ML20211F686

From kanterella
Jump to navigation Jump to search
Forwards Appraisal Followup Insp Repts 50-456/86-55 & 50-457/86-42 on 861007-08 & 14.No Violations Noted
ML20211F686
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/24/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211F691 List:
References
NUDOCS 8610310228
Download: ML20211F686 (2)


See also: IR 05000456/1986055

Text

p

s

OCT 24 G86

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 606S0

Gentlemen:

This refers to the appraisal followup inspection conducted by Mr. T. Ploski and

others of this office on October 7-8 and 14, 1986, of activities at Braidwood

Nuclear Generating Station, Units 1 and 2, authorized by NRC Construction

Permit Nos. CPPR-132 and No. CPPR-133, and to the discussion of our findings

with Messrs. E. Fitzpatrick and L. Davis and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original cicnv2 by 7. Snell"

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

/

Enclosure:

Inspection Reports

,

No. 50-456/86055(DRSS); and

No. 50-457/86042(DRSS)

h

i (\\

See Attached Distribution

l

RIII

RIII

wc5 /~

W6k

RIII [

v CI A

uns /~

p

wG h

RIII

RIII

RIII

RI N

RIII

Ploski/ls Allen

Patferson Smith

WilliamsenSnelT

Littl

Shafer

ye

W

gna

f

w/d

8610310228 861024

-

PDR

ADOCK 05000456

l

G

PDR

L

T

"

'

,

OCT 2,41986.

Commonwealth Edison Company

2

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

D. Matthews, EPB, OIE

W. Weaver, FEMA, RV