Text
-
June 5, 1986 Docket No.:
50-213 DISTRIBUTION
-Docket:.Etle*
FMiraglia Mr. John F. Opeka, Senior Vice President ISAP Readin'g ACRS (10)
Nuclear Engineering and Operations NRC PDR OELD Connecticut Yankee Atomic Power Company Local PDR NSIC Post Office Box 270 CGrimes JPcrtlow Hartford, Connecticut 06141-0270 FAkstulewicz BGrimes PAnderson AWang
Dear Mr. Opeka:
GKelly MBoyle
SUBJECT:
REQUEST FOR DOCUMENTS FOR THE REVIEW 0F THE HADDAM NECK PROBABILISTIC SAFETY STUDY During recent telephone conversations with your staff and during the meeting with your staff on May 20-21, 1986, we indicated that we need additional information to complete our review of the Haddam Neck Probabilistic Safety Study (PSS). Please provide the NRC with copies of the P& ids or one-line diagrams that your PRA staff used for development of simplified diagrams of the following systems:
DC Power AC Power Auxiliary Feedwater System Main Feedwater System Component Cooling Water System Instrument Air System Containment Spray System Containment Air Recirculation Fans Functional Control Diagrams We also need copies of all the fault trees (unreduced) developed in the PSS for support state 1.
Inasmuch as this information is currently on the docket in other forms, you need only provide two copies of these documents directly to our office; however, you should submit copies of the forwarding letter to the NRC Document Control Desk for docketing. Your early cooperation in this matter will speed the NRC staff's review of the Haddam Neck PSS. This request affects fewer than ten respondents and, therefore, OMB clearance is not required in accordance with P.L.96-511.
Sincerely, Original signed by Christopher I. Grimes Christopher I. Grimes, Director Integrated Safety Assessment Project Directorate Division of PWR Licensing - B cc: See Next Pag k L[:Tt i
ISA L-B IU M L-B ISAP:DPL 1,
ISAP:DPL-i P/ r rson FAkstulewicY CGrimes GK) 06/ /86 06/ /86 06/C' /86 06/Q/86 a
8606110528 860605 PDR ADOCK 05000213 P
pop
Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406