ML20211B075

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-456/86-23 on 860525-870129 & Notice of Violation
ML20211B075
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 02/13/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20211B079 List:
References
NUDOCS 8702190308
Download: ML20211B075 (2)


See also: IR 05000456/1986023

Text

m

.

FEB 131987

Docket No. 50-456

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. F. A. Maura

and R. Mendez of this office on May 25, 1986 through January 29, 1987, of

activities at Braidwood Station, Unit 1, authorized by NRC O

No. NPF-59 and to the discussion of our findings with Mr. E.perating License

Fitzpatrick

and others of your staff at the conclusion of the inspection.

The enclosed copy of ot e inspection re) ort identifies areas examined during

the inspection. Within these areas, tie inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice.

The inspection

showed that action had been taken to correct the identified violation and

to prevent recurrence.

Our understanding of your corrective actions are

described in Paragraph 6 of the enclosed inspection report.

Conseguently,

no reply to the violation is reguired and we have no further questions

regarding this matter at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a co)y-

of this letter and the enclosed inspection report will be placed in t1e

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Oric3nal Signed By C. W. Ilobl

!

C. W. Hehl

Chief

',

Operations, Branch

!

Enclosures:

'

1.

Notice of Violation

2.

Inspection Report

No. 50-456/86023(DRS)

See Attached Distribution

l

RIII

RIII

f

iRIII

R

i

MaYri/Ims

NEbeh

P1

rg$

1f

' )WB)

H

, 3 In

l

>/,,/t r

>/"/F1

'2

1

>

0702190300 070213

(

{Dff

ADOCK 05000456

\\ \\

l

PDre

\\

s Ico/

7

. -

.

FE813 1987

Commonwealth Edison Company

2

Distribution

cc w/ enclosures:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin,' Construction

Superintendent

E. E. Fitzpatrick, Station

Superintendent

P.L.Barnes$uRegulatory

DCS/RSB (RIDS)pervisor

Assurance

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, ice, Environmental

Attorney

General's Off

Control Division

D. W. Cassel, Jr.

Esq.

J.W.McCaffrey,Uhief,Public

Utilities Division

H. S., Taylor, Quality Assurance

Division

'E.

Chan, 0GC

J. Moore, 0GC

G. Berry, 0GC

'J.

Stevens, NRR~

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan ASLB

TheHonorableRichardF. Cole,ASLB

l

!

!

!

i

!

il