ML20211A524

From kanterella
Jump to navigation Jump to search
Notice of Deviation from Insp on 861226-870125
ML20211A524
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/06/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20211A432 List:
References
50-414-86-54, NUDOCS 8702190186
Download: ML20211A524 (1)


Text

_ _ _ _ _ _ - _

.e I

ENCLOSURE 2 l

NOTICE OF DEVIATION Duke Power Company Docket No. 50-414 Catawba 2 License No. NPF-52

\"

The following deviation was identified during a Nuclear Regulatory Commission (NRC) inspection conducted on December 26, 1986 - January 25, 1987. 1 The licensee informed the NRC, in its November 18, 1986 response to a Notice of Violation dated October 20, 1986, that training would be completed on IP/0/A/3890/01 (General Troubleshooting Procedure) by November 30, 1986 and that Section 4.3.10 of MMP -1.0 (Work Request Preparation) would be revised by December 31, 1986 to include additional guidance for planners to list t appropriate component procedures when applicable. {

a Contrary to the above, training of all applicable personnel was not completed by November 30, 1986 and Section 4.3.10 of MMP-1.0 was not revised by December 31, 1986.

Please provide in writing within 30 days of the date of this Notice a description of corrective actions regarding this deviation, actions taken to avoid further deviations, and the dates when these actions were or will be completed.

FOR THE NUCLEAR REGULATORY COMMISSION Original Signed by Luis A. Reyes Luis A. Reyes, Acting Director Division of Reactor Projects Dated at Atlanta, Georgia thi: 6th day of Feb. 1987 i

r i

i

[h Du kU

_