Discusses NRC-directed Work on Health Physics Network Circuitry for Technical Support Ctr & Emergency Offsite Facility.Work Should Be Completed as Soon as Possible.Nrc Operations Ctr Should Be Notified Upon Completion
ML20211A615
Person / Time
Site: Pilgrim
Issue date: 05/30/1986
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Harrington W
BOSTON EDISON CO.
References
TAC-61501, NUDOCS 8606110239
Download: ML20211A615 (2)


Text

~

T

- May 30, 1986 Docket No. 50-293 DISTRTRIITinN; Docket File )

Mr. William D. Harrington NRC PDR RBernero Senior Vice President, Nuclear Local PDR JZwolinski Boston Edison Company PD#1 Rdg EJordan 800 Boyston Street JPartlow BGrimes Boston, Massachusetts 02199 Pleech ACRS (10)

CJamerson KPerkins

Dear Mr. Harrington:

0 ELD

SUBJECT:

EMERGENCY COMMUNICATION SYSTEM AT LICENSEE PLANT SITES (TAC 61501)

Re: Pilgrim Nuclear Power Station This letter is to inform you about NRC directed work to be done to the Health Physics Network (HPN) circuitry for the Technical Support Center (TSC) and Emergency Offsite Facility (E0F). This work does not require any action on your part except to allow the phone company to do the work at the TSC and EOF.

The HPN and the Emergency Notification System (ENS) are the emergency communication system between the licensees and the NRC. The NRC has decided that the HPN currently installed does not provide acceptable service. NRC is in the process of having the phone companies replace the current circuitry with commercial service. This will be for only an interim period until a more dedicated service is available. The existing HPN service is currently in the TSC and E0F and may be in your Health Physics office and Resident's Inspector's office. The new HPN service will be located only in the TSC and E0F and the existing service will be removed from the other areas. This is being done for all plants including Pilgrim; however, there is no schedule at present for when this work will be done for the Pilgrim station.

You will be notified that this work is to be done by the New England Telephone

! Company. You are requested to have the company complete the work as soon as l possible. If this work results in changes to the Pilgrim Emergency Plan I and/or its implementing procedures, ensure the appropriate changes are made within a 1 month of when the current HPN is replaced. Immediate pen and ink changes should be made to the Plan and procedures at the TSC and E0F. You are also requested to notify the NRC Operations Center when this work is scheduled to ba done, when it is being done and when it is completed. The phone company i contact is James Giles (617-746-7900), the Region I coordinator is Ken Ferlic (215-337-5083) and the Pilgrim site coordinator is Roger Silva.

Sincerely,

/S/

John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing cc: See Next Page PD#1 BL PD#1.0 PD#1: L l CJ erson/dn PLeech JZwolinski l 5/ /86 5/ 3o/86 5/P/86 8606110239 DR 860530 ADOCK 05000293 PDR l

Mr. Kenneth W. Rerry Consumers Power Comoany Rio Rock Point Plant cc:

Mr. Thomas A. McNish, Secretary Consumers Power Company 212 West Michigan Avenue Jackson, Michigan 49201 Judd L. Bacon, Esquire Consumers Power Company 212 West Michiaan Avenue Jackson, Michigan 49201 Big Rock Point Plant ATTN: Mr. David P. Hoffman Plant Superintendent Route 3 Post Office Box 591 Charlevoix, Michigan 49720 Mr. I. Lee Moerland Chairman, Board of Commissioners P. O. Box 218 Charlevoix, Michigan 49720 Office of the Governor Room 1 - Capitol Ruilding Lansina, Michigan 48913 Regional Administrator Nuclear Regulatory Commission, Reginn III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Resident Inspector Rig Rock Point Plant c/o U.S. NRC RR #3, Box 600 Charlevoix, Michigan 49720

<