Forwards SER Supporting Util 860825 Request for Further Relief from Exam Requirements for Pipe Welds Encapsulated within Containment Penetration Guard Pipes
ML20211P378
Person / Time
Site: Grand Gulf 
Issue date: 12/12/1986
From: Butler W
Office of Nuclear Reactor Regulation
To: Kingsley O
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20211P385 List:
References
TAC-62277, NUDOCS 8612190062
Download: ML20211P378 (2)


Text

-

~

December 12, 1986 Docket No. 50-416 DISTR"BUTION 7Doctet PUe; BGrimes Mr. Oliver D. Kingsley, Jr.

NRC PDR JPartlow Vice President, Nuclear Operations LPDR NThompson Mississippi Power & Light Company PDf4 Reading LKintner P. O. Box 23054 RBernero M0'Brien Jackson, Mississippi 39205 Young, OGC ACRS (10)

EJordan BTurovlin

Dear Mr. Kingsley:

SUBJECT:

REVISION TO INSERVICE INSPECTION RELIEF REQUEST N0. I-00007 Re:

Grand Gulf Nuclear Station, Unit 1 (GGNS-1)

By letter dated July 22, 1986, the NRC staff granted relief from certain ASME Code inspection and testing requirements for some of the components in GGNS-1.

For Relief Request No. I-00007, relief was granted from volumetric examination of about 50% of the weld lencth on pipes encapsulated within containment penetration guard pipes, provided that code-required surface examinations would be performed. Volumetric examination of about 50% of the welds can be performed through ports in the guard pipes.

By letter dated August 25, 1986, Mississippi Power & Light Company requested further relief from examination requirements for pipe welds encapsulated within containment penetration guard pipes (Revision to Relief Request No.

I-00007). The licensee determined that it was impractical to perform surface examinations on more than about 50% of the weld length whereas the code requires surface examination on 100% of the weld length.

The NRC staff has completed its review of your August 25, 1986 submittal and has concluded that the relief request is appropriate. The staff's safety evaluation report is enclosed.

In reaching this conclusion, the staff has determined that the inspection and testing requirements are impractical and, pursuant to 10 CFR 50.55a(g)(6)(1), that the granting of relief is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest.

In making this determination, the staff has given due consideration to the burden that could result if those requirements were imposed on your facility.

Sincerely, Orideal Shmed by b

DO N $Io$o$16 Walter R. Butler, Director P

PDR BWR Project Directorate No. 4 Division of BWR Licensing

Enclosure:

As Stated cc: See next pag g

)

  1. /

OG ti PDf4/D en LKintner:ca MYoung WButler N

\\yQky s u 11rk

/wti nigt

o 4

Mr. Oliver D. Kingsley, Jr.

o Mississippi Power & Light Company Grand Gulf Nuclear Station cc:

Robert B. McGehee, Esquire The Honorable William J. Guste, Jr.

Wise, Carter, Child, Steen and Caraway Attorney General P.O. Box 651 Department of Justice Jackson, Mississippi 39205 State of Louisiana Baton Rouge, Louisiana 70804 Nicholas S. Reynolds. Esquire Bishop, Liberman, Cook, Purcell Office of the Governor and Reynolds State of Mississippi 1200 17th Street, N.W.

Jackson, Mississippi 39201 Washington, D. C.

20036 Attorney General Mr. Ralph T. Lally Gartin Building Manager of Quality Assurance Jackson, Mississippi 39205 Middle South Services, Inc.

P.O. Box 61000 Mr. Jack McMillan, Director New Orleans, Louisiana 70161 Division of Solid Waste Management Mississippi Department of Natural Mr. Larry F. Dale, Director Resources Nuclear Licensing and Safety Bureau of Pollution Control Mississippi Power & Light Company Post Office Box 10385 P.O. Box 23054 Jackson, Mississippi 39209 Jackson, Mississippi 39205 Alton B. Cobb, M.D.

Mr. R. W. Jackson, Project Engineer State Health Officer Bechtel Power Corporation State Board of Health 15740 Shady Grove Road P.O. Box 1700 Gaithersburg, Maryland 20877-1454 Jackson, Mississippi 39205 Mr. Ross C. Butcher President Senior Resident Inspector Claiborne County Board of Supervisors U.S. Nuclear Regulatory Connission Port Gibson, Mississippi 39150 Route 2 Box 399 Port Gibson, Mississippi 39150 Mr. Ted H. Cloninger Vice President, Nuclear Engineering Regional Administrator, Region II and Support U.S. Nuclear Regulatory Commission, Mississippi Power & Light Company 101 Marietta Street, N.W., Suite 2900 Post Office Box 23054 Atlanta, Georgia 30323 Jackson, Mississippi 39205 Mr. J. E. Cross Grand Gulf Nuclear Station Site Director Mississippi Power & Light Company P.O. Box 756 Port Gibson, Mississippi 39150 Mr. C. R. Hutchinson GGNS General Manager Mississippi Power & Light Company Post Office Box 756 Port Gibson, Mississippi 39150 i

..