ML20210V067

From kanterella
Jump to navigation Jump to search
Forwards MOR for Aug 1997 for SONGS & Revised MOR for July 1997
ML20210V067
Person / Time
Site: San Onofre  
Issue date: 09/15/1997
From: Gibson G
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210V070 List:
References
NUDOCS 9709230018
Download: ML20210V067 (1)


Text

- - - - - - - - -

. g i u,n.. s m ou,,s,.

' UEDISON An na n n nyu nou,,- o.,,,,,,,,

September 15,1997 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Gentlemen:

Subject:

Docket Nos. 50-361 and 50 362 Monthly Operating Reports for August 1997 San Onofre Nuclear Generating Station, Units 2 and 3 Technical Specification 5.7.1.4 of Facility Operating Licenses NPF 10 and NPF 15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Enclosures 1 and 2 provide the August 1997 Monthly Operating Reports for Units 2 and 3, respectively. There were rio challenges to pressurizer safety I

valves for either Units 2 or 3.

As a separate item, Enclosure 3 provides corrected pages for July,1997. Changes are noted by revision bars in the right margin.

If you have any questions, please contact Mr. C. E. Williams at (714) 368-6707.

Sincerely, Gregory T. Gibson Manager, Compliance Enclosures rd cc:

E. W. Merschoff, Regional Administrator, NRC Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV M. B. Fields, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3

\\

\\

05Oob61 DR DOC R

PDR kk!klkk P. O. Ikm 128 il San Clemente. CA 92en.ol 28

_