Submits Justification for Extension of Course of Action Commitment Included in NUREG-1177, SER Re Restart of Davis-Besse..., & Listing of Util Commitments Upon Which Restart Evaluation Rely, Per 861014 Telcon
ML20211J987
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/06/1986
From: Williams J
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-1177 1315, NUDOCS 8611140031
Download: ML20211J987 (2)


Text

_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ ____ _

. i TOLEDO

%sm EDISON Docket No. 50-346 JOE VVILUAMS. JR s.- u . %m % .,,

s4mmm t License No. NPF-3 smnwun Serial No. 1315 November 6, 1986 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz PWR Project Directorate #6 Division of PWR Licensing-B United States Nuclear Regulatory Commission Washington, D. C. 20555 Dear Mr. Stolz As discussed during a telephone conversation with Mr. A. W. DeAgazio of your staff on October 17, 1986, Toledo Edison herewith provides its justification for extension of a Course of Action commitment that has been included in NUREG-1177, " Safety Evaluation Report Related to the Restart of Davis-Besse Nuclear Power Station," and in the " Listing of Toledo Edison Commitments Upon Which Staff Restart Evaluation Rely," as attached to your August 28, 1986 letter (Log No. 2062). The specific item in this Ifsting in Number 30 and states " Preventive maintenance procedures for turbine bypass valve will be modified by November 1986 (p 3-25) ."

As communicated in the aforementioned conversation, the November 1986 revision date for the turbine bypass valves' preventive maintenance procedures was intended to coincide with the next (fifth) refueling outage for the Davis-Besse Nuclear Power Station. The next refueling outage is the next planned period for performing preventive maintenance on the turbine bypass valves when the preventive maintenance procedures will be needed. The Course of Action (Serial No. 1182, dated September 10, 1985),

Appendix IV.C.I.I. Plan No. 9A/B, Davis-Pesse Turbine Bypass Valve Actuator Failure, states "A Preventative Maintenance Program will be written to inapect all six turbine bypass valves during the next two refueling outages." From this it can be seen the revision of the preventive mainten-ance procedures at this time is not necessary to achieve the objective of the intended commitment. Therefore, Toledo Edison herewith proposes the statement from NUREG-1177 be revised to state " Preventive maintenance procedures for the turbine bypass valves will be modified by the fifth refueling outage."

8611140031 061106 PDR ADCCK 05000346 P PDR d0 THE TOLEDO LDiSON COMPAtu EDibON PLAZA 300 MADGON AvtNUE TOLEDO. ORO 43GW

a Dock t No. 50-346 License No. NPF-3 Serial No. 1315 November 6, 1986 ,

Page 2 t

This proposed revision was received favorably by Mr. DeAgazio in the aforementioned conversation and is herewith documented as Toledo Edison's  ;

commitment.

Very truly yours. .

f i D = __ J .

RMC pif cc: DB-1 NRC Resident Inspector