Text

______-____ - __ ___ _ . _ _ .

BRAIDWOOD NUCLEAR POWER STATION UNIT 1 MONTHLY PERFORMANCE REPORT b_

4 COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-456 LICENSU NO. NPF-59 8612160022 861130 DR ADOCK O 4y6

.l-ad (4126z) /

//

II. Monthly Report for Braidwood Unit 1

.,- A. Summary of Operating Experience for Unit 1 The initial core load was completed on November 3, 1986.

Mode 5 was entered for the first time on November 16, 1986.

K.

i (4126z)

B. OPERATING DATA REPORT DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 12/05/86 COMPILED BY: B. M. Peacock TELEPHONE: (815)458-2801 ext. 2480 OPERATING STATUS

'1. Reporting Period: November 1986 Gross Hours: 720

2. Currently Authorized Power Level (MWt): 0 Design Electrical Rating (MWe-gross): 1175 Design Electrical Rating (MWe-net): 1120 Max Dependable Capacity (MWe-net): 0
3. Power level to which restricted (If Any): 0 (MWe-gross)
4. Reasons for restriction (If any): Low power testing license has not been received yet.

THIS MONTH YR TO DATE CUMULATIV_E

5. Report period Hours: 720 1056 1056
6. Hours Reactor Critical: 0 0 0
7. RX Reserve Shutdown Hours: 0 0 0 I
8. Hours Generator on Line: 0 0 0
9. Unit Reserve Shutdown Hours: 0 0 0
10. Gross Thermal Energy (MWH): 0 0 0 1
11. Gross Elec. Energy (MWH): 0 0 0
12. Net Elec. Energy (MWH): 0 0 0 T
13. Reactor Service Factor: 0 0 0
14. Reactor Availability Factor: 0 0 0
15. Unit Service Factor: 0 0 0
16. Unit Availability Factor: 0 0 0
17. Unit Capacity Factor (MDC net): 0 0 0
18. Unit Capacity Factor (DER net): 0 0 0 i

r

19. Unit Forced Outage Hours: 0 0 0
20. Unit Forced Outage Rate
0 0 0
21. Shutdowns Scheduled Over Next 6 Months: N/A N/A N/A i 22. If Shutdown at End of Report Period, Estimated Date of Startup: 02/01/87 N/A N/A
23. Units in Test Status (Prior to Commercial Operation):

1 FORECAST ACHIEVED

! Initial Criticality 02/01/87 l Initial Electricity 03/05/87 Commercial Operation 05/31/87 _ _ _ _ _ _ _ _

(4126z)

D. UNIT SHUTDOWNS /R5l DUCTIONS DOCKET NO.: 50-456 UNIT: Braidwood 1 DATE: 12/05/86 COMPILED BY: B. M. Peacock TELEPHONE: (815)458-2801

. ext. 2480 REPORT PERIOD: Novetaber 1986 l

l No DATE TYPE HOURS REASON METHOD LER NUMBER SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO PREVENT RECURRENCE N/A PRECRITICAL PERIOD eac**************

SUMMARY

one**************

l REASON METHOD SYSTEM & COMPONENT TYPE A-Equipment Failure Maint or Test 1 - Method Exhibit F & H F-Forced Instructions for Preparation of S-Scheduled C-Refueling 2 - Manual Scram D-Regulatory Restriction 3 - Auto Scram Data Entry Sheet E-Operator Training & License Examination 4 - Continued Licensee Event Report F-Administration 5 - Reduced Load (LER) File (NUREG-0161) l G-Oper Error 9 - Other l

H-Other l

l l

l (4126z) 1 _ - _ _ _ _ -

p -:

E. UNIQUE REPORTING REQUIREMENTS-4

1. Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION

'DATE ACTUATED ' ACTUATION CONDITION OF EVENT None

2. Licensee gri.etated changes to ODCM. (Y/N)

No (4126z)

F. LICENSEE EVENT REPORTS The following is a tabular summary of all Licensee Event Reports for Braidwood Nuclear Power Station, Unit One, submitted during the reporting period, November 1 through November 30, 1986. This information is provided pursuant to the reportable occurrence remeting requirements as set forth in 10CFR50.73.

Licensee Event Report Number Date Title of Occurrence 86-001-00 11/17/86 Interrupted Continuous Fire Watches i

t 1

i I

(4126z)

, .a

/ x Commonwealth Edison

/ -

\ Brtidwood Nucimr Pow:r St ti n

( '_i' f Rout 2 01, Box 84 y - / Braceville, Illinois 60407 Telephone 815/458-2801 i

EEF/86-619 File: AGNC-14 l 4

December 10, 1986 Director, Office of Resource Management United States Nuclear Regulatory Commission Washington, D.C. 20555 ATTN: Document Control Desk Gentlemen:

Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclear Power Station for the period November 1 through November 30, 1986.

Very truly yours, E. E. Fit patrick f(

Station Manager Braidwood Nuclear Power Station EEF/HDP/mjv (4126z) cc: J. G. Keppler, NRC, Region III NRC Resident Inspector Braidwood j Gary Wright, Ill. Dept. of Nuclear Safety

! D. P. Galle T. J. Maiman D. L. Farrar Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear Engineering INPO Records Center Performance Monitoring Group, Tech Staff Braidwood Station Nuclear Group, Tech Staff Braidwood Station J. Stevens - USNRC P. L. Barnes P. A. Boyle

/ s'?-

l 7 ,\'

-