ML20211M145
| ML20211M145 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 12/11/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20211M148 | List: |
| References | |
| NUDOCS 8612160279 | |
| Download: ML20211M145 (2) | |
See also: IR 05000313/1986031
Text
DEC 1 1 1986
'
In Reply Refer To:
Dockets:
50-313/86-31
50-368/86-31
Arkansas Power & Light Company
ATTN:
-Mr. Gene Campbell
Vice President, Nuclear
Operations
P. O. Box 551
Little Rock, Arkansas
72203
Gentlemen:
This refers to the inspection conducted by Mr. H. D. Chaney of this office
during the period October. 6-10, 1986, of activities authorized by NRC Operating
License DPR-51 for Arkansas Nuclear One, Unit 1, and to the discussion of our
findings with Mr. J. M. Levine and other members of your staff at the conclusion
of the inspection.
Areas examined during the inspection included the Radiation Protection Program
for the Unit 1 refueling outage. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector.
The inspection findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8612160279 861211
ORIGINAL SIGNED BY*-
ADOCK 05000313
a
J. E. Gagliardo, Chief
.
Reactor Projects Branch
Enclosures:
(see next page)
A
RIV:FRPS
C:FRPS
C:R&SPh
C:RP
C:RPB
(1./ /86
F/ /86
19-/ /86
11/ / 10/ 8 6
/L//j '
b(p
HDChaney/hdc
BMur ay
WLF1 er
DRHu er
JEGagl
o
4[r
- - - -
.-
.
.
-- ..- -
. . - ,
'9
5
Arkansas Power & Light Company
-2-
Enclosures:
1.
Appendix A - Notice of' Violation
2.
Appendix B - NRC Inspection Report
50-313/86-31
50-368/86-31
Attachment - Documents Reviewed
cc w/ enclosures:
J. M. Levine, Director
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkansas
72801
Arkansas Radiation Control Program Director
bec to DMB (IE06)
bec distrib. by RIV:
- RPB
- RRI
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2015)
- RIV
DRSP
- RSB
- MIS System
- RSTS Operator
- BMurray
- HDChaney
- WLFisher
RLBangart
- w/766