DJITRIBUTION Docket No. 50-344 June 9, 1986 wocket File NRC PDR L PDR PAD #3 Rdg Mr. Bart D. Withers H. Thompson Vice President Nuclear OELD Portland General Electric Company E. Jordan 121 S.W. Salmon Street B. Grimes Portland, Oregon 97204 J. Partlow N. Thompso-n
Dear Mr. Withers:
ACRS 10 Gray File T. Chan C. Vogan
SUBJECT:
AUTHORIZATION OF TECHNICAL SPECIFICATION CHANGE FOR TROJAN NUCLEAR PLANT This confirms our telephone authorization given on June 8, 1986 for a change in the Technical Specifications for the Trojan Nuclear Plant as requested by telephone conversation with T. Chan on June 7,1986, as confirmed in your letter dated June 9, 1986. This letter also confirms our discussion with Mr. Orser of your staff that Trojan will perform and meet the surveillance test requirements of the proposed changes to Trojan Technical Specification 4.6.2.2d regarding the Spray Additive System prior to criticality. Facility Operating License NPF-1 is hereby amended by changing the Technical Specifications (copy enclosed) as requested in your June 9,1986 letter.
Copies of the license amendments and our Safety Evaluation for these Technical Specification changes will be sent to you when processed.
Steven A. Varga, Director PWR Project Directorate No. 3 Division of PWR Licensing-A, NRR
Enclosure:
As stated cc w/ enclosure:
See next page
/2 0FG : PAD #3
- PAD #3
- D/ PAD #
NAME :CVogan
- TChan/ps at
{/86 DATE :6/ /86
- 6/g/86 OFFICIAL RECORD COPY MbOON
^
00 4
P
r I.
L
.y Mr. Bart D. Withers i
Portland General Eletric Company Trojan Nuclear Plant cc:
Senior Resident Inspector U.S. Nuclear Regulatory Comission
}
Trojan Nuclear Plant e
Post Office Box 0 i
Rainier, Oregon 97048 k
Robert M. Hunt, Chairman Board of County Comissioners Columbia County t
St. Helens, Oregon 97501 William T. Dixon Oregon Department of Energy
[
Labor and Industries Building Room 111 k
Salem, Oregon 97310 I- '
Regional Administrator, Region V U.S. Nuclear Regulatory Comission
['.
Office of Executive Director for Operations 1450 Maria Lane, Suite 210 Walnut Creek, California 94596 r
w k
F y
l I
i
%a
\\
F j
L r
h LCA 143 Page 1 of 2 CONTAINHENT SYSTEMS SPRAY ADDITIVE SYSTEM LfMITING CONDITION FOR OPERATION 3.6.2.2 The spray additive system shall be CPERABLE with:
A spray additive tank containing at least 3000 gallons of not s.
less than 30 percent by weight WaOH solutien, and
.b.
Two spray additive eductors each capable of adding NaOH solution from the chemical additive tank to a containment spray system pump flow.
APPLICABILITY: MODES 1, 2, 3 and 4.
).EIl93:
L With the spray additive system inoperable, restore the system to OPERABLE i [
status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />;
[
restore the spray additive system to OPERABLE status within the next 49 hours5.671296e-4 days <br />0.0136 hours <br />8.101852e-5 weeks <br />1.86445e-5 months <br /> or be in COLD SHUTDOWN within the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVElllANCE REQUIREMENTS a.6.2.2 The spray additive system shall be demonstrated OPERA 8LE:
At least once per 31 days by verifying that each valve a.
t.
b (manual, power operated or automatic) in the flow path that is not locked, sealed, or otherwise secured in
{
position, is in its correct position.
~
- b. At least once per 6 months by:
a-t 1.
f.
Verifying the solution level in the tank, and a
2.
Verifying the concentration of the NaOH solution by chemical analysis.
At least once per 18 months, during shutdown, by verifying c.
that each automatic valve in the flow path actuates to its correct position on a containment spray test signal.
d.
At least once per 5 years by verifying a water flow rate of 3713 gpm from the spray additive tank to each containment '
spray system with the spray pumo coerating in the recirculation mode through the test line.
~
TROJAN-UNIT 1 3/4 6-12 A