ML20211K305
| ML20211K305 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 06/20/1986 |
| From: | Chan T Office of Nuclear Reactor Regulation |
| To: | Withers B PORTLAND GENERAL ELECTRIC CO. |
| Shared Package | |
| ML20211K306 | List: |
| References | |
| TAC-61645, NUDOCS 8606270364 | |
| Download: ML20211K305 (4) | |
Text
-
June 20, 1986 Docket No. 50-344 QISTRIBUTION E. Jordan DecRet-File B. Grimes NRC ' PDR ' ""
J. Partlow Local PDR T.Barnhart(4)
.Mr. Bart D. Withers PD#3 Rdg.
W. Jones Vice President Nuclear T. Novak E. Butcher Portland General Electric Company C. Vogan N. Thompson 121 S.W. Salmon Street T. Chan V. Benaroya Portland, Oregon 97204 K. Johnston Tech Branch OELD ACRS(10)
Dear Mr. Withers:
L. Harmon OPA Gray File LFMB The Commission has issued the enclosed Amendment No. 117 to Facility Operating License No. NPF-1 for the Trojan Nuclear Plant. The amendment consists of changes to the Technical Specifications in response to your application requested in a telephone conference on June 7,1986 and confirmed by letter dated June 9, 1986.
The amendment revises the Containment Spray System spray additive tank flow rate surveillance, Technical Specification 4.6.2.2.d, to reinstate the original test method.
A copy of the related Safety Evaluation is also enclosed.
The notice of issuance will be included in the Commission's next regular bi-weekly Federal Register notice.
Sincerely, Terence L. Chan, Project Manager PWR Project Directorate No. 3 Division of PWR Licensing-A
Enclosures:
1.
Amendment No. 117 to NPF-1 2.
Safety Evaluation cc w/ enclosures:
See next page
- SEE PREVIOUS PAGE FOR CONCURRENCES f
f PD#3*
PD#3*
PD#3*
OELD*
CVogan KJohnston TChan SVa h
6/16/86 6/16/86 6/16/86 6/ 1786
- 6 l
8606270364 860620 PDR ADOCK 05000344
)
P PDR
June 20, 1986 Docket No. 50-344 DISTRIBUTION E. Jordan Docket File B. Grimes NRC PDR J. Partlow Local PDR T. Barnhart (4) y Mr. Bart Q. Withers PD#3 Rdg.
W. Jones Vice Presi' dent Nuclear T. Novak E. Butcher Portland General Electric Company C. Vogan N. Thompson 121 S.W. Salmon 4treet T. Chan V. Benaroya Portland, Oregon \\97204 K. Johnston Tech Branch 0 ELD ACRS (10)
N L. Harmon OPA
Dear Mr. Withers:
Gray File LFMB The Comission has issued the enclosed Amendment No.117 to Facility Operating s
License No. NPF-1 for the Trojan Nuclear Plant. The amendment consists of changes to the Technical Specifications in response to your application requestedin a telephone confe'r nce on June 7, 1986 and confirmed by letter dated June 9, 1986.
The amendment revises the Containm'est Spray System spray additive tank flow rate surveillance, Technical Specifi ation 4.6.2.2.d, to reinstate the original test method.
A copy of the related Safety Evaluation also enclosed. The notice of issuance will be included in the Comission's next ular bi-weekly Federal Register notice.
Sincerely, Terence L. Chan, Pro ct Manager PWR Project Directorat No. 3 Division of PWR Licensin. A
Enclosures:
s 1.
Amendment No. 117 to NPF-1 2.
Safety Evaluation cc w/ enclosures:
See next page M
- SEE PREVIOUS PAGE FOR CONCURRENCES PD#3*
PD#3*
PD#3*
OE t
CVogan XJohnston TChan gf.
y a
6/16/86 6/16/86 6/16/86 6/j 7 6Jr 6
. ~ _. _..
June 20, 1986 Docket No. 50-344 DISTRIBUTION E. Jordan Docket File B. Grimes NRC PDR J. Partlow Local PDR T.Barnhart(4) i Mr. Bart D. Withers PD#3 Rdg.
W. Jones Vice President Nuclear T. Novak E. Butcher Portland General Electric Company C. Vogan N. Thompson 121 S.W. Salmon Street T. Chan V. Benaroya Portland, Oregon 97204 K. Johnston Tech Branch OELD ACRS(10) i
Dear Mr. Withers:
L. Harmon OPA i
Gray File LFMB The Commission has issued the enclosed Amendment No. 117 to Facility Operating I
License No. NPF-1 for the Trojan Nuclear Plant. The amendment consists of I
changes to the Technical Specifications in response to your application i
requestedin a telephone conference on June 7, 1986 and confirmed by letter i
dated June 9,1986.
The amendment revises the Containment Spray System spray additive tank flow rate surveillance, Technical Specification 4.6.2.2.d, to reinstate the original test method.
I A copy of the related Safety Evaluation is also enclosed. The notice of issuance I
will be included in the Commission's next regular bi-weekly Federal Register i-notice.
i i
Sincerely, f
Terence L. Chan, Project Manager PWR Project Directorate No. 3 1
j Division of PWR Licensing-A
Enclosures:
1.
Amendment No. 117 to NPF-1 2.
Safety Evaluation 1
I cc w/ enclosures:
~
i See next page t
PD#3 a
PDf3 g
PD#3 CVoga f KJoh st SVarga-6/lb/86 6/k/86
/#,/86 6/ /86 i
)
I d
r
, ~,,
,,,.... _ _. _,,.. -. ~,..,,,.,,
,....,e
--. vL,
(
w O
Trojan Senior Resident Inspector U.S. Nuclear Regulatory Commission Trojan Nuclear Plant Post Office Box 0 Rainier, Oregon 97048 Robert M. Hunt, Chairman Board of County Commissioners Columbia County St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy Labor and Industries Building Room 111 Salem, Oregon 97310 Regional Administrator USNRC, Region V Office of Executive Director for Operations 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 L
-