ML20211M551
| ML20211M551 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/30/1986 |
| From: | Watson R, Westmoreland J CAROLINA POWER & LIGHT CO. |
| To: | Taylor J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| HO-863464-(O), NUDOCS 8612170338 | |
| Download: ML20211M551 (4) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
OPERATINC DATA REPORT DOCKET NO. 050-400 DATE 12/5/86 COMPLETED BY J. H. Westmoreland TELEPHONE (919) 362-2597 OPERATING STATUS
- 1. Unit Name: Shearon Harris Unit 1
- 2. Reporting Period: November 1986 Notes:
- 3. Licensed Thermal Power (MWt):
2775 Fuel load completed
- 4. Nameplate Rating (Cross MWe):
950 11/21/86; 157 Fuel
- 5. Design Electrical Rating (Net-MWe): 900 Assemblies are in the
]
- 6. Maximum Dependable Capacity (Cross-MWe): 950 Reactor Vessel.
'7. Maximum Dependable Capacity (Net-MWe): 900
- 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level to Which Restricted, If Any (Net-MWe):
0 MWe-Net; Unit Restricted to 5% Thermal Power by NRC License
[
- 10. Reasons for Restrictions, If Any: Operating License Restricted to 5%
Harris Unit 1 is in Start-up/ Power Ascension Test Phase.
This Month Yr.-to-Date Cumulative
- 11. Hours in Report Period 0
0 0
- 12. Number of Hours Reactor Was Critical 0
0 0
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On-Line 0
0 0
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Cross Thermal Energy Generated (MWH) 0 0
0
- 17. Cross Electrical Energy Generated (MWH) 0 0
0
- 18. Net Electrical Energy Generated (MWH) 0 0
0
- 19. Unit Service Factor N/A N/A N/A
- 20. Unit Availability Factor N/A N/A N/A
- 21. Unit Capacity Factor (Using MDC Net)
N/A N/A N/A
- 22. Unit Capacity Factor (Using DER Net)
N/A N/A N/A
- 23. Unit Forced Outage Rate N/A N/A N/A
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shutdown at End of Report Period, Estimated Date of Start Up:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 12/26/86 N/A INITIAL ELECTRICITY 01/08/37 N/A COMMERCIAL OPERATION 03/04/87 N/A 86152170338 861130 PDR ADOCK 05000400 R
.t.
MEM/H08634640/ PACE 2/OSI
'CP&L CO.:
PLANT PERFORMANCE DATA SYSTEM APPENDIX B - AVERAGE DAILY POWER LEVEL HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY J. H. WESTMORELAND TELEPHONE (919)362-2597 NOVEMBER 1986 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
16 0
1.16 - 8 CEH086/ attach 3464/2/OS4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
050-400 f
UNIT NAME:
Harris l
DATE:
12/5/86 CONPLETED BY:
J. H. Westmoreland REPORT.NONTH: November 1986 TELEPHONE:
(919) 362-2597 i
op Licensee y,n Cause & Corrective c-n No.
Date oa gg Event 3
Action to e
yj ygm Report #
o Prevent Recurrence o
y o"
S;
'50 E
E"5{
"o n
o x
mu u
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A l
i
\\
k t
k
's
\\,.
Reason:k 1
2 3
4 F: Forced
(
Nethod:
Exhibit C-Instructions S: Scheduled A-Equipnwnt Failure (Explain) 1-Hanual for Preparation of Data B-Maint4 nance or Test 2-Manual Scrant.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File D-Regulaitory Restriction 4-Continued (NUREC-0161)
E-Operai:or Training & License Examination 5-Reduced Load F-Admin-istrative 6-Other 5
C-Operai:lonal Error (Explain)
Exhibit 1-Same Source if-Other (Explain) i b
I CEH086/ attach 3464/3/0S4 l
\\
\\
Cp&L Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. O. Box 165 New Hill, North Carolina 27562 DEC 121966 File Number: SHF/10-15505 Letter Number: HO-863464 (0)
Mr. James M. Taylor, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET No. 50-400 LICENSE NO. NPF-53 MONTHLY OPERATIONS REPORT
Dear Mr. Taylor:
In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of November, 1986.
Very truly yours, E
R. A. Watson Vice President Harris Nuclear Project MWH:bb Enclosure cc:
Dr. J. Nelson Grace (NRC)
SEY r[I CEH086/H03464/1/OS4
-