ML20211D702

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-373/86-15 & 50-374/86-16 on 860414-21 & Notice of Violation.Enforcement Options Being Evaluated of Actions of Unit 1 Nuclear Station Operator
ML20211D702
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 06/06/1986
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211D706 List:
References
NUDOCS 8606130133
Download: ML20211D702 (2)


See also: IR 05000373/1986015

Text

,

_-

_-

.

.

JUN 0 61986

Docket No. 50-373

Docket No. 50-374

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Messrs. R. Hasse,

R. Lanksbury, S. Hare, and M. Jordan of this office on April 14-21, 1986, of

activities at your LaSalle County Station, Units 1 and 2, authorized by NRC

Operating License Nos. NPF-11 and NPF-18, and to the discussion of our findings

with Mr. G. Diederich and others of your staff at the conclusion of the

inspection. This also refers to the enforcement conference held in our office

as a result of these findings on May 12, 1986.

This special inspection of your licensed activities was conducted as a result

of your reporting the personnel errors involved in the hanging of an out of

service tag for the Unit 1 High Pressure Core Spray Suppression Pool Full Flow

Test Valve which occurred on March 19, 1986. The inspection consisted of a

selective examination of procedures and representative records, observations,

and interviews with personnel.

Based on the results of this special inspection, it appears that certain of

your activities were in violation of NRC requirements, as specified in the

~

enclosed Notice of Violation. A written response is required.

With regards to the actions of the Unit 1 Nuclear Station Operator, we are

evaluating enforcement options, and you will be notified in subsequent

correspondence as to the resolution of this issue.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

8606130133 860606

ADOCKOSOOg3

ppR

0

\\~

Feo/

.

.

.

2

Comonwealth Edison Company.

JUN 0 6 !S36

,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

CRICI!E Eli3 C

'

'

Carl J. Paperiello, Director

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

2.

Inspection Reports

No.50-373/86015(DRS);

No.50-374/86016(DRS)

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

G. J. Diederich, Plant Manager

R. Crawford, Plant Training

Manager

DCS/RS8(RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

RIII

RIII

RIII

RIII

RI I

RMII

RIII

N

hW

'N

R&}p

Q

M

Hehl't-

Hasse/ma

Hare

Lanksbury

P

llips Jordan

rJght

&[b'/

e/y

Vf

RIII

RIII

RI!!

13

/

B

on

Tambling

Papp ello

t- slo

elsen

c

99