ML20211J539

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-400/OL-86-03 of Exams Administered on 860923-26
ML20211J539
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/05/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20211J543 List:
References
NUDOCS 8611110159
Download: ML20211J539 (2)


Text

_ __ . . _ . -. -

1,-

a November 5, 1986 Docket No. 50-400

' Carolina Power and Light Company ATTN: Mr.-E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEARON HARRIS ~ EXAMINATION REPORT 400/0L-86-03 The NRC administered sim' u lator examinations on September 23-26, 1986, to employees of your company licensed to operate the Shearon ' Harris reactor.

At the conclusion of the site _ visit, preliminary findings on these examinations were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosure

will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by H. C. Dance, for)

David M. Verrelli, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosure:

Exam Report 50-400/0L-86-03 cc w/ encl:

A. W. Powell, Director, Training J. L. Willis, Plant Manager C. Olexik, Training Director bec w/ encl: (see page 2) '

l 8611110159 861105 l PDR ADOCK 05000400 l V PDR 1

a Carolina Power and Light Company 2 November 5, 1986 bcc w/ encl:

Project Manager, NRR State of North Carolina Senior Resident Inspector Operator Licensing Branch, DHFT:NRR Document Control Desk RII RII RII RI RII CA(c)asto:ht

^ f6 CA(Ju 'ian ff#/

PFrederickson VP ciera 10/7I86 [JFMGnro 10/11/86 /86 -10/, /00 40/--f86

\\ ] I() W YEG l 1l$b