ML20210Q871

From kanterella
Jump to navigation Jump to search
Forwards Summary of 860910 Meeting W/Util in Atlanta,Ga Re Plant Safe & Alternate Shutdown Analysis & 861006-10 Shutdown & Fire Protection Insp.Attendance List Encl
ML20210Q871
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 09/26/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8610070057
Download: ML20210Q871 (6)


Text

.

Ob4 SEP 2 61986 1

Georgia Power Company t)dTN: Mr. J. H. Miller, Jr.

President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- V0GTLE_ UNIT 1, DOCKET NO. 50-424 This letter refers to the meeting conducted at your request in the NRC Region II Office on September 16, 1986. The purpose of this meeting was to discuss the safe and alternate shutdown analysis for Vogtle plant and the forthcoming safe shutdown and related fire protection inspection of Vogtle which is scheduled for October 6-10, 1986. Enclosed is a summary of the meeting topics and attendance list.

It is our opinion that this meeting was beneficial and provided for a better understanding of NRC's safe shutdown and fire protection inspecticn methodology and Georgia Power Company's safe shutdown analysis.

4 Should you have any questions concerning this meeting, we will be pleased to discuss them with you.

Sincerely, Criginal Signed by Roger D. Walker Roger D. Walker, Director Division of Reactor Projects

Enclosure:

Meeting Summary cp w/ encl:

M. P. O'Reilly, Senior Vice President Nuclear Operations cAf E. Conway, Senior Vice President &

Project Director LRf 0. Foster, Vice President, Project Support L)<'D. Rice, Vice President, Project Engineering yR'. H. Pinson, Vice President, Project yonstruction

f. T. Beckham, Vice President &

General Manager - Operations (cc w/ encl cont'd - See page 2) 8610070057 860926 PDR ADOCKOSOOOgg4 0

] E 4f5

/

SEP. 2 61986 Georgia Power Company 2

g(ccw/enclcont'd)

A. Thomas, Vice President,

_Jicensing tr. S. Read, General Manager,

~

ality Assurance W. Hayes, Vogtle Quality Assurance Manager

_[.C.Ramsey, Manager-Readiness Review d B. Bockhold, General-Manager, Nuclear Operations y Gucwa, Manager, Nuclear Safety and Licensing f.H.Googe, Project fonstruction Manager LV. D. Groover, Quality Assurance Site Manager -

L/. Construction A. Bailey, Project Licensing Manager t/f. F. Trowbridge, Esq., Shaw, i

id.Pittman,PottsandTrowbridge W. Churchill, Esq., Shaw, Jittman, Potts and Trowbridge tY. L. Blake, Jr., Esq., Shaw, Pittman, Potts and Trowbridge Z E. Joiner, Troutman, Sanders, J,4ckerman and Ashmore 1;K G. Ledbetter, Commissioner, Department of Human Resources

d. H. Badger, Office of Planning and Budget
  1. Kirkland, III, Counsel, Office of the Consumer's Utility Council d C. Teper, Georgians Against Nuclear Energy tff. B. Margulies, Esq., Chairman, Atomic Safety and Licensing Board

[r.anel

-P O. H. Paris, Administrative Judge Atomic Safety and Licensing Board Panel

4. A. Linenberger, Jr., Administrative Judge, Atomic Safety and Licensing Board Panel
d. P. Garde, Citizens Clinic, Director Government Accountability Project (bcc w/ encl - see page 3) l

SEP 2 61986 Georgia Power Company 3

c w/ encl:

. Reis, 0GC pW. M. Hill, IE J. Miller, NRR g.Brach,0GC t)t. Sinkule, RII g.Christnot,RII

,A R. Herdt, RII 7'. Conlon, RII

()( Miller, RII Wiseman, RII

. Fillion, RII Hunt, RII Nicholson, RII RC Resident Inspector Document Control Desk State of Georgia t

rih ej RII RII t

RII I4b V

on:bhg AHerdt VP ciera MS kule 9/

'86 9/p/86 9/(f/86 9

86

+3 i

ENCLOSURE MEETING

SUMMARY

Licensee: Georgia Power Company Facility: Vogtle Unit 1 Docket No.:

50-424 Facility License No.: CPPR-108 A meeting was held in the NRC Region II Office on September 16, 1986, to discuss Georgia Power's safe shutdown analysis for the Vogtle plant.

The licensee provided copies of the following preaudit information which had been requested by the Region II staff:

1.

Simplified P& ids showing systems required for hot and cold shutdown.

2.

List of safe shutdown equipment which identifies their plant location by fire zone and fire area.

3.

Equipment location drawings which show the locations of major mechanical and electrical equipment.

4.

Raceway and Cable Schedule computer program, EE580 printout which lists all safe shutdown circuits (includes spurious actuation circuits) and the raceways in which they are routed.

5.

Cable tray and conduit location drawings which indicate the physical layout.

6.

One line diagrams which show AC and DC power sources for plant equipment.

7.

Fire area drawings which identify the fire area and fire zone boundaries and fire protection equipment locations.

8.

Lighting and communications location drawings.

The emergency lights required for safe shutdown have been highlighted in yellow. Safe shutdown and access paths have been marked in red on a set of site and floor plans.

-9.

A sample separation and spuricus actuation analysis calculation.

10.

Fire Event Safety Shutdown Evaluation Summary Report, Control Room Fire Alternate Shutdown Evaluation Study No. X4S001, and Fire Event Safe Shutdown Evaluation Control / Repair Station Listing.

11.

Procedure 18038-1, which is the abnormal operating procedure for operation from remote shutdown panels.

12.

Procedure 92005-C, which is the general fire response procedure.

(.

l Enclosure 2

4 4

13.

Procedure 92839-C, Zone 139 (AREA 1-AB-LD-B) FUEL HANDLING - BUILDING -

LEVEL 1 FIRE FIGHTING PREPLAN which is an example of a pre-fire plan.

14.

Procedure 27579-C, EMERGENCY DIESEL GENERATOR FUEL OIL PUMP STARTER REPAIRS is a post fire repair procedure.

Attachment:

Attendance List i

.i -

4-I l

1 i

?

i l

f I

f i

i f

{

i i

.I 4

.. ~,....

ATTACHMENT ATTENDAhCE LIST Attendance at the Georgia Power - NRC Meeting on September 16, 1986, at the NRC Region II Office.

Georgia Power Company J. Hartka, Nuclear Safety and Licensing W. F. Kitchens, Nuclear Operations Superintendent B. Sloan, Nuclear Operations R. A. Sprankle, Fire Protection Engineer Southern Company Services R. L. George, Project Engineering Manager i

J. McLeod, Nuclear Safety and Fuel Licensing J. Maddry, Fire Protection Engineer Bechtel M. L. Larson, Mechanical (Fire Protection) Engineer D. L. Love, Electrical Engineer B. Woodley, Fire Protection Engineer NRC Region II

  • T. E. Conlon, Chief, Plant Systems Section M. D. Hunt,. Electrical. Engineer P. J. Fillion, Electrical Engineer W. H. Miller, Jr., Fire Protection Engineer L. E. Nicholson, Reactor Engineer

- G. W. Wiseman, Fire Protection Engineer

.e

  • Part-Time e_

,, _ _