ML20211B075
| ML20211B075 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 02/13/1987 |
| From: | Hehl C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20211B079 | List: |
| References | |
| NUDOCS 8702190308 | |
| Download: ML20211B075 (2) | |
See also: IR 05000456/1986023
Text
m
.
FEB 131987
Docket No. 50-456
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. F. A. Maura
and R. Mendez of this office on May 25, 1986 through January 29, 1987, of
activities at Braidwood Station, Unit 1, authorized by NRC O
No. NPF-59 and to the discussion of our findings with Mr. E.perating License
Fitzpatrick
and others of your staff at the conclusion of the inspection.
The enclosed copy of ot e inspection re) ort identifies areas examined during
the inspection. Within these areas, tie inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as described in the enclosed Notice.
The inspection
showed that action had been taken to correct the identified violation and
to prevent recurrence.
Our understanding of your corrective actions are
described in Paragraph 6 of the enclosed inspection report.
Conseguently,
no reply to the violation is reguired and we have no further questions
regarding this matter at this time.
In accordance with 10 CFR 2.790 of the Commission's regulations, a co)y-
of this letter and the enclosed inspection report will be placed in t1e
NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Oric3nal Signed By C. W. Ilobl
!
C. W. Hehl
Chief
',
Operations, Branch
!
Enclosures:
'
1.
2.
Inspection Report
No. 50-456/86023(DRS)
See Attached Distribution
l
RIII
RIII
f
iRIII
R
i
MaYri/Ims
NEbeh
P1
rg$
1f
' )WB)
H
, 3 In
l
>/,,/t r
>/"/F1
'2
1
>
0702190300 070213
(
{Dff
ADOCK 05000456
\\ \\
l
PDre
\\
s Ico/
7
. -
.
FE813 1987
Commonwealth Edison Company
2
Distribution
cc w/ enclosures:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin,' Construction
Superintendent
E. E. Fitzpatrick, Station
Superintendent
P.L.Barnes$uRegulatory
DCS/RSB (RIDS)pervisor
Assurance
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, ice, Environmental
Attorney
General's Off
Control Division
D. W. Cassel, Jr.
Esq.
J.W.McCaffrey,Uhief,Public
Utilities Division
H. S., Taylor, Quality Assurance
Division
'E.
Chan, 0GC
J. Moore, 0GC
G. Berry, 0GC
'J.
Stevens, NRR~
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan ASLB
TheHonorableRichardF. Cole,ASLB
l
!
!
!
i
!
il