Text
I I,
.(
May 30, 1986
/
Docket No. 50 293 DISJRIMTi%
~ ocket File ]
Nihompson "iRC PDR/LucaT POR Pleech Mr. William D. Harrington BWD#1 Rdg CJanerson Senior Vice President, Nuclear JZwolinski ACRS (10)
Boston Edison Company RBernero JStang 800 Boylston Street OELD Pilgrim file Boston, Massachusetts 02199 EJordan BGrimes
Dear Mr. Harrington:
JPartlow
SUBJECT:
CONTROL ROOM FLOOR COVERING (TAC 60586)
Re:
Pilgrim Nuclear Power Station By letter dated January 14, 1986, you requested approval for the installation of carpeting in the Pilgrim Station control room which complies with the most restrictive critical radiant flux (CRF) classification (Class Il for floor covering material. The CRF is determined by standard test procedures established by the National Fire Protection Association (NFPA 253) and the American Society for Testing Materials (ASTM E-648).
For Class I, the minimum allowable CRF is 0.45 watts per square centimetcr, as determined by the test method in ASTM E-648.
Mr. DiMeo and Mr. Venkataraman of your staff have informed us by telephone that the proposed carpet will have a smoke development ratino of 450 or less, as required by the NFPA 101 " Life Safety Code." This will be an improvement over the carpet presently in the control room, which has a smoke development ratino of approximatelv 600.
Based on the above information, we conclude that installation of the proposed Class I carpet will not significantly decrease the level of fire safety in the control room and, therefore, represents an acceptable deviation from C.7.b of Branch Technical Position CMER (formerly APCSR) 9.5-1.
Please inform us of the actual CRF and the smoke development rating of the proposed carpet when that information is available.
Sincerely,
/S/
John A. Zwolinski, Director BWR Proiect Directorate #1 Division of BWR Licensing cc: See next page C: DBL:PD#1
- DRL:PD#1
- DBL:PD#
- dbl:PD#1 y:._____
f:Pleech
- JStang s ):JZwolinski NAME :CJamerson
_____:__________t
/
g61gg
- f Jo/86
- f/30/86
- /
DATE : 6/*//86 P
PDR OFFICIAL RECORD COPY
o a
Mr. William D. Harrinaton.
Poston Edison Comoany Pilgrim Nuclear Power Statien cc:
Mr. Charles J. Mathis, Station Mgr.
Boston Edison Company RFD #1, Pocky Hill Road Plymouth, Massachusetts 02360 Resident Inspector's Office
- 11. S. Nuclear Regulatory Commission Fost Office Rox 867 Plymouth, Massachusetts 02360 Chairman, 90ard of Selectmen 11 Lincoln Street Plymouth, Massachusetts 02360 Of# ice of the Commissioner Massachusetts Department of Environmental Ouality Enaineering One Winter Street Roston, Massachusetts 09108 Office of the Attorney General 1 Ashburton Place 19th Floor Boston, Massachusetts 02108 Mr. Robert M. Hallisey, Director Radiation Control Prooram Massachusetts Department of Public Health 150 Tremont Street Poston, Massachusetts 02111 Regional Administrator, Region 1
- 11. S. Nuclear Reoulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. James D. Keyes Poston Edison Comnany 25 Rraintree Hill Office Park Rraintree, Massachusetts 02184