Forwards SE Accepting Licensee Request for one-time Relief from GL 88-01 for Insp of Category E Welds at Plant,Unit 1 & 2
ML20210S882
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/03/1997
From: Le N
NRC (Affiliation Not Assigned)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20210S884 List:
References
GL-88-01, GL-88-1, TAC-M99172, TAC-M99185, NUDOCS 9709120178
Download: ML20210S882 (4)


Text

  1. f 0 - M /

pn (to

[= UNITE] STATES

f j

t NUCLEAR REGULATORY COMMISSION WAsHINoToN, D.C. 3055H001

%*,+p September 3,1997

}

u Mr. H. L. Sumner, Jr.

Vice President - Nuclear j

Hatch Project Southern Nuclear Operating Company, Inc.

P. O. Box 1295 Birmingham, Alabama 35201 1295

SUBJECT:

EVALUATION OF A ONE TIME RELIEF FROM GENERIC LETTER 88-01 INSPECTION FOR EDWIN 1. HATCH NUCLEAR PLANT, UNITS 1 AND 2 -

(TAC NOS, M99172 and M99185)

Dear Mr. Sumner:

By letter dated October 17,1995, as supplemented January 26, April 5, June 4, August 13, and November 18,1996, Georgia Power Company (GPC) submitted its third 10-year interval inservice inspection (ISI) program plan and associated requests for relief, and responded to the NRC staff's requests for additional information for the Edwin 1. Hatch Nuclear Plant (Hatch), Units 1 and 2.

The subject ISI program also identified the ASME Code relief requests, inspection commitments, and a revised inspection plan pertaining to the Generic Letter (GL) 88 01 commitment. The NRC staff, with technical assistance from its contractor, the Idaho N o;. si Engineering and Environmental Laboratory (INEEL), completed its evaluation of the information provided by GPC in support of the its third 10-year interval (ISI) program and associated relief requests for Hatch Units 1 and 2. The staff adopted INEEL's conclusions and recommendations presented in Technical Evaluation Report, INEL 96/0188, Revision 1, dated December 1996. By letter dated June 16,1997, the staff issued a safety evaluation (SE) and stated in the subject letter that the ISI program was acceptable for Hatch Units 1 and 2 as no deviations from regulatory requirements or commitments were identified.

However, the statement was erroneous because the inspection plan deviates from GPC's prior commitments regarding inspection in response to GL 88-01; furthermore, the revised GL 88-01 inspection plan has not yet been reviewed.

, The above situation wn brought to the staff's attention and GPC was informed that it Nm would take some time for the staff to complete the review of the revised GL 88-01 O$$ inspection plan. By letter dated July 30,1997, you requested an interim approval of the

$8 revised GL 88-01 inspection for two cycles of operation to support the performance of ISI

$$ inspection at Hatch Unit 1 during its upcoming refueling outage scheduled to start on g October 11,1997.

60 oO Based on the review of your July 30,1997, submittal, the staff finds that your request for P a one-time relief from GL 88-01 for the inspection of Category E welds at Hatch Unit 1 is

$g acceptable. However, the sample expansion guidelines for this inspection should continue gb to follow those of GL 88-01 and NUREG 0313, Revision 1, because the proposed sample expansion criteria in your submittal do not meet the intent of the guidance in GL 88-01, which is designed to ensure that there is no active deep crack in the repaired weld, i <' -9 '

^

. . . ]'l. , . l} .. FRC R]p nggggg m e

Mr. H. L. Sumner, Jr. 2-it should be noted that the approval of this one time relief from GL 88 01 for the inspection of Category E welds applies only to the upcoming refueling outage et Hatch Unit 1. Until the revitsd GL 88-01 inspection plan is approved by the NRC, all future intergranular stress corrosion cracking inspections at Hatch Units 1 and 2 should continue to. follow the guidelines in GL 88 01.- '

The NRC staff's related evaluation and conclusions are contained in the enclosed Safety Evaluation. This completes our action with respect to TAC Nos. M99172 and M99185.

Please contact me at (301) 4151458 if you have any questions regarding this matter.

Sincerely,

{x .

Ngoc B. (Tommy) Le, Project Manager

. Project Directorate ll 2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket Nos. 50 321 and 50 366 Enclosurei Safety Evaluation cc w/ encl: See next page

i

e.
  • Mr. H. L. Sumner, Jr. 2- September 3, 1997 it should be noted that the approval of this one timo relief from GL 88 01 for the inspection of Category E welds applies only to the upcoming refueling outage at Hatch Unit 1. Until the revised GL 88 01 inspection plan is approved by the NRC, all future intergranular stress corrosion cracking inspections at Hatch Units 1 and 2 should continue to follow the guidelines in GL 88-01.

The NRC staff's related evaluation and conclusions are contained in the enclosed Safety Evaluation. This completes our action with respect _to TAC Nos. M99172 and M99185.

Please contact me at (301) 415-1458 if you have any questions regarding this matter.

Sincerely, ORIGINAL SIGNED BY: l Ngoc B. (Tommy) Le, Project Manager Project Directorate ll 2

Division of Reactor Projects -l/II Office of Nuclear Reactor Regulation Docket Nos 50 321 and 50 366

Enclosure:

Safety Evaluation  :

cc w/ encl: See next page DISTRIBUTION:

Docket Files ACRS, TWF BBoger LBerry PUBLIC JJohnson, Ril JZwolinski . NLe PDil 2 R/F PSkinner, Ril . HBerkow THarris (e mail SE only)

OGC,0-15B18 MTschiltz, EDO WKoo TMcLellan

  • See related SE Memo from ESullivan to HBerkow dated 8/21/97 or Previous concurrence To receive a copy of this document, indicate in the box C = Copy w/o attacha,ent/ enclosure E = Copy with

. attachment / enclosure N = No copy OFFICE - PM:PD22 LA:PD22 C BC:EMCB* D$D)L ,

NAME. NLe:cn 'h LBerry' ESullivan H'p ekw' DATE 09/3/97 08/27/97 08/27/97 09/ 8/97

)OCKET NAME: G:\ HATCH \ HAT 99172.lSI OFFICIAL F ECORD COPY

Edwin 1. Hatch Nuclear Plant cc:

Mr. Emest L. Blake, Jr. Charles A. Patrizia, Esquire Shaw, Pittman, Potts Paul, Hastings, Janofsky & Walker

. and Trowbridge .

10th Floor 2300 N Street, NW. 1299 Pennsylvania Avenue  ;

Washington, DC 20037 Washington, DC 20004-9500 Mr. D. M. Crowe Chairman Manager, Licensing Appling County Commissioners Southem Nuclear Operating County Courthouse Company, Inc. Baxley, Georgia 31513 P. O. Box 1295 Birmingham, Alabama 352011295 Mr. W. G. Harriston, lil President and Chief Executive

- Resident inspector Ofhcor

- U.S. Nuclear Regulatory Commission Southem Nuclear Operating 11030 Hatch Parkway North Company, Inc.

Baxley, Georgia 31513 P. O. Box 1295

. Birmingham, Alabama 35201-1295 l Regional Administrator, Region ll U.S. Nuclear Regulatory Commission Mr. J. D. Woodard

- Atlanta Federal Oenter Executive Vice President 61 Forsyth Street, SW, Suite 23T85 Southem Nuclear Operating Ausnta, Georgia 30303 - Company, Inc.

P. O. Box 1295 Mr. Charles H. Badger Birmingham, Alabama 3520:-1295 Office of Planning and Budget Room 610- _

Mr. P. W. Wells l 270 Washington Street, SW, General Manager, Edwin 1. Hatch L Atlanta, Georgia 30334 Nuclear Plant Southem Nuclear Operating

. Harold Rehels, Director Company, Inc.

Department of Natural Resources P.- O. Box 439 205 Butler Street, SE., Suite 1252 Baxley, Georgia 31513 Atlanta, Georgia 30334 Mr. R. D. Barker Steven M. Jackson .

Program Manager Senior Engineer - Power Supply Fossil & Nuclear Operations Municipal Electric Authority Oglethorpe Power Corporation

- of Georgia - 2100 East Exchange Place 1470 Riveredge Parkway, NW . P. O. Box 134g Atlanta, Georgia 30328-4684 Tucker, Georgia 30085-1349 '