M 2 Date: 9- /[c -fd Test No.: A//A Test Proc'edure No. :-"7 - /(p.7 F'9 igg /. A Size and Style Valve: ' (sMO MM JS - [A/ Set Pressure:1.13ts" # /Yo
- Crosby Co ponent Serial No.: Allo 3 Slo 9 -CO-Oc t ?
Asse=bly No.: N[op:$ 69~ Crosby Factory Order No. : sj tot /3//3 Item No. 5 Drawing No. :DS-t_- /AS4,9 Rev. 8 / PSV-SolS Customgr's Order No.:"p/fy /ga(s Customer's Mark or Tag No.i ~ Cu s+. W."@ ~ 1. Hydrostatic Test gy_n gggf7 jg, Nozzle Dise Insert Valve Body (Outlet) i Pressure: / Time: Results: / / / i, Test Gage d Gage Calibration Date: / /# / /W Water Test No.: / /' l / i Tested By: Date Date Date Reviewed and Accepted By: l Date Date Date 2. Final Setting Tests (Steam) I i 2.1 Valve Data / 8 3 2-MS /,d, Run i Final Spring No. :Nf94 9fS-32-dojo No.
- Open, Close Blowdown i
Ring Setting: N. R'. : '/f 1 /J2M //)f SF 9/ 'G.R. : +/50 2 fp ga //73 ,5 9 y ~ Ambient Te=perature: 76*f 3 /#.M ' // M 67 M7 -2 l l Test Gage No.: M//; 4 Gage Calibration Date: f-/.2-/D 5 l 2.2 Seat Leakage (Steam) Pressure: ///d @,4 6, Tested B[, /Jn h M F-/f-88 Time: &6. r Ar. gDate i Results: < A /,s[,#.c Af../ Reviewed and. 4dj{ i (f)g/)h Test Gage No.: Vd/S / JAccepted'By: Gage Calibration Date: 9-M2-fd T.x ' ' Date Final Ring Setting: N.R.: - #f' Set By /) O 9-/4-73 G.R. : -hSO W Date nenin 412 $-114b
CDUlTUEE O GAuc. tunrei a6u w. WRENTHAM, MASSACHUSETTS C p. VALVE TEST DATA Quality Assurance Instruction: 326&C Date; d[4/ (, Tost Numbet': A//A fest Procedure Number: T-/(,+/72. 24V. O Size and Style Valve: toefo fJ/1?f'#N Set Pressure: 72 ff Pf/6 Crosby Component Serial Number: 4G26A-0o - o o /8 Assembly Number: A/G2 (ir9 Crosby Factory Order Number: a/ b7fr(" Ites:d Drawing Number: b y-t -( 25Cd)Rev.2 Customer Mark or Tag Number: / Os v - 70/3' Customer Order Number: F4t/-4//fG.. 1. High Flow Test Facility (H.F.T.F.) 1.1 Operational Test Run open Accis Reseat Back-Blow-Lift --- Temperatures --- No, psis psia pala Pressure down % loches Spring Body Ambient Spring No.: A/f T378 1 12 W
- 276 ffb 2dle J.4
- f. 8 I
/Of 2(9 7T Final Ring Setting: 2 s 2s/3 e2M t t 78* Zo(, 4.8 / 81 f07 7d 74
- n. R. :
-t10 3 (24i ( 2 71-II 8 l'
- Ec(o d.h I. Ii 108 ZJi
@0 C.R.: ST Instrument Calibratton Date: Y~ b Tested By: d t/!# (, Reviewed / Accepted By:
- / #
w 1.2 Seat Leakage Test /MaJf-h-6//a/u Seat Leak Pressure: // / 2-PS/G-Tested sy Test Time: t/ f 5ATif.,::'Acyph / Reviewed / Accepted By '/ At Results: A N (' l 'd' 2. Production Test Facility (500 Ft.s) (,,, S .1: e s 2.1 Set Pressure Verification Test .N Test Cage Serial Number: J 72_9 RuriW ' open Cage Calibration Date
- }l81L(o No.
psia O 1 /L YY 1 abr-BECHTEL Nh 647 3 2.2 Seat Leakage Test I /r / Seat Laak Prassure /// /vsM Tested By: ~ / g / Test Times .3,s,u / ~ Results: S/9 ftsfe/c/ax Reviewed / Accepted By: Test Cage Serist Numbers av/4 Case Calibration Date:
- //A/P/e Ring Setti (As Shi
): N.R.: ' -f W R.: '* [D i set sy 4
- _/0 - Yp h(,ygjgge/AIG se5vidv) d A Pf$10&L.
- >.f. fjuCD, k' ZEN