ML20211J694
| ML20211J694 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/06/1997 |
| From: | Le N NRC (Affiliation Not Assigned) |
| To: | Sumner H SOUTHERN NUCLEAR OPERATING CO. |
| Shared Package | |
| ML20211J698 | List: |
| References | |
| TAC-M97702, TAC-M97703, NUDOCS 9710080255 | |
| Download: ML20211J694 (3) | |
Text
October 6, 1997 Mr. H. L. Sumn:r, Jr.
Vice President Nucle:r hatch Project Southem Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 352011295
SUBJECT:
CORRECTED TECHNICAL SPECIFICATIONS PAGES - EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS. M97702 AND M97703)
Dear Mr. Sumner:
On September 5,1997, the Commission issued Amendment No. 208 to Facility Operating License No. DPR 57 and Amendment No.150 to Facility Operating License No. NPF-5 for the Edwin 1. Hatch Nuclear Plant (Hatch), Units 1 and 2, Technical Specifications (TS) in response to your application dated January 7,1997, as supplemented July 2,1997. The amendments revised the TS associated with manually actuating every safety relief valve (SRV) during each unit startup from a refueling outage.
l Subsequently, by 19tter dated October 1,1997, you stated that the TS pages issued with l
Amendments 208 and 150 did not contain the revised SRV setpoints approved by Amendments 204 and 145 issued on March 21,1997. Accordingly, TS pages 3.4 8 and 3.5-8 for Unit 1 and pages 3.4 8 and 3.5-5 for Unit 2 have been corrected to reflect the revised SRV setpoints.
Please replace the current TS pages with the enclosed corrected TS pages 3.4-8 and 3.5-6 for Unit 1 and pages 3.4 8 and 3.5 5 for Unit 2.
Sincerely, ORIGINAL *.MNED BY:
Ngoc B. (Tommy) Le, Project Manager Project Directorate 112 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50 321 and 50 366 DISTRIBUTION Docket F#es WBeckner, TSB
Enclosures:
PUBLIC OGC h'
As stated PDll 2 RF ACRS BBoger 14Berkow cc w/ encl: See next page JJohnson,Rll PSkinner,Rll LBerry DTerco NLe GHammer k
GHill (4)
\\
To eceive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE PM:PDil-2,
LA:PDil-2 N
(', D:PDll h,g)
NAME
. NLE:cn P LBERRY lyh HBERKOR /
DATE ol'J /97
/()/6 /07
\\
}c / L /977 JOCUMENT NAME: G:\\ HATCH \\M97702.COR OFFICIAL RE 0RD COPY 9710000255 971006
-PDR ADOCK 05000321 P
PDR 11llOllllllll,11jlll,Ili I g g gg gf
. # "84 g\\
y UNITO STATES u
P; NUCLEAR REGULATORY COMMIS810N WASHINGTON. c.c. 2000He01 October 6, 1997 Mr. H. L. Sumner, Jr.
Vice President - Nuclear i
Hatch Project Southem Nuclear Operating Company, Inc.
Post Omco Box 1295 1
Birmingham, Alabama 352011295
SUBJECT:
CORRECTED TECHNICAL SPECIFICATIONS PAGES EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 (TAC NOS M97702 AND M97703)
Dear Mr. Sumner:
On September 5,1997, ti,4 Commission issued Amendment No. 208 to Facility Operating License No. DPR 57 and Amendment No.150 to Facility Operating License No. NPF.5 for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2, Tcchnical Specifications (TS) in response to your application dated January 7,1997, as supplemented July 2,1997. The amendments revised the TS associated with manually actuating every safety relief valve (SRV) during each unit startup from a refueling outage.
Subsequently, by letter dated October 1,1997, you stated that the TS pages issued with Amendments 208 and 150 did not contain N revised SRV setpoints approved by Amendments 204 and 145 issued on March 21,1997. Accordingly, TS pages 3.4 8 and 3.54 for Unit 1 and pages 3.44 and 3.5 5 for Unit 2 have been corrected to reflect the revised SRV setpoints.
Please replace the current TS pages with the enclosed corrected TS pages 3.4-8 and 3.54 for Unit 1 and pages 3.44 and 3.5-5 for Unit 2.
Sincerely,
%AL Ngoc B. (Tommy) Le, Project Manager Project Directorate 112 Division of Reactor Projects - 1/II Office of Nucleer Reactor Regulation Docket Nos. 50 321 and 50-366
Enclosures:
As stated cc w/ encl: See next page
~ -
Edwin 1. Hatch Nuclear Plant Cc:
Mr. Emest L Blake, Jr.
Charles A. Patrizia Esquire i
Shaw, Pittman, Potts Paul, Hastings, Janofsky & Walker and Trowbridge 10th Floor 2300 N Street, NW.
1299 Pennsylvania Avenue Washington, DC 20037 Washington, DC 20004 9500 Mr. D. M. Crowe Chairman Manager, Licensing Appling County Commissioners Southem Nuclear Operat:ng County Courthouse Company, Inc.
Baxley, Georgia 31513 P. O. Box 1295 Birmingham, Alabama 352011295 Mr. W. G. Harriston,111 President and Chief Executive Resident inspector Officer Plant Hatch Southem Nuclear Operating 11030 Hatch Parkway N.
Company, Inc.
Baxley, Georgia 31531 P. O. Box 1295 Birmingham, Alabama 35201-1295 Regional Administrator, Region ll U.S. Nuclear Regulatory Commisolon Mr. J D. Woodard Atlanta Federal Center Executive Vice President 61 Forsyth Street, SW, Suite 23T85 Southem Nuclear Operating Atlanta, Georgia 30303 Company, Inc.
P. O. Box 1295 Mr. Charles H. Badger Birmingham, Alabama 35201-1295 Office of Planning and Budget Room 610 Mr. P. W. Wells 270 Washington Street, SW.
General Manager, Edwin 1. Hatch Atlanta, Georgia 30334 Nuclear Plant
. Southem Nuclear Operating Harold Rebels, Director Company, Inc.
Department of Natural Resources P. O. Box 439 205 Butler Street, SE., Suite 1252 Baxley, Georgia 31513 Atlanta, Georgia 30334 Mr. R. D. Barker Steven M. Jackson Program Manager Senior Engineer Power Supply Fossil & Nuclear Operations Municipal Electric Authority Oglethorpe Power Corporation of Georgia 2100 East Exchange Place 1470 Riveredge Parkway, NW P. O. Box 1349 Atlanta, Georgia 30328-4684 Tucker, Georgia 30085-1349