OPERATING DATA REPORT DOCKET NO.
50 244 DATE Apeil 11. 1386 COMPLETED BY N
[ M /[ b
" Andre'w E. Md [mdfa TELEPHONE 315-524-4446 Ext. 301 OPERATING STATUS Ginna Station
- 1. Unit Name:
R.E. GINNA NUCLEAR POWER PLANT Notes The annual refueling
- 2. Reporting Period:
March 1986 and maintenance outage 1520 ended on 3/22 @ 1130.
- 3. Licensed Thermal Power (ME ):
490 Reactor power level
- 4. Nameplate Rating (Gross MTe):
470 reached 100% on 3/27.
A
- 5. Design Electrical Rating (Net MWe):
power reduction to approx 490
- 6. Maximum Dependable Capacity (Gross MTe):
}nta, g red on 3/q8, 0% o 470 nn nagn
- 7. Maximum Dependable Capacity (Net MTe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Thich Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative 744 2,160.00_
143.280.00 II. Ilours In Reporting Period
- 12. Number of flours Reactor Tas Critical 257.75 1,169.75 109.456.92 0
0 1.687.55*
- 13. Reactor Reserve Shutdown flours 228.5 1.140.50 107.165.13
- 14. Ilours Generator On.Line 0
0 8.5*
- 15. Unit Reserve Shutdown flours 280.056 1.535,184 149.257.809
- 16. Gross Thermal Energy Generated (MTil)
- 17. Gross Electrical Energy Genersted (MTil) 93,289 513,577 48.806.433
- 18. Net Electrical Energy Generated (MWil) 88.011 486.181 46.289.428
- 19. Unit Service Factor 30.71%
52.80%
74.79%
l 30.71%
52.80%
74.80%
- 20. Unit Availability Factor 25.17%
47.9%
70.32%
- 21. Unit Capacity Factor (Using MDC Net) 25.17%
47.9%
70.32%
- 22. Unit Capacity Factor (Using DER Net) 0%
0%
7.26
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION TEY
- Cummulative total commencing January 1, 1975 8606230009 860331 PDR ADOCK 05000244 R
. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Aerib 11. 198 6_
m COMPLETED BY
[M ME/ #~
Andrew E. 4chamaba TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH March. 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
17.
2.
18.
i 3.
19.
)
4.
20.
i 5.
21.
6.
22.
67 7.
23.
154 8.
24.
292 9.
25.
409 10.
26.
448 11.
27.
488 12.
28.
392 13.
29.
483 14.
30.
489 15.
31.
491 16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
IHX KliT NO.
50-244 IINITNAME
_.E GINNA NUCLEAR PO_WER PLANT, R
1 UNIT SHUTDOWN AND POWER REDUCTIONS DATE r,i 1986 _
COMPLI{TED llY Andrew E.
mara REPORT MONTII MARCli 1986
.I El/t.:PiiONE 315-524-4446 Ext. 301 Ginna Station n
.3 m
e Eq o
Licensee e,
gm Couse & Corrective e
e u iE 2
1,2: E Event g, -3 Action to No.
Date g$
,E id$
Report #
!0 Prevent Recurrence 5
2 g
u O
Ol*
3/28/86 1
7.25 A
CH PIPEXX Reactor power level reduction to approx. 50% due to a leak in 1B Main Feedwater Pump suction relief piping.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) u nev. 4/es 4,-a, Il-Other (Explain)
Exhibis 1 - Same Source
. NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Anr-ti 11. 1986_
COMPLETED BY / h f / h 4'/-
j~
" " Andrew E. Mcffainara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH March, 1986 The annual refueling and maintenance outage ended with unit startup on 3/22/86 0 1130, after an outage duration of 1,019.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> (42.48 days).
After low power physics testing was completed the reactor power level was escalated, reaching 100% on 3/27.
On 3/28 the reactor power level was reduced to - 50% due to a leak in the 1B Main Feedwater Pump suction relief valve piping.
The reactor power level was returned to 100% after the necessary repairs were completed and remained there through the end of the report period.
GINNA STATION MAINTENANCE REPORT
SUMMARY
MARCH, 1986 During the month of March, routine maintenance and inspections were completed.
Major safety related work included:
1.
"A" and "B" Containment Spray Pumps - P.M. Inspection (installed new rotating assembly in "B" pump) 2.
"A" and "B" Reactor Coolant Pumps Oil Change i
3.
"A" Reactor Coolant Pump Vent Louver Unit - replaced 4.
Turbine Driven Aux. Feedwater Pump - P.M.
Inspection 5.
"B" Safety Injection Pump - P.M. Inspection 6.
MOV-4007 Limitorque Mechanical Inspection 7.
Personnel and Equipment Air Lock - P.M. Inspection 8.
"A" M.G.. Set - P.M. Inspection 1
9.
"B" Diesel Generator Annual Inspection 10.
Check Valve 3998 and Valve 5250 were inspected 11.
Check Valve 847B - Seal Weld Repair 12.
Snubbers SG-B-1, SG-B-2, and SG-B-5 were overhauled and tested 4
13.
Relief Valves RV-755A, RV-755B, RV-758A, RV-759B, RV-744, RV-887, RV-4022, RV-4020, RV-4653, RV-9709A, and RV-9709B were inspected and tested 14.
CV Recirc Fan Cooler Drain Plugs were inspected a
c
-r-.
, _ ~ _ _
O e
R ~;_
j y
N o..
ox s - "'"-
ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649 nosr-o%r am.coetno 546 2700 GINNA STATION April 11, 1986 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for March, 1986 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of March, 1986.
Very truly yours, b
Stanle M. Spector Superintendent of Ginna Production SMS/eeg Attachments cc:
Dr. Thomas E. Murley NRC (1)
E' 3y