ML20211F752
| ML20211F752 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/22/1986 |
| From: | Wenzinger E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Harrison R PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| Shared Package | |
| ML20211F757 | List: |
| References | |
| NUDOCS 8610310249 | |
| Download: ML20211F752 (2) | |
See also: IR 05000443/1986046
Text
Tj w
~
t
.
00T 221986
Docket No.
50-443
Public Service Company of New Hampshire
ATTN:
Mr. Robert J. Harrison
President and Chief Executive Officer
P. O. Box 330
Manchester, New Hampshire
03105
Gentlemen:
Subject:
Inspection No. 50-443/86-46
This refers to the routine safety inspection conducted by Mr. A. Cerne and other
inspectors of this office on July 8 - September 15, 1986 of activities authorized
by NRC Construction Permit No. CPPR-135 and to the discussions of our findings held
by Mr. Cerne with Messrs. Mcdonald, Warnock, and others of your staff at the con-
clusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter.
Within these areas, the inspection
consisted of selective examinations of procedures and representative records, in-
terviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General Statement of Policy
and Procedure for NRC Enforcement Actions", 10CFR Part 2, Appendix C (Enforcement
Policy 1986).
You are required to respond to this letter and in preparing your
response, you should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
Sincerely,
0EL81331 SLgned Bvs
Edward C. Wenzinger, Chief
Projects Branch No.3
Division of Reactor Projects
hk
G
1
0
D
.
.
.
.
Public Service of New Hampshire
2
22 M
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report No. 50-443/86-46
cc w/encls:
William B. Derrickson, Senior Vice Presidsnt
John DeVincentis, Director of Engineering
Warren Hall, Regulatory Services Manager
Donald E. Moody, Station Manager
Gerald P. Mcdonald, Construction QA Manager
Public Document Room (PDR)
Lucal Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Hampshire
bec w/encls:
Region I Docket Room (with concurrences)
hanagement Assistant, DRMA (w/o encls)
DRP Section Chief
R. Temps, Reactor Engineer / Examiner
W. Lazarus, Chief, EPS
(
p\\+"
,0
p
e
o
RI.y
RI
Ce'r
meo
Els'asser
noe
10 16/86
lo[1/fL
/0 p
\\
/
2
'
0FFICIAL RECORD COPY