Forwards Revised Page 3.7-13 & Associated Change to Encl 3 to 860415 Request to Revise Primary Containment Valve Listing in Tech Specs.Page Inadvertently Omitted from Proposed Change 2
ML20211K627
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/19/1986
From: Beckham J
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
0417H, 417H, SL-893, TAC-61054, TAC-61280, TAC-61281, TAC-61504, NUDOCS 8606300195
Download: ML20211K627 (3)


Text

4 Georgia Power Company 333 Pnximont Avenue Atlanta, Georgia 30308 Telephone 404 526-7020 Maang Address:

Post Office Bo< 4545 Atlanta, Georg>a 30302 h

Georgia Power J. T, Beck ham, Jr. tr+ wurnern electrc system Vice President and General Manager Nuclear Operat.ons 0417H June 19,1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 REQUEST TO REVISE PRIMARY CONTAINMENT VALVE LISTING TECHNICAL SPECIFICATIONS Gentlemen:

In our submittal (letter SL-580) to the NRC dated April 15, 1986, page 3.7-13 of our Proposed Change 2, as described in Enclosure 1 of the above-mentioned letter, was inadvertently omitted. The revised page 3.7-13 and the associated change to Enclosure 3 of SL-580 are enclosed.

Georgia Power Company regrets any inconvenience caused by this omission. If you have any questions regarding this matter, please contact this office at any time.

Sincerely, h Y J. T. Beckham JDH/sp Enclosure c: Georgia Power Company Nuclear Regulatory Commission Mr. d. P. O'Reilly Dr. d. N. Grace, Regional Administrator Mr. L. T. Gucwa Senior Resident Inspector Mr. H. C. Nix, Jr.

GO-NORMS State of Georgia 8606300195 860619 Mr. d. L. Ledbetter PDR ADOCK 05000321 P PDR 0417H #A bel llt

Georgia Power 4km ENCLOSURE 3 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 EDWIN I. HATCH NUCLEAR PLANT UNIT 1 REQUEST TO REVISE PRIMARY CONTAINMENT VALVE LISTING TECHNICAL SPECIFICATIONS PROPU5ED CHANGE TO TECHNICAL SPECIFICATIONS The proposed changes to the Technical Specifications (Appendix A to Operating License DPR-57) would be incorporated as follows:

Remove Page Insert Page ix ix 3.7-13 3.7-13 3.7-16 3.7-16 3.7-16a 3.7-17 3.7-17 3.7-18 3.7-18 3.7-18a 3.7-18b 3.7-19 3.7-19

3. 7-19a 3.7-23 3.7-23 3.7-24 3.7-24 3.7-25 3.7-25 3.7-26 3.7-26 3.7-26a 3.7-26b 3.7-27 3.7-27 1

0467C

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.7.C.1. Surveillance While Integrity Maintained (Cont'd)

b. Secondary containment capability to maintain a minimum 1/4-inch of water vacuum under calm win'd ( 5 mpi.)

conditions with each filter train flow rate not more than 4000 cfm shall be demonstrated at each refueling outage, prior to refueling.

3.7.C.2. Violation of Secondary 2. Surveillance After Integrity Violated i Containment Integrity

a. Without Hatch-Unit.1 second- After a secondary containment viola-ary containment integrity, tion is determined the standby gas restore Hatch - Unit 1 sec- treatment system will be operated ondary containment integ- immediately after the affected zones rity within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or per.- are isolated from the remainder of form the following (as appli- the secondary containment. The cable): ability to maintain the remainder (1) Suspen'd irradiated fuel of the secondary containmen't at and/or fuel cask handling 1/4-inch of water vacuum pressure in the Hatch-Unit 1 sec- under calm ( 5 mph) wind conditions i ondary containment. shall be confirmed.

(2) Be in at least Hot Shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and meet the Conditions of 3.7.C.1.a. within the next 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

b. Without Hatch-Unit 1 secondary

+

containment, refer to the follow-ing Hatch-Unit 2 Technical .

Specification, for LCO's to be followed-for Hatch-Unit 2:

(1) Section 3.6.5.1.

(2) Section 3.9.5.1.

D. Primary Containment Isolation Valves D. Primary Containment Isolation Valves

1. Valves Reauired to be Operable 1. Surveillance of Operable Valves During reactor power operation, Surveillance of the primary con-all primary containment isolation l tainment isolation valves shall be valves and all reactor coolant performed as follows:

system instru ment line excess flow

, check valves shall be operable except a. At least once per operating as stated in Specification 3.7.0.2. cycle the operable isolation valves that are power operated and automatically initiated shall be tested for simulated automatic initiation and the closure times. l HATCH - UNIT 1 3.7-13