VERM)NT YANKEE NUCLEAR POWER STATION MONTH _Y STATISTICAL REPORT 87-01 FOR THE M) NTH OF..RNmRY,1987 r
8702180146 870210
~'
PDR ADOCK 05000271 R
PDR c.
s
i OPERATING DTTA REPORT DOCKET NO.
50-271 D4TE 870210 COMPLETED BY G.A. Wallin TELEPHONE (802) 257-7711 OPERATING STARJS Notes:
1.
Unit Name:
Vermont Yankee 2.
Reporting Period:
January 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe):514(oc) 504(cc) 6.
Maximum Dependable Capacity (Gross MWe):
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe): N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 744.00
- 12. Number of Hours Reactor was Critical 744.00 744.00 98214.73
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 744.00 95722.69
- 15. Unit Reserve Shutdown Hours O.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1182579.50 1182579.50 139858220.00
- 17. Gross Electrical Energy Generated (MWM) 401444.00 401444.00 46530278.00
- 18. Net Electrice Energy Generated (MWH) 385170.00 385170.00 44143846.00
- 19. Unit Service Factor 100.00 100.00 76.03
- 20. Unit Availability Factor 100.00 100.00 76.03
- 21. Unit Capacity Factor (using MDC Net) 102.72 102.72 69.57
- 22. Unit Capacity Factor (using DER Net) 100.72 100.72 68.21
- 23. Unit Forced Outage Rate 0.00 0.00 6.64
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):
NA\\
- 25. If shut dcwn at end of report period, estimated date of startup:
N/A
- 26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved INITIAL CRITICALITY VYDPF 0411.01 INITIAL ELECTRICITY Original C0mERCIAL OPERATION
)
j
AVERAGE DRILY UNIT POWER LEVEL 00CKET N]._
50-271 UNIT Vermont Yankee mTE 870210 COMPLETED BY G.A. Wallin TELEPW NE (802) 257-7711 W NTH January DAY AVERAGE DAILY POWER LEVEL MY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 519 17 518 2
519 18
-515 3
519 19 518 4
4 513 20 518 5
518 21 518-6 518 22 518 7
520 23 519 8
519 24 518 9
518 25 515 10 519 26 518 11 511 27 518 12 519 28 518 13 518 29 518 14 518 30 518 15 519 31 518-16 519 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for mch day in the reporting month. Compute to the nearest whole megawatt.
VYDPF 0411.02 0riginal
s DOCKET NO.
50-271 UNIT NAME Vermont Yankee D4TE 870210 UNIT 91UTDOWNS AND POWER REDUCTIONS COMPLETED BY G. A. Wallin TELEPK)NE (802) 257-7711 REPORT WNTH. January 1
2 3
4 5
No.
Date Type Duration Reason Method of License System Component Cause and Corrective Action to' (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report +
87-01 870111 S
0.00 B
4 N/A RB ZZZZZZ Power reduction for turbine bypass valve testing.
Power Reduction 3
4 1
2 F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions 1-Manual for Preparation of Data. Entry S-Scheduled B-Maintenance or Test 2-Manual Scram Sheets for Licensee Event C-Refueling 3-Automatic Scram Report.(LER) File (NUREG 0161)-
D-Regulatory Restriction 4-Other (Explain)
E-Operator Training and License Examination 5
F-Administrative Exhibit I - Same Source WDPF 0411.03 G-Operational Error (Explain)
Original H-Other (Explain) l
- +-
DOCKET to.
50-271 UNIT Vermont Yankee DATE 870210 COMPLETED BY G.A. Wallin TELEPf0NE (802) 257-7711
' REPORT M] NTH January SUMeRY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 99.8% of rated thermal power for the month.
Gross electrical generation was 401,'444 MWH or 99.9% of design e
electrical capacity.
Operating Summary The following is a chronological description of plant operations including other pertinent items of interest for the month:
At the beginning of the reporting period the plant was operating at 99.9% of rated _ thermal power.
870111 At 0033 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br />, reduced power to 80% to perform turbine surveillance.
(See Unit Shutdowns and Power Reductions) 870111 At 0225 hours0.0026 days <br />0.0625 hours <br />3.720238e-4 weeks <br />8.56125e-5 months <br />, completed turbine surveillance and a return to full power was started.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
WDPF 0411.04 Original
VERMONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR huh"r ROAD VERNON, VERMONT 05354 VYV 87- 017 February 10, 1987 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of January,1987.
Very truly yours, VERMONT YANKEE NUCLEAR POWER WRP.
W Warren P M p Vice President an Manager of Operations WPM /GAW/gnv:MSR1.1A4SR VYDPF 0411 Original v\\