Forwards Safety Insp Repts 50-295/86-31 & 50-304/86-31 on 861230-870103 & Notice of Violation
ML20211Q693
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 02/21/1987
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211Q697 List:
References
NUDOCS 8703030165
Download: ML20211Q693 (2)


See also: IR 05000295/1986031

Text

. .

4

o ,s o

,

FEB 211987 -

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by NRC inspectors,

M. M. Holzmer and P. L. Eng of this office on December 30, 1986 through

February 3,1987, of activities at the Zion Nuclear Generating Station,

authorized by Licenses No. DPR-39 and No. DPR-48 and to the discussion

of our findings with Mr. G. Pliml at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. Our concern with

this violation is not based so much on the short time that surveillance

requirements were not implemented, as on the six months that were available

to put procedures in place before the requirements took effect. A written

response is required.

With regard to the December 30, 1986 event in which Unit 2 Reactor Coolant

System pressure was below the Technical Specifications lower limit of 2205

psig, we are concerned that this pressure transient was not detected for over

three hours by either the unit operator or shift supervision. We are also

concerned that no Reactor Coolant System low pressure alarm was received.

In addition to your response to the Notice of Violation described in the

preceding paragraph, please include your assessment of the two concerns

described above, and any actions taken or planned to prevent their recurrence.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

.

G703030165 EI70221

PDR ADOCK 05000295

G PDR

1C g

\

_ - - .

. , , , _ . . - , . __ . . , , - . - , . _ _

v

.

Commonwealth Edison Company 2

FEB 21887

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

65}@jji,EL fi+ . ,2 2r C. ,U.g!OpqTpp

7

Charles E. Norelius, Director,

Division of Reactor Projects

Enclosure: Inspection Reports

No.50-295/86031(DRP);

No. 50-304/86031(DRP)

cc w/ enclosure:

D. L. Farrar, Director

of Nucledr Licensing

G. J. Plim1, Station Manager

Jan Norris, Project Manager, NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

Mayor, City of Zion

i