ML20210N825

From kanterella
Jump to navigation Jump to search
Forwards Documents Referenced in 860409 Response to Violations Noted in Insp Rept 50-414/86-08,Item 2,to Aid in NRC Review.Info Includes QA Assessment of Const Adequacy-IE Bulletins 79-02 & 79-14
ML20210N825
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/18/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20210N829 List:
References
IEB-79-02, IEB-79-14, IEB-79-2, NUDOCS 8605050268
Download: ML20210N825 (1)


Text

.

Duxe POWER GOMPANY

. e.o. nox muan CHAMLOTTE, N.C. 28242 HALH. TUCKER TE LE N* E p Noty:mu

m. m April 18,.1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Connaission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

Subject:

RII:SJV Catawba Nuclear Station 50-414/86-08

Dear Dr. Grace:

In order to facilitate your review of our response to Violation No.

50-414/86-08-02, dated April 9, 1986, we are transmitting herewith copies of certain documents which were referenced in our response. is our letter of November 20, 1984 to your office, which transmitted Duke Power Company's evaluation of certain inspector identified pipe support discrepancies. Attachment 2 is a Duke Power Company Document entitled " Quality Assurance Assessment of Construction Adequacy-IE Bulletins 79-02 and 79-14", which consists of a review and assessment of Catawba's compliance with these two Bulletins as they pertain to construction.

Very truly yours, G

Hal B. Tucker LTP: sib Attachments xc: NRC Resident Inspector Catawba Nuclear Station i

8605050268 860418 PDR ADOCK 05000414 O

PDR 110l