Text

, Procedure and Form Change Request

$ (Sheet 1 of 1) .

y-.ym-vy- - _ mm m.w q

y w.

- >NS ec_tio_n- 1:[Ch.mw-

- . - ange:Initiatio"n_

g- , Tin. forma.tio~nVM&,wwy -~ aan a

Document No.: /

vo SNU Revision No.: - Change No.:  !

Title:

ra b a b el' d b 'arw d b ee W- ~

IE ~ ~

Initiated By: -

e rntrA fonefime l

change?%SNO on,.m O,%,n9,, j expvanon das, or condmon Reason: Expiration Date or correct -m JMuneaf reSmic&  :  :

U.em yed Date , ,, ,,j Type of Change:

Intentg Non-Intent 0

- . - - . - . _ - . _ - , - - , . . _ . , . _ , ._n m a JSection 2:ilnstructions

-a .au.~ -..~aan ~nteringfor.E w. Ch_

. . uant,s a e=a:- f H. 3.9 ch e + aW h ascGed 4--sd 1 9%

Pc s /2 .w id) cvC W )j Y 4 94. ~

. >.~ v.w n .,s w q

t ,Section 3?&No w-n, n-IntentiCt

~. niang.w.mvn,, e .. . finterlm r

.ARp_ro_valf. dj

.~

Se.ction 3a: Approved by SORC or PORC Member or First Line Supervisor

. Signature:..........................................D.at.e: . ...... -

' ^

.Section 3b: Approved by Shift Manager or SRO Licensed on Unit Verified Revision _6pg Signature: Date: , '- alm- Date Z'M2 mmnmnnm gg b "". , ^*'^"N,,

vnnwm~MRevioWM,n.

A!Section 4 =wen,-wn" c u'a 2N unn

  • 7 V'N mana.m'A g a VI a la Uli1 m",1U11 VITy'"th

,1 QA Reviewer Signature: (ifrequired), Date: '

RAB Reviewer Signature:(ifrequired) ^ Date:

Independent Reviewer Signature:

. m. , .

Ad .w .

Date: 6 I 47 1

& Safety Evaluation Required? YES O NO I/'Uh"9" *"0

    • - answered 'YES,.PORCor

& Environmental Review Required? YES NO SORCreview h re ired.

Procedure Screener Signature:

-ow_. a -,mm-KIE f Date: d~ # #

yw.. Sectio

.u-.em,5:lReview n:

- .uu-- .

and<ApprovaIKgge.""M

. . . e amu- eA i 1 s PORC or SORC Review Required 7 YES Q. NO O Department Head or Responsible Individual Date: b. $ ' T 7 Signature: (co=non ocpuunent Procedures require each affected Date:

Department Head's signatures) '

Date:

gnmmy-rmp=mn.mm.pnggm, q~Section"6:JP_

--- .OR_C _or S_O.RClAppr.o_

~

sm -val!(if.? required)auP 4.m b eeting No: ~3 - 9 74/k POR scSCRE Approval Date:

=jj'qjn7 c -

airperson Signature: p., ,

f , ,

DC 1 Attachment 6 Effective Date: $[/2[9 7 #

~ if h W' M'ea Rev. 5

/ / - 78 of 82 9709260236 970918 PDR ADOCK 05000423 -

P PDR

5

  • /

qj alli,1, STONE NUCLEAlt POWElt STATION MAINTENANCE PltOCEDUltE l

Containment Penetration Overcurrent Device Surveillance Testing for Load Center, MCC, and Molded Case Breakers 1

- SP 3712T .

3

Rev. 6 S i

2 dTOP" HINK kCT#' EVfEW a +

x;;q i

i  !

i Approval: 1 i

i

/ '

  1. ///h7 PORC Mtg. No: 3 '77- Ofr/ e:

//

Effective Date: 4///['77

/ /

l Level of Use Subject Matter Expert:

General N. Lizcc

4 Millstone Unit 3 g, Maintenance Procedure Containment Penetration Overcurrent Device Surveillance Testing for Load Center, MCC, and Molded Case Breakers TABLE OF CONTENTS

1. PURPOSE.....................................................2
2. P R E R EQ U I S ITES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1
3. P R E CAUTI O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4. I N ST R U CTI O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 4.1 Load Center Breaker Overcurrent Test . . . . . . . . . . . . . . . . . . . . . . . 5 4.2 Gould MCC Starter Overcurrent Test . . , . . . . . . . . . . . . . . . . . . . . . 8 4.3 Molded Case Breaker Overcurrent Test . . . . . . . . . . . . . . . . . . . . . . 11
5. REVIEW AN D SIGNOFF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
6. R E F E R E N CES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
7. S U M M A RY O F C H AN G ES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 ATTACHMENTS AND FORMS Attachment 1, " Load Center Breaker Trip Times" . . . . . . . . . . . . . . . . . . . 16 l

- AtIachment 2, "Gould Ampcap Trip Coil Acceptance Criteria" . . . . . . . . 17 Attachment 3, "Gould Heater 300% Overload Current Tables" . . . . . . . . 18 Attachment 4 " Molded Case Breaker Acceptance Criteria" . . . . . . . . . . 21 Maint. Form 3712T-1," Containment Penetration Conductor Overcurrent Protection Device Surveillance Test" Maint. Form 3712T-3," Load Center Breaker Containment l Penetration Surveillance Test Data Shect" Maint. Form 3712T-4,"Gould Ampeap MCC Containment Penetration l Surveillance Test Data Shect" Maint. Form 3712T-5," Molded Case Breaker Containment Penetration l Surveillance Test Data Shect" SP 3712T Level of Use .

STOP' -' TH!NK .~ACT REVIEW Rev. 6 General 1of21

4 1. PURPOSli l.1 Objective This procedure satisfies Technical Specification Surveillance 4.8.4.1.a.2 for overcurrent testing of the following containment penetration overcurrent protection devices:

Load center breakers l

Gould Ampcap MCC starters j

  • Molded case breakers 1.2 Discussion Surveillance requirement 4.8.4.1.a.2 requires that 10% of each type of penetration conductor overcurrent protective devices below 4KV be functionally tested every 18 months. The function of the penetration conductor overcurrent protective device is to open the circuit on an overcurrent condition. Operability is proven by injecting overcurrent levels into the protective device and ensuring it trips within its required time band.

Satisfactory completion of section 4.1, meets the requirement for load center breakers.

Satisfactory completion of section 4.2, meets the requirement for Gould Ampeap MCC Starter.

Satisfactory completion of section 4.3, meets the requirement for molded case breakers.

For each circuit breaker found inoperable during these functional tests, an additional 10% of all the circuit breakers of the inoperable type shall also be tested until no more failurcs are found or all circuit breakers of that type have been tested.[+ LER 97-004-00]

This procedure should be performed prior to performing Urcaker PMs (SP 3712TA and SP 3712TB). Performing the PM first would precondition the breaker.

Instructions on operating the test equipment may be found in its operating instruction manual or in the MP 3787 series procedures. This procedure overrides any conflicts found between it and the operating instruction manual or the MP 3787 series procedure.

SP 3712T Level of Use STOP THiNK ACT REVIEV[ Rev.6 General 20f21

  • 1.3 - Applicability gi "

This procedure applies to all circuit breakers described in Tecn:. cal Specifications, Millstone Nuclear Power Station, Unit No. 3, OPS Form 3273 - 3/4.3.8.4.1," Containment Penetration Conductor Overcurrent Protective Devices." This surveillance applies in modes 1,2, 3, and 4, 1.4 Frequency A minimum of 10% of each type of breaker below 4KV shall be functionally tested at least once every 18 months. Circuit breakers selected for functional testing shall be selected on a rotating basis.

2. PREREOUISITES 2.1- General 2.1.1 Surveillance cover sheet has been authorized by SM/US for surveillance testing to begin.

2.2 _ Documents f 2.2.1 Specification SP-EE-321 l 2.3 Measuring and Test Equipment ,

2.3.1 DMM, one of the following or as directed by FLS:

Fluke Model 8060A

  • Fluke Model 8050A
  • Fluke Model 27 2.3.2 High current test source, one of the following or as directed by FLS:
  • - Multi- Amp Model CD-8130 Multi- Amp Model 832
  • Hipotronics Model 9050 2.3.3 Wahl Heat Prober Termocouple Thermometer, Model 2500MVX '

or as directed by FLS SP 3712T Level of Use . . . . . -

-THINK -ACT -REVIEW Rev. 6 bened STOP ~-

3 0f 21

4 s

i  : ;

! 2.4 I)efinitions

.;a!. i l 2.4.1 FLS - First Line Supervisor i

! 3. P9ECAUTIONS 3.1 During testing, very high currents are generated. Although the voltage is l low, a dangerous amount of power could be passing through the '

conductors. Do not break any test connections while a test is in progress.

i l

F I

l Level of Use _

SP 3712T ST P TH!NK ACT- REVIEW Rev 6 General 4 of 21

4

4. INSTRUCTIONS 4.1 Load Center Breaker Overcurrent Test j 4.1.1 Refer To Specification SP-EE-321 and Attachment I and COhiPLETE page 1 of hiaint. Form 3712T-3.

I 4.1.2 PERFORhi instantaneous trip test as follows:

I

a. CONNECT one phase of load center breaker to a high current test sourec.

l

b. ENSURE breaker is closed,
c. Starting at a current level below minimum instantaneous pick-up value, PERFORM following: 1 NOTE Spurious trips may be minimized by maintaining the test time close to 0.10 seconds.
1) APPLY current to one phase of breaker for a minimum l of 0.10 seconds.
2) E breaker has exceeded its acceptable trip current value AND did not trip, STOP test and CONSULT FLS.
3) E breaker did not trip, INCREASE current value and Go To step 4.1.2.c.1).

) 4) E breaker tripped AND time was greater than

(- 0.10 seconds, Go To 4.1.2.c.1).

5) E breaker tripped, RECORD trip current and time on Maint. Form 3712T-3.
d. E trip current DR time does not meet acceptance criteria, CONSULT FLS.
c. REPEAT step 4.1.2 until all phases have been tested.

SP 3712T

- Level of Use num General S* "k . ^cr R v.6 5 of 21

,,r.- . , . . - - . . , . , ,

  • y s -

.l- --4.1.3 - PERFORM short time delay test as follows:

<v

a. CONNECT one phase of load center breaker to a high -

current test source,

b. ENSURE breaker is closed.
c. APPLY specified test current to one phase of breaker.

l d. E breaker has exceeded its acceptable trip time ANQ did imt trip, STOP test and CONSULT FIA l-

c. WHEN breaker trips, RECORD trip time on Maint. Form 3712T-3.

l- ,

[ f. E trip time does not meet acceptance criteria, CONSULT l FLS.

g. REPEAT step 4.1.3 until all phases have been tested.

t 4.1.4 PERFORM long time delay test as follows:

._.: a. CONNECT one phase of load center breaker to a high current test source,

b. ENSURE breaker is closed.
c. APPLY specified test current to one phase of breaker.
d. E breaker has exceeded its acceptable trip time AND did not trip, STOP test and CONSULT FLS.

I c. WHEN breaker trips, RECORD trip time on Maint. Form 3712T-3.

f. E trip time does not meet acceptance criteria, CONSULT FLS.
g. REPEAT step 4.1.4 until all phases have been tested.

4.1.5 E any data exceeded acceptance criteria, NOTIFY FLS:

lFLS l a. INITIATE a CR.

Level of Use .. -

SP 3712T STOP ' THiNK ' -ACT REViEv/ Rev. 6 General s

6 of 21 c

i i

  • I i
b. CONSULT work planning to schedule surveillance to bc

. ;i performed on an additional 10% sample of all the breakers of the inoperable type for each breaker found inoperable.

[+ LER 97-004-00]

j 4.1.6 RECORD date testing completed on Maint. Form 3712T-1.

i 4

1 1

I l l 1

Level of Use - SP 37.12T ST P THiNK ACT REAEW Rev. 6 General 7 of 21

4.2 - Gould MCC Starter Overcurrent Test

.?:

4.2.1 Refer To Attachment 2 and DETERMINE acceptance criteria for instantaneous overload test and RECORD on page 1 of Maint Form 3712T-4. ,

4.2.2 ENSURE breaker test area temperature is 72 to 82*F.

4.2.3 MEASURE and RECORD breaker test area air temperature on '

Maint. Form 3712T-4.

4.2.4 Wi-IEN starter has been in breaker test arca for greater than 5 l minutes, PERFORM instantaneous overcurrent test as follows:

l ._.

NOTE L For instantaneous overcurrent testing, current should not be passed l through thermal overload heaters. Heaters may be removed or bypassed l as desired.

! a. CONNECT one phase of breaker to a high current test

,_l source,

b. ENSURE breaker is closed,
c. Starting at a current level below minimum instantaneous trip value, PERFORM following:

NOTE To minimize spurious trips, an attempt should be made to maintain test time as close as possible to 7 cycles,

1) For a minimum of 7 cycles, APPLY current to one phase of breaker,
2) IE breaker has exceeded its acceptable trip current value AND did not trip, STOP test and CONSULT FLS.
3) IE breaker did not trip, INCREASE current value and Go To step 4.2.4.c.1).

Level of Use SP 3712T STOP' TH!NK ~- '-ACT. ' REVIEW Rev.6 General S of 21

p --

o

.. 4) E breaker tripped AND trip time exceeded 7 cycles, Q) REPEAT step 4.2.4.

5)- E breaker tripped AND trip time was 7 cycles or less, RECORD trip current and time on Maint. Form 3712T-4,

d. - E trip current does not meet acceptance criteria, CONSULT FLS.
c. REPEAT step 4.2.4 until all phases have been tested.

4.2.5 E breaker did not meet acceptance criteria, CONNECT in series, ll two phases of breaker to high current test ource.

[+ LER 97-004-00]

a. For a n'inimum of 7 cycles, APPLY current tc Srcaker, b.- E breaker has exceeded its acceptable trip current value AND did not trip, STOP test and CONSULT FLS.
c. E breaker did not trip, INCREASE current value and Go To step 4.2.5.a.
d. E breaker tripped AND trip time exceeded 7 cycles, Go To stcp 4.2.5.a.
c. E breaker tripped AND trip time was 7 cycles or less, RECORD trip current and time on Maint. Form 3712T-4.
f. - CONTINUE testing until all phase combinations have been tested,
g. E trip current and time does not meet acceptance criteria, CONSULT FIS.

4.2.6 PERFORM thermal heater overload test as follows:

a. Refer To Attachment 3 and DETERMINF at current for l thermal heater overload test.
b. RECORD test current for thermal heater overload test on page 2 of Maint. Form 3712T-4.-

SP 3712T Level of Use - -

~

..S1 P . --THINK. . . ACT REVIEW Rev.6 General 9 0f 21

O  % ,

,. :e 1

g - m,.W NOTE

. LThe most common method of testing thermal overloads,la to apply current-l through the contactor and the heaters. This method uses the contactor
dropping out to stop the test. j e-  ;

e .

l

, c, . CONNECT one phase of starter to a high current test sourec.

2 i_ d. APPIX specified test current to one phase of breaker.

i 2 c. IE starter has exceeded its acceptable trip time A.N_Q did not L trip, CONSULT FLS: ,

i f, WHEN starter has tripped, RELJRD trip time on

Maint. Forrn 3712T-4.

[ g. WAIT 5 minutes and REPEAT step 4.2.6 for all phases to be tested.

4.2.7 IE two phase testing.QR thermal overload testing data was not ,
j. .

within acceptance criteria, NOTIFY FLS:

L, l- lFLs l* a. INITIATE a CR.-

i j b. NOTIFY FLS and work planning to schedule surveillance to bc

performed on an additional 10% sample of all the breakers of l- the inoperable type for cach breaker found inoperable, f

. [+ LER 97-004-00].

[ d 4.2.8 RECORD da:e testing completed on Maint, Form 3712T-1.

l- -r

4 SP 3712T

.-Level of Use gemal 'STOP 'THiNK ACT~ ' REVIEW Rev.6

, 10 of 21

r 4.3 Molded Case lireaker OvercurreniTest

.,ge 4.3.1 Refer To Attachment 4 and DETERMINE acceptance criteria for instantancous trip test.

4.3.2- RECORD acceptance criteria for instantaneous trip test on-page 1 of Maint. Form 3712T-5.

4.3.3 ENSURE breaker test area temperature is 72 to 82 F.

4.3A L MEASURE and RECORD breaker test area air temperature on Maint. Form 3712T-5.

4.3.5 WHEN starter has been in breaker test area for greater than 5 minutes, PERFORM instantaneous overcurrent test ns follows:

a. CONNECT one phase of breaker to a high current test sourCc.
b. ENSURE breaker is closed.
c. Starting at a current level below minimum instantaneous trip value, PERFORM following:

NOTE

1. 'lo minimize spurious trips, an attempt should be made to maintain test time as close to 7 cycles as possible.

Excessive pulsing can cause premature trip.

1) For a minimum of 7 cycles, APPIY current to one phase of breaker.
2) E breaker has exceeded its acceptable trip current ulue M did not trip, STOP test and CONSULT FLS.
3) E breaker did not trip, INCREASE current value and

- Go To step 4.3.5.c.1).

4) E breaker tripped M trip time was 7 cycles or less, RECORD trip current and time on Maint. Form 3712T-5.
5) lE breaker tripped M trip time exceeded 7 cycles, Go To stcp 4.3.5.c.1).

Level of Use SP 3712T -

STOP THiNK' Rev. 6 bened LACT ' REVIEW ll of 21 s ;4 .

. .. r .

+

'6);-- E breaker has exceeded its acceptable trip current value_ -

g AND did not trip, STOP test and CONSULT FLS.

I l d, ' REPEAT step 4.3.5 until all phases have been tested.

NOTE l Two pole instantaneous testing is only required for 480V circuit breakers.

4.3.6 - E breaker is used in a 480 V circuit AND a phase did not meet acceptance criteria, PERFORM the following testing:

(+ LER 97-004-00]

a. CONNECT in series, two phases of breaker to high current test source.

l l b. Starting at a current level below minimum instantaneous trip value, PERFORM following:

1) For a minimum of 7 cycles, APPLY current to breaker.

..- 2) E breaker did not trip, INCREASE current value and

. Go To step 4.3.6 b.1).

3) IE breaker tripped AND trip time was 7 cycles or less, RECORD trip current and time on Maint. Form 3712T-5.
4) E breaker tripped AND trip time exceeded 7 cycles, Go To step 4.3.6.b.1).
5) E breaker has exceeded its acceptable trip current value AND did not trip, STOP test and CONSULT FLS.
c. CONTINUE testing until all phase combinations have been tested.
d. IE trip current and time does not meet acceptance criteria, CONSULT FLS.

4.3.7 -- PERFORM time delay overcurrent test as follows:

O f a. Refer To Attachment / and DETERMINE acceptance criteria for time delay overcurrent test.

fh L

SP 3712T Level of Use . <u Rev 6 Genera T{ M.K eACT REVIEW 1 .

b. RECORD acceptance criteria for time delay overcurrent test y on page 2 of Maint. Form 3712T-5.
c. CONNECT one phase of breaker to a high current test source.
d. ENSURE breaker is closed,
c. APPLY specified test current to one phase of breaker.
f. 1E breaker has exceeded its acceptable trip time AND did not trip, STOP test and CONSULT FLS.
g. RECORD trip time on Maint. Form 3712T-5.
h. IE trip time does not meet acceptance criteria, CONSULT FLS.
i. WAIT 5 minutes and REPEAT step 4.3.7 until all phases have been tested.

4.3.8 IE any data exceeded acceptance criteria, NOTIFY FLS:

l FLS f a. INITIATE a CR.

i

b. NOTIFY work planning to schedule surveillance to be performed on an additional 10% sample of all the breakers of the inoperable type for each breaker found inoperabic.

[+ LER 97-004-00]

4.3.9 RECORD date testing completed on Maint. Form 3712T- 1.

Level of Use SP 3712T ST P THINK ACT REVIEW Rev.6 Genera 13 0f 21

5. BEVIEW AND SIGNOFF 5.1 The review and signoff for this procedure is satisfied by the reviews and signoffs of the AWO and completion of appropriate Maint. Form. l
6. REFERENCES 6.1 Technical Specifications, Millstone Nuclear Power Station, Unit No. 3, Section 4.8.4.1.a.2, Containment Penetration Conductor Overcurrent Protective Devices.

6.2 Committment

LER 97-004-00," Lack of Verbatim Compliance with Technical Specification Surveillance" 6.3 Millstone Nuclear Power Station, Unit 3, Final Safety Analysis Report Section 8.3.1.1.4(n), Tests and Inspections (AC Power Systems).

6.4 NRCInformation Notice 96-24 " Preconditioning of Molded-case Circuit Breakers Before Surveillance Testing" 6.5 NEMA AB4-1991," Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers used in Commercial and Industrial Applications" 6.6 OIM 243 'B,"ITE Switchgcar" 6.7 OIM 244-l A, " Motor Control Centers" i 6.8 GE Molded Case Circuit Breakers GET 2779G.

6.9 NUSCO drawing 25212-30111 sheet 1, " Technical Specifications Surveillance Table" (S&W drawing EE-001DA) 6.10 OPS Form 3273 - 3/4.3.8.4.1," Electrical Equipment Protective Devices, Containment Penetration Conductor Overcurrent Protective Devices" 6.11 Memo MP3-TS-95-113," Acceptance Criteria for Breaker Testing" Dated February 21,1995 6.12 Memo MP3-TS-94-599," Load Center Breaker Testing" Dated August 12,1994 6.13 Memo MP3-TS-97-144," Technical Specification Containment Penetration Breaker Testing" Dated April 8,1997 Level of Use SP 3712T ST P TH:NK ACT REVIEV/ Rev.6 General 14 of 21

9

_, 6.14 Specification SP-EE-321 - l Q'))

7.

SUMMARY

OF CIIANGES

- 7.1 - Reworded, rearranged and regrouped steps from previous revision.

7.2 Removed Long and Short pick-up tests.These tests were not required to be performed by tech specs.

7.3 LER 97-004-00 corrective actions required that SP3712T be rewritten to ensure procedure was in verbatim compliance with technical

specifications. The following changes were'made in rev 6

l 1 i

'~

!- 7.3.1 Add requirement to do additional testing to a molded case i breaker or unitized starter if t fails a single pole test. (ACR ,

M3-97-0136) 7.3.2 Added steps to schedule surveillance for an additional 10%

1 sample of breaker of the same type for cach circuit breaker found I

inoperable, 7.4 60 month surveillance requiren ents have been moved to SP 3712TA and SP 3712TB.

7.5 Changed procedure order to take as found data prior to performing preventative maintenance in accordance with NRC Information Notice 96-24," Preconditioning of Molded-Case Circuit Breakers Before Surveillance Testing."

7.6 Containment penetration breakers 3SCA-PNL5N (CKT2) and 3RCP-PNL3A ( -R4B) were listed in Maint. Form 3712T-I twice.

Removed duplicate in this revision, each breaker is only required to be tested once cach 18 months.

SP 3712T Level of Use . .

STOP' -LTH!NK REVIEW Rev. 6 Genera ' LACT '

15 of 21

4 TEST Time Delay in Seconds Long Time Delav Fct SS-3 or SS-4

.at 300% MIN-Overload ~

INT MM 8 - 12 30 60 - 98 ShoitTime Delay For SS-4 at 150% M1N INT MAX Overload --

l- 0.08 - 0.17 0.20 - 0.32 0.35 - 0.50 Attachment i Load Center Breaker Trip Times ..

$g (Sheet 1 of 1)

Level of Use <. ... . . . . . _

SP 3712T Rev.6

~

'STOP.. TH!NK 'ACT REVIEW Oeneml 16 0f 21

I I

TRIP COIL ACCEPTANCE CRITERIA Trip Coil Set Po!nt in Amps Cat, No. LO 2 3 4 5 l

1 HI A10 1.80 -3.37 2.07- 3.87 2.34 - 4.36 2.61 - 4.87 2.82- 5.27 3.04 - 5.68 3.25-6.07 B10 4.12-7.70 4.72- 8.82 5.32 - 9.94 6.00 -11.2 6.45-12.0 6.97-13.0 7.42-13.8 C10 5.92-11.0 6.82-12.7 - 7.65 -14.2 8.55-15.9 9.22-17.2 9.97-18.6 10.5-19.7 D10 11.3 -21.0 13.5 -25.2 13.0-28.0 16.5-30.8 18.0-33.6 19.5-36.4 21.0 -39.2 E10 18.8-35.0 21.8 -40.6 24.0 -44.8 27.0-50.4 29.3- 54.6 31.5-58.8 33.8 - 63.0 F10 24,0-44 8 27.8 - 51.8 30.8-57.4 34.5- 64.4 37.5 -70.0 40.5-75.6 43.5 - 81.2 I G10 30.0-56.0 34.5 - 64.4 39.0 -72.8 43.5 - 81.2 47.3-88.2 51.0 - 95.2 54.0-100 H10 42.8 -79.8 48.8 - 91.8 54.8 -102 61.5 -114 66.8 -124 72.0-134 76.5-142 l J10 76.5-142 88.5 -165 99.0-185 111-207 120-224 129-240 138-257 K10 128-238 147-274- 165-308 185-344 201- 373 216-401 231 -429 L10 219-408 252-470 285- 530 317-590 343-639 369-688 395-736 M10 384-715 442 - 824 496-925 555 -1034 600 -1120 646-1205 690-1288 N10 -512-954 589 -1099 662 -1234 739 -1379 801 - 1493 863-1610 921 -1717 P10 877-1636 1010 -1884 1134 -2115 1267-2364 1372 - 2560 1477-2756 1578-2944

(+40% and -25% included)

Attachment 2 Gould Ampeap Trip Coil Acceptance Criteria P' *- (Sheet I of 1) ,

Level of Use SP 3712T ST P THINK -ACT' REVIEW Rev.6

. Genew 17 of 21 l

_ _ _ . ..m . _ . _ _

- _ -. __ - .. _ - ..__..-.__=_.m-..

e NEMA SIZE STARTER 1 300 % 300%

OVERLOAD OVERLOAD HEATER CURRENTIN HEATER CURRENT IN CATALOG NUM. AMPS CATALOG NUM. AMPS G30T6 1.26 G30T30 13.2 G30T7 1.34 G30T31. 14.8 G30T8 1,43 G30T32A 16.0 ,

G30T9- 1.61 G30T32 17.4 l G30T10 1.78 G30T33 18.9 G30T11 1.97 G30T34 20 G30T12 2.18 G30T35 22 G30T13 2.41 G30T36 24 G30T14 2.65 G30T37 26 G30T15 2.94 G30T37A 30 G30T16 3.24 G30T38 34 G30T17 3.59 G30T39 38 G30T18 3.98 G30T40 42 G30T19 4.39 G30T41 47 G30T20 4.80 G30T42 52 G30T21 5.3 G30T44 59 G30T2:: 5.9 G30T44A 62 G30T23 6.6 G30T45A 73 " '

G30T24 7.2 G30T46A 8 G30T25 8.0 G30T47A 87 G30T26 8.8 G30T48A 93 G30T27 9.8 G30T49A 99 G30T28 10.8 G30T498 106 G30T29 12.0 Attachment 3 Gould Heater 300% Overload Current Tables i (Sheet I of 3)

Level Of Use .. . ..

SP 3712T ST P THINK 1ACT . REVIEW Rev. 6 General 18 0f 21

9 q

NEMA SIZE STARTER 2 300 % 300 %

OVERLOAD OVERLOAD HEATER CURRENT IN HEATER CURRENT IN CATALOG NUM, AMPS CATALOG NUM. AMPS G30T6 1.38 G30T32 19.0 G30T7 1,47 G30T33 21 G30T8 1.57 G30T34 22 G30T9 1.77 G30T35 24 G30T10 1.96 G30T36 26 G30T11 2.17 G30T37 29 G30T12 2.39 G30T37A 33 G30T13 2.65 G30T38 37 G30T14 2.93 G30T39 41 G30T15 3.22 G30T40 4F G30T16 3.58 G30T41 51 G30T17 3.94 G30T42 57 G30118 4.39 G30T44 64 G30T19 4.84 G30T44A 71 G30T20 5.4 G30T45A 80 G30T21 5.9 G30T46A 89 G30T22 6.5 G30T47A 95 ,

G30T23 7.2 G30T48A 102 '

G30T24 8.0 G30T49A 109 G30T25 8.9 G30T498 116 G30T26 9.8 G30T50A 125 G30T27 10.7 G30T51A 133 G30T28 11.9 G30T53A 142 G30T29 13.2 G30T54 153 G30T30 14.6 G30T55 164 G30T31 16.2 G30T56 177 G30T32A 17.6 Attachment 3 Gould Heater 300% Overload Current Tables id$': (Sheet 2 of 3)

Level of USe SP 3712T ST P TH!NK ACT REVIEW Rev.6 General 19 of 21

o e

'e NEMA SIZE STARTER 3 NEMA SIZE STARTER 4 300% 300'4 OVERLOAD OVERLOAD HEATER CURRENT IN HEATER CURRENT IN CATALOG NUM, AMPS CATALOG NUM. AMPS G30T45A 87 G30TSOA 150 G30T40A 98 G30TS1A 161 G30147A 100 G30TS3A 175 G30748A 116 030T54 200 G30149A 126 G30T55 230

~

LOT 49B 135 G30157 270 l G30150A 146 d30T58 300 G30I51 A 158 G30T59 320 o30153A 171 G30100 360 l 630154 194 G30T61 400

^

i G30T55 220 G30T62 440 G30T57 260 G30T63 500 G30158 290 G30T64 550 G30T59 310 G30T60 340 Attachinent 3 Gould IIcater 300% Overload Current Thbles MSh (Sheet 3 of 3)

Level Of Use - - - .

SP 3712T ST P TH NK ACT REVIEW Rev. 6 Genera 20 of 21

~

8 I

DATA TABLE I

' overload Time in lastantaneous instantaneous Trip !

Breaker Type / Style Rating in Amps Seconds at 300% Current Range in Time in (77* F f. 5'F) Amps Secs / Cycles Gould ITE type E2, 15 - 25 4.5 - 70 300 - 980 E3, E4, HE4, HE6 30 - 100 I 4.5 - 70 450 - 1260 Gould Type FJ 150 28 -190_ HIGH 1200-2240 Gould AmpCap ALL 17 - 68 See Attachment 2 Westinghouse Type EB.EHB,FB HFB 15 10 - 42 135 - 1050 15 8 - 42 135 - 1050 20 8 - 42 180 - 1400  !

25 1 8 - 42 225 - 1750 7 Cycles or Less l GE E150 Line Breaker Type 30 ( 8 - 42 270 - 2100 TED 35 I 8 - 42 315 - 2450

{'

40 8 - 42 360 - 2800 45 8 - 42 405 - 3150 50 8 - 42 450 - 3500 LOW

~

GE J600 Line Type 125 35 - 110 HIGH

- TJJ TJK,THJK, .!

825 - 1925 THJK2,(225 Amps LOW Max.) 342 - 833 l 176 35 - 110 HIGH i 1155 - 2695  !

Siemens Type 15 - 25 4.5 - 70 ED2, ED4, ED6, 300 - 980 HED4,HED6.

30 - 100 4.5 - 70 450 - 1400  !

+ 40% and - 25% included for Instantaneous Current Range Attachment 4 Molded Case Breaker Acceptance Criteria is (Sheet 1 of !)

Level of USe .

SP 3712T ST P TH!NK ACT REVIEW Rev.6 General 21 of 21 j

r s

4 ,

\

, ;4

" Containment Peneiration Conductor Ove current Protection DevicC Surveillance Test l scou A*pato

_ AON)/El NCE COVER SHEET pate pao ,

~$$l'n'2.l f $$$ ' ~ "' "

8~9Y*O9/

sc-toute oats (pesc a r uoot moutscv 1.2.3.nnd4 18 months issi Avveno av nuvs, oats p

cOMtt1E D Bf oATE Acciateo , int.t am mie YES APPOED SV WARTMiki HE AD cO ON(O DATE NO

\ TECH SPEC MAINTENANCE SYSTEM NON-TECH SPEC SURVEILLANCE RESTORATION ALIGNMENT SURVEILLANCE ISI TESTING TEST EQUIPMENT OA NUMBER CAL DUE DATE Test Etlu,ipment information is in !uded in AWO for perfor ming surveillance.

..m ACCEPTANCE CRITERIA 18 Month Sun cillance

1. lireakers tested trip within current and time range specified on applicable Maint. Form.

2.109 of each type of unitized starter or breaker listed on NUSCO drawing 25212-30111 Sh.1. Technical Specifi.

cations Surveillance Table,(S&W Drawing EE-00lDA), have been tested during this surveillance period. Ior each breaker found inoperable during the functional test, an additior.al 10% of the same breaker type have been tested.

IN ACCORDANCE WITH REFERENCE PROCEDURE INITIALS

1. PREREQUISITES!!NITIAL CONDITIONS COMPLETED U PRECAUTIONS NOTED 3 COMMENTS: (IF MAINTEN ANCE RESTORATION, INDICATE BELOW WORK ORDER d, ETC )

SH:FT SUPERVISOR NOTIFIED OF FAILED SURVEliLANCE INITIALS 4 l DATA (rg.itM pm4$n fe d, GI _

Data is contained in AWO on applicable Maint. Form. DatO 'l /l'9't InitiaLGd 11 N

. gyl w

,11 W r m otI von =.-Q* k/-

Maint. Form 3712T- 1 Rev. 5

  • Surveillance heking Fonn lireaker'lype A - IlllC K600 Location AWO l

Date 1,ocation AWO Date Complete Complete 32S3 - 2 32M8-2 l l l l 3RCI"l'NL3 3RCP-PNL6

(-N1) (-N1) 32V3-2 32X3-2 l l 3RCl"PNL5 l 3RCI"PNL5 l l

(-NI) l (-N2) l l 32Y3-2 32M3-2 l l l l 3RCl"PNL3 3RCP-PNL6

, (-N2) (-N2) 32Cs-2 1

Ilreaker 'Iype 11 - Gould FJL

^

)

Location AWO Date Location AWO Date Complete Complete 32-lC(F3F) 32-lM(R2F) 3RCP-PNL3A 3RCP-PNL3B (F4D) (F2M) 32-2C(RlD) 3RCP-PNL3A (R3M) 1 i

I d

Maint. Form 3712T- 1 Rev. 5 Page 2 of 12

a s

~

Breaker 'lype C - GE TED U# Location AWO Date Location AWO Date Complete Complete -

3VI3A-PNL5C 3SCV'PNL9P (CKTil) (CKTil) 3VBA-PNL5C 3SCV'JB9P (CKTil A) (CKTil A) 3SCA PNL8N 3SCA-PNL8N (CKT32) (CKT29) 1 3SCA-PNL5N 3SCA-PNL8N (CKT21) (CKT28) 3SCA-PNL28N 3SCV'PNL90 (CKT21) (CKT18) 3SCV'PNL50 3SCV*PNL9P (CKT10) (CKT17) 3SCV'JU50 3SCV*PNLIO (CKT10A) (CKT29) 3SCV'PNL9P 3SCV'JBPNLIO (CKT10) (CKT29A) 3SCV'JB9P 3SCV'PNL1P

_ (CKT10A) (CKT29) 3SCA-PNL6N 3SCV'J13PNL1P (CKT12) (CKT29A) 3SCV'PNL50 3SCV'PNLIO (CKT15) (CKT30) 3SCV'J1350 3SCV'JUPNLIO (CKT15A) (CKT30A) 3SCV*JBPNLIP 3SCV'PNLIP (CKT28A)

(CKT28)

Maint. Form 3712T-1 Rev. 5 Page 3 of 12

. . ~ _ _ _ _ . _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ ,

i

~

. Breaker 'lype C - GE TED

! 'kh Location AWO Date Location AWO Date l Coniplete Coniplete l 3SCA-PNL5N 3SCA-PNL5N j (CKT22) (CKT13) 3SCA-PNL6N 3SCA-PNL6N (CKT13) (CKT16) l 3SCA-PNL6N 3SCA-PNL5N (CKT25) (CKT18)

! 3SCA-PNL5N 3SCA-PNL6N t

(CKT16) (CKT18)

); 3SCA- PNL5N 3SCA-PNL5N (CKT29) (CKT20)

'f 3SCA-PNL6N 3SCA-PNL6N j (CKT26) (CKT20) i 3SCA-PNL5N 3SCA-PNL6N

(CKT23) (CKTl) 3SCA-PNL5N 3SCA-PNL6N (CKTIS) (CKT2)

.-.s 3SCA-PNL6N 3SCA-PNL6N

} (CKT22) (CKT3)

!. 3SCA-PNL5N 3SCA-PNL6N l (CKT17) (CKT4)

) 3SCA-PNL6N 3SCA-PNL5N j (CKT17) (CKT36)

{ 3SCA-PNL5N 3SCA-PNL6N j (CKT19) (CKT28)

! 3SCA-PNL6N 3SCA-PNL5N ['

j (CKT21) (CKT2) l I

i n

4 J

l Maint Form 3712T-1 1 Rev. 5 Page 4 of 12

1 i

l ', Breaker 'lype D - GE TIIJK

    • " Locallon AWO Date Location AWO Date Coniplete Coinplete 3RCS'PNL- 1 3RCS* PNL-2

(-1) (-1) 3RCS'PNL10 3RCS'PNL20 l

(-1) (-1) 3RCS* PNL- 1 3RCS'PNL-2  !

(-2) (-2) l 3RCS* PNL10 3RCS'PNL20

(-4) (-4) 3RCS

  • PNL- 1 3RCS'PNL-2

(-3) (-3) 3RCS* PNL10 3RCS'PNL20

(-2) (-2) j 3RCS'PNL- 1 3RCS'PNL-2 j'

(-4) (-4) 3RCS* PNL10 3RCS'PNL20

(-5) (-5) 3RCS* PNL- 1 3RCS* PNL-2

(-5) (-5) 3RCS'PNL10 3RCS*PNL20

(-3) (-3)

Maint. Form 3712T-1 Rev. 5 -

Page 5 of 12

Breaker 'l)'pc D - GE THJK W Location AWO Dale Location AWO Date Complete Complete 3RCS- PNL-5 3RCS-PNL-3

(-4) (-5) 3RCS-l'NL50 3RCS-PNL30

(-5) (-3) 3RCS-PN L-5 3RCS-PNL-3

(-5) (-3) 3RCS-PNL50 3RCS-PNL30

(-3) (-2) 3RCS- PNL-5 3RCS-PNL-3

(-6) (-4) 3RCS-PNL50 3RCS-PNL30

(-6) (-5) 3RCS-PNL-5 3RCS-PNL-4

(-1) (-5) 3RCS-PNL50 3RCS-PNIAU

(-1) (-3)

~

3RCS-PNL-5 3RCS-PNL-4

(-2) (-1) 3RCS--PN L50 3RCS-PNL40

(-4) (-1) 3RCS- PNL-5 3RCS-PNL-4

(-3) (-2) 3RCS-PNL50 3RCS-PNIA0

(-2) (-4) 3 RCS-PNL-3 3RCS-PNL-4

(-1) (-3) 3RCS-PNL30 3RCS-PNIA0 .

(-1) (-2) 3RCS-PNL-3 3RCS-PNL-4

(-2) (-4) 3RCS-l'NL30 3RCS-PNIAU

(-4) (-5) -

Maint. Form 3712T- 1 Rev. 5 Page 6 of 12

4 ei Breaker'Iype E - Gould Ampeap Location AWO Date Location AWO Date Complete Complete 32-2R(RlJ) 32-2hi(F213) 32-2W(RlJ) 32-lC(F211) l 32-2R(R2F) 32-lhi(F211) 32-2R(R23) 32-2C(R3F) j 32-2R(R2M) 32-2ht(R2F) 32-2R(RIF) 32-2C(R3J) 32-2W(R2F) 32-2M(R2J) 32-2W(R23) 32-2R(R3F) 32-2W(R2M) 32-2R(R3J) 32-2W(Rl F) 32-2W(F33) 32-2R(R5J) 32-2W(F3F) 32-2W(R3M) 32-2R(RSF) 32- 1C(R3M) 32-2W(R3J) 32- 1M(F3D) 32-2R(F4M) 32-2M(F3K) 32-2W(F4M)

Maint. Form 3712T-1 Rev.5 Page 7 of 12

, , lireaker'lype E - Gould Ampcap 1,ocallon AWO Date Location AWO Date Complete Complete 32-1C(F2D) 32-2Ca(F1F) 32-lC(F2K) 32-2M(R3J) 32-lM(F2K) 32-2Ma(Fij) 32-2C(R2M) 32-2C(F3M) 32-lM(F3M) 32-2Ca(RIF) 32-2W(F4J) 32-2M(R3M) 32-2C(F2M) 32-2Ma(RIC) ,

32-2M(F211) 32-2C(R3M) 32-2C(R21I) 32-2Ca(R1C) 32-2R(R4F) 32-2M(R2M)

, 32-2W(R4F) 32-2Ma(R1F) 32-2C(F3F) 32-2R(R4J) 32-2Ca(F1J) 32-1C(F3K) 32-2M(R3F) 32-1M(R3M) 32-2Ma(F1F) 32-IC(F3M) 32-2C(F3J) 32-1M(F311) i Maint. Fonn 3712T-1 1 Rey, 5 Page S of 12

lireaker 'lype F - Gouki IIE43 N. '

l.ocation AWO Date 1,ocation AWO Date Complete Compicic 32-2Ra(F2ilT)32-411(2KT) 32-2W(F6TT) 3RCI'-PNL3A (R2F) 32-2Ra(F2DT) 3RCP-PNL3A (R4K) 32-2Ra(F2Dil) 32-lC(R3J11) 32-2Ra(F2FT) 3RCP-PNL3A i (F311)

~

32-2Ra(F2Fli) 32-IM(R3RB)- l l

32-2W(F611T) 3RCP-PNL311 l (F311) 4 32-2W(F611B) 3RCP-PNL3A (F3F) 32-2W(F6DT) 3RCP-PNL3A (R4D) 32-2W(F6DB) 3RCP-PNL311 (R3B) 32-2Ra(F21IB) 3RCP-PNL3A (F3D) 32-2W(F6FB) 3RCP-PNL3A (R1K) 32-IC(R3JT) 32-2W(F6KT) 32-2Ra(F2KT) 32-2W(F6KB) -

32-2Ra(F2KB) 3RCP-PNL3B (R21I)

Maint, Form 3712T-1 Rev.5 Page 9 of 12

l Hrcaker 'lype F - Gould HE43 Location AWO Date Locatltm AWO Date j Complete Complete l 3 RCI'- PNI.3A 3RCP-PNL311

) (Fill) (RIK) i 3RCP-PNL3A 3RCP-PN1JA

] (R4B) (R2K) 1 3RCP-PNL3B 3RCP-PNL311

) (F2B) (RlM) 3RCP-PNL3B (R2B) 32-2C(F2DT) i 3RCP-PNL3B 3RCP-PNL3A (R2D) (F411)

, 3RCP-PNL3A j (F2D) 32-lM(F3FT)

3RCP-PNL3B 3RCP-PNL3A i
(F2D) (RIM) i 3RCP-PNL311 j (R2F) 32-2Ra(F2BB)

) .~ 3RCP-PNL3A 32-2W(R6MB)

(F2L) 3RCP-PNL3A 32-lC(FillT) (g3p) 3RCP-PN13A (R3D) 32-2Ra(F2MT) 32-thi (R3BB) 32-2W(F6MT) 3RCP-PNL3B (F211) 32-2Ra(F2MB) 32-1C (Filill) 32-2W(F6MB)

Maint. Form 3712T-1 Rev,5 Page 10 of 12

Breaker 'lype F - Gould HE43

  1. O I,ocation AWO Date Location AWO Date Complete Complete 3RCI'-PNL3A (R3B) 32-2C(F2FT) 3RCP-PN1JA 3RCP-PN13A (F2B) (R2hi) 3RCP-PNL3A 3RCP-PNL3B (F3.F) (R2E) 3RCP-PNL311 (F2F) 32-lC(F3BB) i 3RCP-PNL3B 3RCP PNL3A (F311) (F4K) 3RCP-PNtJA (R211) 32-2C(F2ilT) 3RCP-PNL3B 3RCP-PNL3B1 (F11I) (F1D) 3RCP-PNL313 (R3F) 32-lhi(R3BT) 3RCP-PNL311 3RCP-PNL3A (R3D) (F3ht) 3RCP-PNL3A (F311) 32-lht(F3FB) 3RCP-PNL3D 3RCP-PNL313 (F3G) (R3hi) 2-2W

{, 32-IC(F3BT) 32-2R(F2KII) 3RCP-I 1J13 3RCP-PNL3A (Flll) 32-lhi(F2hiB) 32-2W(FlKil)

'~ "

(pitf) 3RCP-PNL313 (FIB) 32-IC(F2 hit) 3RCP-PNL3A (FID) 32-lhi(F2 hit) hiaint. Form 3712T-1 Rev,5 Page 11 of 12

. Ilreaker 'lype F - Gould IIE43

4) Location AWO Date 1 ocation 1 AWO Date Complete Complete 3RCP-PNL311 (F3K) 32-2R(R4KB) 3RCI'-l'N!JA 32-2W(F611B) 32-2hi(F3FT) 3I ~ IE^

(RlB) 3RCP-PN!J13 3RCP-PNL3A (F3ht) (R2C) 3RCP-PNL313 3RCP-PNL3A i (RlB) (R4E)

, 3RCP-PNL3B 3RCP-PNL3B (R3A) (RlH) 3RCP-PNL3A 3RCP-PN1J13 (RID) (R3G) 3RCP-PNL3A 3RCP-PNL3A

! (R4A) (R4G) 3RCP-PNL3B 3RCP-PNL3B

'~

(RID) (R3J) 3RCP-PNL3B 3RCP-PNL3A (R3C) (R43) 3RCP-PNL3A 3RCP-PNL3B (RIF) (R3K) 3RCP-PN13A (R4C) 32-2R(R4KT) 3RCP-PNL3B 3RCP-PNL3A (RIF) (FlK) 3RCP-PNIJB 3RCP-PNL3B (R3E) (FlK) 3RCP-PNL3A 3RCP-PN13A (Rlli) (Flhi) 3RCP-PNL311 3RCP-PNL311 (R2K) (Flhi) 3RCP-PNL3A 3RCP-PNL3A (R2B) (F3K) 3J B- 1009 3JB-1010 hiaint. Form 3712T- 1 l Rev. 5 Page 12 of 12

> Y//) li1 3 * ? Y *Wll

/ Forn(Approvet b irector - Millstone Unit 3 Effdctid Dat:> PORC Mtg. No.

U Load Center lireaker Containment Penetration Surveillance Test Data Sheet 13reaker Location: AWO #:M3- -

Trip Device 'lype:

Settings From Specification SP-EE-321

, Ampere 'lhp:

' Function Long Time Short Time Instantaneous Multiplier Tap:

Delay Band: N/A ACCEPTANCE CRITERIA Delay Time Long Time to Seconds Short Time to _ Seconds Delay Test Current Value Ampere Tap x Multiplier Tap x % = Test Current Amps Long Time x x3=

Short Time x x 1.5 =

)

Maint. Form 3712T-3 Rev. 4 Page 1 of 2

7 Step #

, OA O 11 OC Results j 4.1.2.c. Instantaneous Anips OSAT Setpoint O UNSAT 4.1.4.c. l.ong Time Seconds OSAT Delay 0 UNSAT 4.1.3.c. Sliort Time Seconds OSAT Delay 0 UNSAT COMMENTS: _

Work Performed By: Date:

Data Reviewed By: Date:

Maint. Form 3712T-3 Rev. 4 Page 2 of 2 a

, . . . , . . , . , . . --.e-,,-.- , ., - , . _ . . ,

Form Apptoved by Dir c

_/ W/IN7 3 -97 (?2/

Mill atnit 3 [/ Eff(ctivdDato PORC Mtg. No.

Gould Ani > cap ICC Containment l'enetration b lance Test Data Sheet Ilreaker Location: AWO #:M3- -

"llip Coil'lype: A80_ 'llip Coil Setting:

Starter Size:

l lleater G30T I Ambient Temperature:

INSTANTANEOUS TRIP TEST ACCEL'TANCE CRITERIA Trip Range: to Amps Trip Time: 7 Cycles or less Instantaneous Overcurrent Test Results Step # 4.2 4.c.5) OA 0 11 OC Units Results TtP Cunent Amps

  • ST and Time Time Cycles

[] UNSAT INSTANTANEOUS TRIP TEST USING TWO PIIASES Instantancotis Overcurrent Test Results

  • N/A O St ep, 4.2.5.c. OA--011 Oll-OC OA-OC Trip Current Amps Trip Time Cycles
  • N/A if not performed Maint. Form 3712T-4 Rev. 5 Page 1 of 2

. /

! TIME DELAY OVEllCUltitENT Q,#

ACCEPTANCE CRITERIA llip Time 17 to 68 seconds lleater Overload Test Results Step # 4.2.6.f. OA Oli OC Results U SAT Trip Time Seconds U UNSAT COMMENT / REMARKS

(

Woik Performed 13y: Date:

Data Reviewed 13y: Date:

f

' Maint. Form 3712T-4 Rev.5 Page 2 of 2

~ _

Will97 3 '77 07)

Form Appeoved by Director illstoptiUnit 3 - Eff/ctiv6 Date PORC Mtg. No?

+- Molded Ci se lirca er Containinent l'enetration Su iltance Test Data Sheet l

13reaker Location: AWO #:M3- -

Ilreaker Manufacturer 13reaker Rating 13reaker 'lype: 'llip Setpoint: i Ambient Temperature: 1 INSTANTANEOUS TRIP TEST i

ACCICPTANCIC CRITl?!(IA Q Adjustable Q liixed Tiip Range: __ to Amps Trip Time: 7 Cycles or less

- Instantaneous Overcurrent Test Results Step # 4.3.5.c.4) OA 0 13 OC Units Results

' Dip Current Amps and OST Time Time Cycles O UNSnf INSTANTANEOUS TRIP TEST USING TWO PHASES Instantancons Overcurrent Test Results

  • Step 4.3.6.3) OA-OB OB-OC OA-OC Trip Current Amps Trip Time Cycles
  • N/A if not performed Maint. Form 3712T-5 Rev. 3 Page 1 of 2

', ! TIME DELAY OVERCURRENT td ACCEPTANCE CRITERI A Trip Time to seconds i x (3) litcaker Rating 3009lr overload Test current i

Time Delay Overcurrent Results l

Step # 4.3,7.g. OA Oil OC Results Trip Time Seconds O SAT

! l 0 UNSAT l

COMMENT / REMARKS Work Performed 13y: Date:

Data Reviewed 13y: Date: _

Maint. Form 3712 T-5 Rev.3 Page 2 of 2