Forwards Insp Rept 50-400/86-90 on 861112 & 13 & Notice of Violation.Notice of Violation Withheld (Ref 10CFR2.790 & 73.21)
ML20211P643
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/15/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20211P648 List:
References
NUDOCS 8612190113
Download: ML20211P643 (2)


See also: IR 05000400/1986090

Text

r

d

i

SAFEGUARDS IN D

DEC 15 8b

Docket No. 50-400

License No. NPF-53

Carolina Power and Light Company

ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-400/86-90)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

Orysia M. Masnyk on November 12 and 13,1986. The inspection included a review

of activities authorized for your Shearon Harris facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violations, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of

Violation.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

0612190113 861215

PDR

O ADOCK 05000400

PDR

ENCLOSURE CONTAINS

SAFEGUARbS INFORMATIO t

UFON SEPARATION THIS

SAFEGUARDS INFORMATION

    • "]

dI '

.

i

SAFECl D3 INFORMATION

Carolina Power and Light Company 2 DEC 151986

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Roger D. Walker

Roger D. Walker, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

(Safeguards Information)

2. NRC Inspection Report

(Safeguards Information)

cc w/encls:

R. A. Watson, Vice President

Harris Nuclear Project

D. L. Tibbitts, Director of Regulatory

Compliance

J. L. Willis, Plant General Manager

bec w/encis:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of North Carolina

pp j

0 yk:1b cG fre Cline JStdhr ellen PFredrickson DVerrelli

12/dj/86 12/; /86 12/,, /86

12/ '/86 12/f/86 12///86 1 /it /86 i

., ..'08 % CONTA g

  • "~

aAFEGUARDS m\ FORMATION .