ML20210V067
| ML20210V067 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 09/15/1997 |
| From: | Gibson G SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20210V070 | List: |
| References | |
| NUDOCS 9709230018 | |
| Download: ML20210V067 (1) | |
Text
- - - - - - - - -
. g i u,n.. s m ou,,s,.
' UEDISON An na n n nyu nou,,- o.,,,,,,,,
September 15,1997 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:
Subject:
Docket Nos. 50-361 and 50 362 Monthly Operating Reports for August 1997 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Facility Operating Licenses NPF 10 and NPF 15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Enclosures 1 and 2 provide the August 1997 Monthly Operating Reports for Units 2 and 3, respectively. There were rio challenges to pressurizer safety I
valves for either Units 2 or 3.
As a separate item, Enclosure 3 provides corrected pages for July,1997. Changes are noted by revision bars in the right margin.
If you have any questions, please contact Mr. C. E. Williams at (714) 368-6707.
Sincerely, Gregory T. Gibson Manager, Compliance Enclosures rd cc:
E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B. Fields, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3
\\
\\
05Oob61 DR DOC R
PDR kk!klkk P. O. Ikm 128 il San Clemente. CA 92en.ol 28
_