Corrects NRC 870106 Safety Evaluation Re Conformance to Reg Guide 1.97.Instrumentation Installation Schedule Not in Agreement w/850716 Confirmatory Order.Unit 1 Equipment Must Be Operable by Spring 1988 Startup & Unit 2 by Fall 1988
ML20210N957
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/09/1987
From: Mcneil S
Office of Nuclear Reactor Regulation
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8702130255
Download: ML20210N957 (3)


Text

~I s

February 9, 1987- "

Distribution Docket Nos. 50-317

$0ectatlfJed.D.

PKreutzer.

and 50-318 NRC/ Local PDR SMcNeil FMiraglia ACRS(10)

PBD-8 Reading.

-OGC-Beth BGrimes NThompson Mr. J. A. Tiernan JPartlow Vice President-Nuclear Energy EJordan Baltimore Gas & Electric Company Gray File 3.2a P. O. Box 1475 Baltimore, MD 21203

Dear Mr. Tiernan:

SUBJECT:

CORRECTION TO SAFETY EVALUATION DATED JANUARY 6, 1987 CONCERNING CONFORMANCE TO REGULATORY GUIDE 1.97 In our letter of January 6,1987, a safety evaluation was issued for Calvert Cliffs Units 1 and 2 concerning your conformance to regulatory guide 1.97.

In this safety evaluation it was stated that you shall have the following instrumentation installed and operable for both units "at the first scheduled outage of sufficient duration, but no later than startup following the spring 1988 Unit 1 refueling outage":

Safety injection accumulator tank level or pressure narrow range containment sump water level containment sump water temperature component cooling flow to the engineered safety features system.

This schedule was in error as it was not in agreement with the requirements of the July 16, 1985 confirmatory order, " Order Modify License Confirming Additional Licensee Commitments on Emergency Response Capability (Supplement 1 to NUREG-0737)".

In accordance with this confirmatory order, the schedule for installing and making operable the instrumentation, above, shall be as follows:

l Unit 1 - Prior to startup following the Cycle 10 refueling outage (estimated.to be spring 1988).

Unit 2 - Prior to startup following the Cycle 9 refueling outage (estimated to be fall 1988).

We apologize for any concerns this error may have caused.

Sincerely,

/s/

8702130255 870209 Scott Alexander McNeil, Project Manager PDR ADOCK 05000317 PWR Project Directorate #8 P

PDR Division of PWR Licensing-B cc: See next page P8D- :

P80-8:

P80-8:

P[

tzer SM M.jch AThadani 9/[/87 X/ (,/87

/

87 i

/

1 Mr. J. A. Tiernan Baltimore Gas & Electric Company-Calvert Cliffs Nuclear Power Plant-cc:

Mr. William T. Bowen, President Regional Administrator, Region I Calvert County Board of U.S. Nuclear Regulatory Commission Commissioners Office of Executive Director Prince Frederick, Maryland 20768 for Operations 631 Park Avenue D. A. Brune, Esq.

King of Prussia, Pennys1vania 19406 General Counsel Baltimore Gas and Electric Company P. O. Box 1475

(

Baltimore, Maryland 21203 Jay E. Silberg Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. M. E. Bowman, General Supervisor Technical Services Engineering.

~

Calvert Cliffs Nuclear Power Plant MD Rts 2 & 4, P. O. Box 1535 Lusby, Maryland 20657-0073 Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box 437 Lusby, Maryland 20657-0073 Bechtel Power Corporation ATTN: Mr. D. E. Stewart Calvert Cliffs Project Engineer 15740 Shady Grove Road Gaithersburg, Maryland 20760 Combustion Engineering, Inc.

ATTN:

Mr. W. R. Horlacher, III Project Manager P. O. Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Department of Natural Resources Energy Administration, Power Plant Siting Program ATTN: Mr. T. Magette Tawes State Office Building Annapolis, Maryland 21204 i

.c -

February 9, 1987 Distribution i

Docket Nos. 50-317 Docket File PKreutzer and 50-318 NRC/ Local PDR SMcNeil FMiraglia ACRS(10) i PBD-8 Reading OGC-Beth l

BGrimes NThompson Mr. J. A. Tiernan.

JPartlow Vice President-Nuclear Energy EJordan Baltimore Gas & Electric Company Gray File 3.2a P. O. Box 1475 Baltimore, MD 21203

Dear Mr. Tiernan:

SUBJECT:

CORRECTION TO SAFETY EVALUATION DATED JANUARY 6, 1987 CONCERNING CONFORMANCE TO REGULATORY GUIDE 1.97 In our letter of January 6,1987, a safety evaluation was issued for Calvert 4

Cliffs Units 1 and 2 concerning your conformance to regulatory guide 1.97.

In this safety evaluation it was stated that you shall have the following instrumentation installed and operable for both units "at the first scheduled outage of sufficient duration, but no later than startup following the spring 1988 Unit 1 refueling outage":

1

~

Safety injection accumulator tank 1evel or pressure narrow range containment sump water level containment sump water temperature component cooling flow to the engineered safety features system.

This schedule was in error as it was not in agreement with the requirements of the July 16, 1985 confirmatory order, " Order Modify License Confirming Additional Licensee Commitments on Emergency Response Capability (Supplement 1

~

to NUREG-0737)".

In accordance with this confirmatory order, the schedule for installing and making operable the instrumentation, above, shall be as follows:

Unit 1 - Prior to startup following the Cycle 10 refueling outage (estimated to be spring 1988).

Unit 2 - Prior to startup following the Cycle 9 refueling outage (estimated to be fall 1988).

We apologize for any concerns this error may have caused.

Sincerely,

/s/

Scott Alexander McNeil, Project Manager PWR Project Directorate #8 Division of PWR Licensing-B cc: See next page PBD :