50-424 Mr. Richard Conway 4 gg $36 Vice President and Project General Manager 1
Ceorgia Power Company Route 2, Box 299A Waynesboro, Georgia 30830
Dear Mr. Conway:
SUBJECT:
V0GTLE ELECTRIC GENERATING PLANT, UNIT 1 ITEMS UNDER REVIEW FOR LOW POWER LICENSE A meeting was conducted on October 8,-1986 with Georgia Power company to discuss the licensing items that are currently open and require resolution prior to issuance of the operating license scheduled for December 15, 1986 for Vogtle Electric Generating Plant, Unit 1. contains your staff's proposed submittal dates' for these items as well as confirmatory items that must be completed prior to license issuance.
Some of the proposed submittal dates in Enclosure 1 are later than originally projected.
You should be aware that failure to meet the presently proposed dates with full and complete submittals may result in more than a day for day impact on your proposed fuel loading schedule due to scheduling of staff re-sources.
In order to maintain the current projected fuel load date, we suggest that the enclosed items be given a higher level of priority to facilitate resolution of these items prior to the enclosed proposed dates.
If there are any questions in resolving any of these items, call the licensing project manager, John Thompson at (301) 472-7396.
Sincerely,
\\
i B.J. Youngblood, Director PWR Project Directorate #4 Division of PWR Licensing-A cc: See next page DISTRIBUTION:
Doctet r11e Local PDR NRC'PDR PWR#4 Reading BJYoungblood JThompson MDuncan JPartlow EJordan BGrimes NThompson MReinhart, AR ACRS(10)
PWR#
PWR#4/DPWR-A PWR#4/DPWR-A f BJYou//86 JTho n/ rad P0'Connor ngblood 10/
6 10/ 4/86 10//'
f
$ko2ggg M A
s ENCLOSURE 1 ITEMS THAT MUST BE RESOLVED PRIOR TO ISSUANCE OF THE LICENSE FOR V0GTLE ELECTRIC GENERATING PLANT, UNIT 1 Item Due Dat'es 1.
Equipment Qualification a.
Seismic EQ 10/31/86 b.
Environmental EQ 10/31/86 c.
Pump and Valve Operability Assurance 10/31/86 2.
Compliance with NUREG-0737, Item II.D.1 11/03/86 3.
Seismic Separation 10/31/86 4.
LOCA in Mode 4 10/15/86 5.
Fire Protection 11/03/86 6.
Incorporation of Plant-specific recommendations for 10/31/86 TDI Diesel Generators 7.
GL 83-28 (Sect 4.2.3 and 4.2.4) 10/15/86 8.
Inservice Testing Program of Pump and Valves 10/24/86 9.
Licensee qualification for operations 10/31/86 10.
Technical Specifications 10/20/86 11.
RVLIS Report 06/01/87 12.
Steamline break outside of containment 10/15/86 13.
Safety Parameter Display System (SPDS) 11/03/86 14.
Test of engineered safeguards (P-4 interlock) 10/15/86 15.
IE Bulletin 80-06 12/01/86 16.
Override of Isolation signals 10/15/86 17.
Bypass and inoperable status panel 12/01/86 18.
Compliance with NUREG-0737 Item II.K.3.1 12/01/86 19.
Capacity of each reserve auxiliary transformer 12/01/86 to start and run loads of both Class IE trains 20.
Verification test results for the adequacy of 12/01/86 plant electric distribution system voltage
2-
~
21.
Electrical Separation Criteria, RG 1.75 10/16/86 22.
Training Program 10/24/86 23.
Emergency Preparedness 10/31/86 24.
Physical Security 10/20/86 i
i 4
1 i
t i
l l
t f
I l
i m
. - -,e-v-
,e-r-,
i..--m--,-
r
,-w n--
--w c-.
...,%yy_.e,_,
,-w,,-.-m-%
,- = - + --- --
.w w,_-. ~. -
Mr. R. E. Conway Georgia Power Company Yogtle Electric Generating Plant cc:
Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Depoish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /
Suite 225 Southern Company Services, Inc.
32 Peachtree Street, N.W.
P.O. sox 2625 Atlanta, Georgia 30303 Biit..ngham, Alabama 35202 James E. Joiner Mr. Donald O. Foster Troutman, Sanders, Lockerman, Vice President & Project General Manager
& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.
Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.
P.O. Box 2625 Carol Stangler Birmingham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.
Atlanta, Georgia 30307 Bruce W. Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, D. C.
20037 Mr. G. Bockhold, Jr.
Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323
.