ML20210N426

From kanterella
Jump to navigation Jump to search
Forwards Errata to SALP Repts 50-454/86-01 & 50-455/86-01 for May 1984 - Oct 1985,per 860203 Meeting & Issues App Summarizing Meeting & Including Names of Attendees as Final Step in SALP Process
ML20210N426
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/30/1986
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20210N430 List:
References
NUDOCS 8605050035
Download: ML20210N426 (2)


See also: IR 05000454/1986001

Text

Mb

C

.

APR 3 01986

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP) 5

Board Report for the Byron Nuclear Station and our meeting of February 3,1986,

which discussed the contents of the report.

Based on the formal exchange of information between our respective staffs, and

in the absence of formal written comments from you requiring resolution, only

one minor change to the report is necessary.

This change is identified on the

enclosed errata sheet.

A corrected page is included for insertion into your

copy of the report.

Enclosed, as an Appendix to the SALP Board Report, is a summarization of our

meeting which includes names of those persons in attendance.

Issuance of the

Appendix serves as the final step in the SALP process.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter with the

referenced attachments, will be placed in the NRC's Public Document Room.

No reply to this letter is required; however, should you have questions on the

Appendix to the report, or if you need clarification, please let us know and

we will be pleased to discuss them with you.

Sincerely,

Ct!;inM sI;;:;2d !>y

A. T r L'Y1! c

B605050035 860430

James G. Keppler

e-

DR

ADOCK 05000454

Regional Administrator

PDR

Attachments:

1.

Appendix to SALP 5 Board Report

No. 50-454/86001; No. 50-455/86001

2.

Errata Sheet

3.

Corrected Page(s) to Report

See Attached Distribution

e

RII

RIII

Rg

Jh

RIIIf>Td

R

R

/

Pe

n/mj

Sc

z

Nore us Pap

iello

Walrnick$afs6

y y2

Le'ch

"Forney

r

>

</n/tb

gz,

Y 23

i

[

81

h@epler

I

Hi

'Da is

K

IYN

(

lgtf()

,L

- - - _ -

- - - . . _ ,

- . - - - , - _ .

. - . - .

.

- -

- . - . - - - ~ . . - - . . - -

..

.

..

.

.

Commonwealth Edison Company

2

Distribution

cc w/ attachments:

D. L. Farrar, Director

of Nuclear Licensing

-

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

I

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

'

Steve Lewis, ELD

L. 01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

J. M. Taylor, Director, IE

H. R. Denton, Director, NRR

Regional Administrators

RI, RII, RIV, RV

N. J. Palladino, Chairman

j

J. K. Asselstine, Commissioner

F. M. Bernthal, Commissioner

T. M. Roberts, Commissioner

L. W. Zech, Commissioner

'

NRR Project Manager

H. L. Thompson, NRR

J. Axelrad, IE

RIII PRR

RIII SGA

State Liaison Officer, State

of Illinois

'

INPO

1

r- + - ~, - - , ~ , , , , , . . , , - - , - , , , . , , , -

, , - - , , -

,,-,r,-,--

,---_------,r,--,,----,-

-- - *-

-.p.,,---e,-,

,

- --

-w-

w w- r

-