ML20211D702
| ML20211D702 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 06/06/1986 |
| From: | Paperiello C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20211D706 | List: |
| References | |
| NUDOCS 8606130133 | |
| Download: ML20211D702 (2) | |
See also: IR 05000373/1986015
Text
,
_-
_-
.
.
JUN 0 61986
Docket No. 50-373
Docket No. 50-374
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Messrs. R. Hasse,
R. Lanksbury, S. Hare, and M. Jordan of this office on April 14-21, 1986, of
activities at your LaSalle County Station, Units 1 and 2, authorized by NRC
Operating License Nos. NPF-11 and NPF-18, and to the discussion of our findings
with Mr. G. Diederich and others of your staff at the conclusion of the
inspection. This also refers to the enforcement conference held in our office
as a result of these findings on May 12, 1986.
This special inspection of your licensed activities was conducted as a result
of your reporting the personnel errors involved in the hanging of an out of
service tag for the Unit 1 High Pressure Core Spray Suppression Pool Full Flow
Test Valve which occurred on March 19, 1986. The inspection consisted of a
selective examination of procedures and representative records, observations,
and interviews with personnel.
Based on the results of this special inspection, it appears that certain of
your activities were in violation of NRC requirements, as specified in the
~
enclosed Notice of Violation. A written response is required.
With regards to the actions of the Unit 1 Nuclear Station Operator, we are
evaluating enforcement options, and you will be notified in subsequent
correspondence as to the resolution of this issue.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
8606130133 860606
ADOCKOSOOg3
ppR
0
\\~
- Feo/
.
.
.
2
Comonwealth Edison Company.
JUN 0 6 !S36
,
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
CRICI!E Eli3 C
'
'
Carl J. Paperiello, Director
Division of Reactor Safety
Enclosures:
1.
2.
Inspection Reports
No.50-373/86015(DRS);
No.50-374/86016(DRS)
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
G. J. Diederich, Plant Manager
R. Crawford, Plant Training
Manager
DCS/RS8(RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
RIII
RIII
RIII
RIII
RI I
RMII
RIII
N
hW
'N
R&}p
Q
M
Hehl't-
Hasse/ma
Hare
Lanksbury
P
llips Jordan
rJght
&[b'/
e/y
Vf
RIII
RIII
RI!!
13
/
B
on
Tambling
Papp ello
t- slo
elsen
c
99