ML20210N426
| ML20210N426 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 04/30/1986 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20210N430 | List: |
| References | |
| NUDOCS 8605050035 | |
| Download: ML20210N426 (2) | |
See also: IR 05000454/1986001
Text
Mb
C
.
APR 3 01986
Docket No. 50-454
Docket No. 50-455
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the NRC's Systematic Assessment of Licensee Performance (SALP) 5
Board Report for the Byron Nuclear Station and our meeting of February 3,1986,
which discussed the contents of the report.
Based on the formal exchange of information between our respective staffs, and
in the absence of formal written comments from you requiring resolution, only
one minor change to the report is necessary.
This change is identified on the
enclosed errata sheet.
A corrected page is included for insertion into your
copy of the report.
Enclosed, as an Appendix to the SALP Board Report, is a summarization of our
meeting which includes names of those persons in attendance.
Issuance of the
Appendix serves as the final step in the SALP process.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter with the
referenced attachments, will be placed in the NRC's Public Document Room.
No reply to this letter is required; however, should you have questions on the
Appendix to the report, or if you need clarification, please let us know and
we will be pleased to discuss them with you.
Sincerely,
Ct!;inM sI;;:;2d !>y
A. T r L'Y1! c
B605050035 860430
James G. Keppler
e-
DR
ADOCK 05000454
Regional Administrator
Attachments:
1.
Appendix to SALP 5 Board Report
No. 50-454/86001; No. 50-455/86001
2.
Errata Sheet
3.
Corrected Page(s) to Report
See Attached Distribution
e
RII
RIII
Rg
Jh
RIIIf>Td
R
R
/
Pe
n/mj
Sc
z
Nore us Pap
iello
Walrnick$afs6
y y2
Le'ch
"Forney
r
>
</n/tb
gz,
Y 23
i
[
81
h@epler
I
Hi
'Da is
K
IYN
(
lgtf()
,L
- - - _ -
- - - . . _ ,
- . - - - , - _ .
. - . - .
.
- -
- . - . - - - ~ . . - - . . - -
..
.
..
.
.
Commonwealth Edison Company
2
Distribution
cc w/ attachments:
D. L. Farrar, Director
of Nuclear Licensing
-
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R. E. Querio, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
I
D. W. Cassel, Jr., Esq.
Diane Chavez, DAARE/ SAFE
'
Steve Lewis, ELD
L. 01shan, NRR LPM
H. S. Taylor, Quality Assurance
Division
J. M. Taylor, Director, IE
H. R. Denton, Director, NRR
Regional Administrators
RI, RII, RIV, RV
N. J. Palladino, Chairman
j
J. K. Asselstine, Commissioner
F. M. Bernthal, Commissioner
T. M. Roberts, Commissioner
L. W. Zech, Commissioner
'
NRR Project Manager
H. L. Thompson, NRR
J. Axelrad, IE
RIII PRR
RIII SGA
State Liaison Officer, State
of Illinois
'
1
r- + - ~, - - , ~ , , , , , . . , , - - , - , , , . , , , -
, , - - , , -
,,-,r,-,--
,---_------,r,--,,----,-
-- - *-
-.p.,,---e,-,
,
- --
-w-
w w- r
-