AORTHEAST UTILITIES o.n.,,i O=... s m.n si,... e.,nn, cm.m
,7$,
.$*f.,,
HARTFO~.D. CONNECTICUT 06141-0270 J
w
.r w w. cow (203) 665-5000 September 30,1986 Docket No. 50-336 A02959 A05106 Office of Nuclear Reactor Regulation Attn: Ashok C. Thadani, Director PWR Project Directorate No. 8 Division of PWR Licensing - B U. S. Nuclear Regulatory Commission Gashington, D. C. 20555 i
Gentlemen.
Millstone Nuclear Power Station, Unit No. 2 Supplement I to NUREG-0737 Control Room Design Review Summary Report in a letter dated June 14,1984(l), the NRC issued an Order confirming various commitments made.by Northeast Nuclear Energy Company (NNECO) on behalf cf Millstone Unit No. 2 regarding the implernentation of Supplement I to NUREG-0737. In accordance with that Order, NNECO submitted to the NRC Staff the Control Room Design Review (CRDR) Implementation Plan and a schedule for the pubmittal of the CRDR Summary Report in a letter dated Fcbruary 26,1985t2). The Reference (2) schedule specified that the Summary Report would be transmitted to the NRC Staff by September 26,1986. The N Staff subsequently confirmed this submittal date by issuance on July 27,1985g ci a revision to the June 14,1984 order. NNECO acknowledges its failure to provide this report in accordance with the schedule specified in References (2) and (3) by a period of two working days. Steps have been taken to prevent r2currence.
Accordingly, NNECO hereby submits fif teen (15) copies of the CRDR Summary Report for Millstone Unit No. 2.
It should be noted that the Safety Parameter Display System (SPDS) for Millstone Unit No. 2 is not required to be fully operational until March 25, 1987 cr startup for Cycle 8 operation, whichever is later. Appropriate checklists from NUREG-0700 that apply to the SPDS cannot be executed until that time.
Therefore, the results of that portion of the CRDR will be submitted to the NRC Staff on or about August 1,1987 in the form of an addendum to this summary report.
It is significant to note that those Human Factors personnel participating in the CRDR are also involved in the design and development of the SPDS. NNECO believes that this will provide a high degree of assurance that there will be positive results from the NUREG-0700 review of the SPDS.
0610150237 860930 PDR ADOCK OD00033
)
P PDR
[
(1)
- 3. R. Miller letter to W. G. Counsil, dated June 14,1984.
1 (2)
W. G. Counsil letter to 3. R. Miller, dated February 26,1985.
I3)
E 3. Butcher letter to 3. F. Opeka, dated July 27,1985.
~-
+ - ~
M
t 2
With regard to the implementation phase of the CRDR, the NRC Staff has indicated their intention to conduct a " pre-implementation" audit-of the Millstone Unit No. 2 CRDR results. It is the position of NNECO that it is difficult to define a schedule for implementation in a meaningful way until such time as the NRC Staff completes their review of this effort. Accordingly, as specified in the confirmatory order, NNECO has submitted a schedule for implementation of resolutions for Human Engineering Discrepancies (HED's), in Figures 13 and 14 in the attachment to this letter. However, the proposed schedule is contingent upon receipt of NRC approval of the Millstone Unit No. 2 CRDR, by May 31, 1987.
NNECO reserves the right to revise the implementation schedule if our planned corrections are not acceptable to the NRC Staff and changes are required based on the Staf f's review of this report. If a Safety Evaluation (SE) is issued by the NRC Staf f af ter May 31,1987, NNECO will inform the Staff of any changes to the implementation schedule within ninety (90) days of receipt of the SE.
We remain available to discuss this matter with you and schedule the " pre-implementation" audit.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY L
- . G s t J. F. opeM U
Senior Vice President Attachment
-