NRC MONTHLY OPERATING REPORT DOCKET NO.
50-206 UNIT NAME SONGS - 1 DATE nac.nmhor 15. 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 OPERATING STATUS
- 1. Unit Name: San Onofre Nuclear Generating Station, Unit 1
- 2. Reporting Period: November 1986
- 3. Licensed Thermal Power (MWt):
1347
- 4. Nameplate Rating (Gross MWe):
456
- 5. Design Electrical Rating (Net MWe):
436
- 6. Maximum Dependable Capacity (Gross MWe):
456
- 7. Maximum Dependable Capacity (Net MWe):
435
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
NA l
- 9. Power Level To Which Restricted, If Any (Net MWe):
390
- 10. Reasons For Restrictions, If Any:
Self-imposed power level limit to control steam generator tube corrosion.
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720.00 8,016.00 170,600.00
- 12. Number Of Hours Reactor Was Critical 640.90 2,285.03 93,388.32
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 634.78 2,047.31 94,419.08
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 763,915.46 2,159,474.46 119,469,701.51
- 17. Gross Electrical Energy Generated (MWH) 250,200.00 691,162.38 40,520,796.38
- 18. Net Electrical Energy Generated (MWH) 234,068.00 618,128.00 38,258,603.00
- 19. Unit Service Factor 88.16%
25.54%
55.35%
- 20. Unit Availability Factor 88.16%
25.54%
55.35%
- 21. Unit Capacity Factor (Using MOC Net) 74.56%
17.69%
51.44%
- 22. Unit Capacity Factor (Using DER Net) 74.56%
17.69%
51.44%
- 23. Unit Forced Outage Rate 11.84%
29.80%
21.33%
- 24. Shutdowr.s. Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Mid-Cycle outage-April 10, 1987, 45-day duration
- 25. If Shutdown At End Of Report Period, Estimated Date of Startup:
NA
- 26. Units In Test Status (Prior To Commercial Operation):
Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
(([ 2'd 7596u/3 8703030027 e61130 PDR ADOCK 05000206
/
g/ [
p PDH
~ AVERAGE DAILY UNIT POWER LEVEL 1
DOCKET NO.
50-206 UNIT SONGS - 1 DATE December 15, 1986 COMPLETED BY E. R. Stacor TELEPHONE (714) 368-6223 MONTH: November 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 369.92 17 175.88 2
382.88 18 319.29 3
382.08 19 327.50 4
381.75 20 335.08 5
382.58 21 382.00 6
381.96 22 382.88 7
380.88 23 383.17 8
381.08 24 383.38 8
9 379.46 25 383.42 10 380.67 26 383.04 11 379.79 27 383.33 12 381.63 28 383.96 13 239.67 29 383.63 14 0.00 30 383.17 15 0.00 31 N/A 16 0.00 7596u/4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-206 UNIT NAME $ONGS - 1 REPORT MONTH NOVEMBER 1986 DATE nocomF m-1%
1986 COMPLETED BY E. R.
S soo r TELEPHONE (7141 368-6223 Method of Shutting Down System Component Cause & Corrective 1
Dura t ion 2
3 LER 4
4 Action to No.
Date Type (Hours)
Reason Reactor No.
Code Code Prevent Recurrence 105 861113 F
44.52 H
1 NA SJ P
Plant shutdown was. initiated to investigate ana repair an oil leak in the West Main Feedwater Pump (MFP) motor bea rings. The oil leak resulted from a combination of missing flow restricting orifices in the motor bea ring oil supply lines and excess clearance between upper and lower bearing housing shells introduced following a recent bearing replacement and pump overhaul. To p revent recurrence, the flow restricting orifices have been installed and the clearance between the motor bearing housing shells was corrected to design specification.
1 2
3 4
F-Fo rced Reason:
Method:
IEEE Std. 803-1983 S-Scheduled A-Equipment fa ilure ( Explain) 1-Manual B-Maintenance or Test 2-Manual Sc ra m.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 4-Continuation from E-Operator Training & License Examination Previous Month F-Adm i n i s t ra t i ve 5-Reduction of 20%
G-Ope ra t iona l Error (Expla in) or Greater in the H-Other ( Expla in)
Past 24 Hours i
6-Other (Expla in)
}
7596u/5 l
t
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET 50-206 UNIT SONGS - 1 DATE December 15. 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 DATF.
TIME EVENT November 1 0001 The Unit is in Mode 1 at 85% reactor pcuer.
4 Turbine load at 369 MWe gross.
Reactor power increase continues following condenser water box cleaning.
0945 Reactor power at 93%. Turbine load at 405 MWe gross.
November 13 1410 Initiated a precautionary shutdown to investigate and repair lube oil leak on West Main Feedwater Pump (MFP) motor bearing.
1746 Unit taken off line.
1800 Entered Mode 3.
2 November 17 0051 Entered Mode 2 following repairs to West MFP motor bearing oil leak.
0052 Reactor made critical.
0659 Entered Mode 1.
Unit synchronized to the grid.
1435 Reactor power at 90%.
Turbine load at 397 MWe gross.
November 30 2400 Unit is in Mode 1 at 92% reactor power.
Turbine load at 404 MWe gross.
7596u/6
o REFUELING INFORMATION DOCKET NO.
50-206 UNIT SONGS - 1 DATE December 15, 1986 COMPLETED BY E. R. Siacor TELEPHONE (714) 368-6223 MONTH:
November 1986 1.
Scheduled date for next refueling shutdown.
March 1988 2.
Scheduled date for restart following refueling.
June 1988 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined What will these be?
Not yet determined 4
4.
Scheduled date for submitting proposed licensing action and supporting information.
Not applicable 5.
Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
None 6.
The number of fuel assemblies, a) In the core.
157 b) In the spent fuel storage pool.
146 7.
Licensed spent fuel storage capacity. 216 Intended change in spent fuel storage capacity. Under review 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
March 1988 7596u/7
,,m y
i-.
7,-
--e
---y
+m--.--
- ---e.
b;.
s a/~eYY Southem Califomia Edison Company SAN ONOFRE NUCLEAR GENERATING STATION P. O. BOX t 28 SAN CLEMENTE. C ALIFORNIA 92672 H.E. MORGAN TELEPHONE December 15, 1986 m amse erarma - acEn Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Subject:
Docket No. 50-206 Monthly Operating Report for Noveraber 1986 San Onofre Nuclear Generating Station, Unit 1 Enclosed is the Monthly Operating Report as required by Section 6.9.1.10 of Appendix A, Technical Specifications to Provisional Operating License DPR-13 for San Onofre Nuclear Generating Station, Unit 1.
Plea:e contact'us if we can be of further assistance.
Sincerely, Mb Enclosures cc:
J. B. Martin (Regional Administrator, USNRC Region V)
F. R. Huey (USNRC Senior Resident Inspector, Units 1, 2 and 3)
R. F. Dudley, Jr. (USNRC Unit 1 Project Manager, Office of Nuclear Reactor Regulation)