Lists Corrective Actions to Be Taken by Util to Correct Deficiencies Re Breakdown in Decisionmaking Process Identified During partial-scale Annual Emergency Exercise on 860909
ML20210U300
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/01/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
References
CAL-86-11, NUDOCS 8610090480
Download: ML20210U300 (3)


Text

_

u s

GCT 011986 Docket Nos. 50-317 50-318 CAL 86-11 Baltimore Gas and Electric Company ATTN: Mr. J. A. Tiernan Vice President Nuclear Energy P. O. Box 1475 Baltimore, Maryland 21203 Gentlemen:

Subject:

Calvert Cliffs Partial Scale Emergency Exercise (September 9,1986)

The Calvert Cliffs Nuclear Power Plant annual Emergency Exercise was held.on September 9, 1986.

During the conduct of the exercise,.our inspectors iden-tified several significant weaknesses in your performance.

The specific deficiencies were discussed by Mr. J. Hawxhurst of the NRC Region I office with yourself on September 10, 1986, following the licensee critique of the exercise.

Your protective action reconsnendations during the exercise were neither timely nor conservative due to a break-down in your decision making process.

The factors contributing to this breakdown were; inadequate direction and control of the accident assessment and dose assessment groups; and poor information flow between these groups and between the dose assessment group and the Site Emergency Coordinator.

Also, source terms, release path-ways and integrated offsite doses were not adequately determined because of inadequate information gathering and evaluation.

'As a

result, the Radiological Assessment Director passed inaccurate information concerning protective action recommendations to the Site Emergency Director.

A more complete description of these observations will be included in Combined Inspection Report Nos. 50-317/86-14; 50-318/86-14.

As a result of the discussions at the exit meeting and our discussions on September 19, 1986 it is' our understanding that the following corrective actions will be taken by BG&E.

8610090480 861001 ADOCK0500g7 PDR F

1 of6Ki A b 3

', O

-gE3f

u.

i&

Baltimore G'as and Electric Company 2

1.

A remedial drill will be held by October 31, 1986 to demonstrate that appropriate corrective measures have been taken regarding the weak areas.

During the remedial drill the following emergency. response capabilities will be demonstrated:

Protective Action Recommendations will be formulated, communicated and updated based on plant conditions and/or offsite dose estimates.

Information will be effectively communicated between key managers relative to protective action decisionmaking.

Important parameters and reasons for decisions will be documented and updated accordingly.

Magnitude of radiological releases or potential releases (accident assessment) and the impact of these releases will be determined on a continuous basis (dose assessment including deposition and ingestion pathway).

2.

A review of the emergency response plan and procedures in those areas where weaknesses were identified will be conducted and appropriate changes will be drafted prior to the remedial drill.

3.

Specific training will be conducted as necessary prior to the remedial drill.

The balance of the emergency organization identified as needing additional training will be completed prior to the planned March 1987 drill.

If your understanding of these commitments does not agree with ours, please l

inform this office immediately.

The implementation of these actions will be l

subsequent follow-up inspections in this area will be conducted.

Sincerely, j

Original Signed By:

Thomas T. Martin, Director Division of Radiation Safety and Safeguards cc:

M. Bowman, General Supervisor, Technical Services Engineering Thomas Magette, Administrator, Nuclear Evaluations Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of Maryland (2) 1 A del (cCod (o

- - +

-em m.e-,-,.-

-7%---,.wws-,,-.-m.-n.,y

+,2m,

.-p-c

.._,-,r,m.-wr_.y

---..,,.v-,-,..y,w...

,-,,,,..,_m-.--..---..-.7-,.,

1,. -

4 Baltimore Gas & Electric Company 3

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief M. McBride, RI, Pilgrim T. Kenny, SRI, Salem D. Jaffe, LPM, NRR Robert J. Bores, DRSS RI:D RI:DRSk RI:DRSh(

/

R1 :DfSS RI:E

D Hawx'

/mlb Lazarus Bellamy Tbjartin Holody T

p 9M/86 9/M/86 9/p/86 98/86 9/29/86 j/