. pa At Y
l ge UNITED STATES i
}
NUCLEAR REGULATORY COMMISSION 2
WASHINGTON D.C. 30666 0001 August 14, 1997 Mr. H. B. Barron Vice President, McGuire Site Duke Power Company 12700 Hagers Ferry Road Huntersville, NC 28078-8985
SUBJECT:
REVIEW OF PRELIMINARY ACCIDENT SEQUENCE PRECURSOR ANALYSIS OF OPERATIONAL CONDITION AT MCGUIRE NUCLEAR STATION, UNIT 2
Dear Mr. Barron:
Enclosed for your review and comment is a copy of the preliminary Accident Sequence Precursor (ASP) analysis of an operational condition, which was discovered at McGuire Nuclear Station, Unit 2, on March 6,1996 (Enclosure 1),
and was reported in Licensee Event Report (LER) No. 370/96-002. This analysis was prepared by our contractor at the Oak Ridge National Laboratory (ORNL).
The results of this preliminary analysis indicate that this event may be a precursor for 1996.
In assessing operational events, an effort was made to make the ASP models as realist'.c as possible regarding the specific features and response of a given plant to various accident sequence initiators. We realize that licensees may have additional systems and emergency procedures, or other feature: at their plants that might affect the analysis. Therefore, we are providing you an opportunity to review and comment on the technical adequacy of the preliminary ASP analysis, including the depiction of plant equipment and equipment capabilities. Upon receipt and evaluation of your comments, we will revise the conditional core damage probability calculations where necessary to consider the specific information you have provided. The object of the review process is to provide as realistic an analysis of the significance of the event as possible.
In order for us to incorporate your comments, perform any required reanalysis, and prepare the final report of our analysis of this event in a timely manner, you are requested to complete your review and to provide any comments within 30 days of receipt of this letter. We have streamlined the ASP Program with the objective of significantly improving the time after an event in which the final precursor analysis of the event is made publicly available. As soon as our final analysis of the event has been completed, we will provide for your information the final precursor analysis of the event and the resolution of your comments.
In previous years, licensees have had to wait until 4
publication of the Annual Precursor Report (in some cases, up to 23 months g I; y [j after an event) for the final precursor analysis of an event and the resolution of their comments.
We have also enclosed several items to facilitate your review.
contains specific guidance for performing the requested review, identifies the criteria that we will apply to determine whether any credit should be given in the analysis for the use of licensee-identified additional equipment or 9708210315 970814 PDR ADOCK 05000370
Mr. H. B..Barron l l
specific-actions in recovering.from the event, and describes the specific.
information that you should provide to support such a claim. is a copy of LER No. 370/96-002, which documented the event.
Please contact me at (301) 415-1484 if you have any questions regarding this request. This request is covered by the existing OMB clearance number (3150-0104) for NRC staff followup review of events documented in LERs.
Your response to this request is voluntary and does not constitute a licensing requirement.
Sincerely, f
V ctor Herses, Senior Project Manager roject Directorate 11-2
-Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-370
Enclosures:
_ As stated (3) cc w/encis:
See next page J
. ~.
J*
Mr. H. B. Barron August 14, 1997 specific actions in recovering from the event, and describes the specific information that you should provide to support such a claim. is a copy of LER No. 370/96-002, which documented the event.
Please contact me at (301) 415-1484 if you have any questions regarding this request. This request is covered by the existing OMB clearance number (3150-0104) for NRC staff followup review of events documented in LERs.
Your response to this request is voluntary and does not constitute a licensing requirement.
Sincerely.
ORIGINAL SIGNED BY H. BERK 0W FOR:
Victor Nerses, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-370
Enclosures:
As stated (3) cc w/encls:
See next page Distribution Docket File OGC 0-15 B18 SMays PUBLIC ACRS, T-2-E-26 P0'Reilly PD 11-2 Rdg.
JJohnson, RII MBoyle l
BBoger SShaeffer, RII l
l l
l To rc:elve a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" =
C py with attachment / enclosure "N" = No copy l
OFFICE Ptf(I$-2 j LA:PDil-h Dj#Df 2,l l
NAME-yNer$%
LBerry iO
,NBer)j w' DATE
@)$7
'$ / )\\ /97 \\ / W/j '$/97
/
/97
/
/97
/
/97 JOCUMENT NAME: A:\\MGS96STD.PRL OFF CIAL RECORD COPY i
l e,
e.
-Mr. H. B. Barron August 14, 1997 specific actions in recovering from the event, and describes the specific information that you should provide to support such a claim. is a copy of LER No. 370/96-002, which documented the event.
Please contact me at (301) 415-1484 if you have any questions regarding this request. This request is covered by the existing OMB clearance number (3150-0104) for NRC staff followup review of events documented in LERs.
Your i
response to this request is voluntary and does not constitute a licensing requirement.
Sincerely, ORIGINAL SIGNED BY H. BERK 0W FOR:
Victor Nerses, Senior Project Manager Project Directorate 11-2 Division of Reactor Projects-- I/II Office of Nuclear Reactor Regulation Docket No. 50-370
Enclosures:
As stated (3) cc w/encis:
See next page Distribution Docket File OGC 0-15 B18 SMays PUBLIC ACRS, T-2-E-26 P0'Reilly PD 11-2 Rdg.
JJohnson, RII MBoyle BBoger SShaefftr, RII To rIceive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E"
=
Ctpy with attachment / enclosure "N" = No copy OFFICE Plf$ L-23 l
LA:PDll-b DfDf%
NAME-VNer$ 5%
LBerry iR3
.HBerb w' DATE
@ p/97
$ / h /97 \\ i 7/j 'S/97
/
/97
/ /97
/
/97 DOCUMENT NAME: A:\\MGS96STD.PRL OFFICIAL RECORD COPY
.j McGuire Nuclear Station Units =l~and 2 CC:
Mr. Paul R. Newton Ms. Karen E. Long legal Department (PB05E)-
Assistant Attorney General Duke Power-Company-North Carolina Department of 422 South Church Street Justice Charlotte : North Carolina 28242-0001 P. O. Box 629 Raleigh, North Carolina 27602 County Manager of Mecklenburg County
^
720 East Fourth Street Mr. G. A. Copp
- Charlotte, North Carolina 28202 Licensing - EC050 Duke Power Company MichaeliT. Cash 526 South Church Street 2
Regulatory Compliance Manager _
Charlotte, North Carolina-28242 L
Duke. Power Company McGuire Nuclear Site Regional Administrator, Region II
,12700 Hagers Ferry Road U.S.: Nuclear Regulatory Commission Huntersville, North Carolina 28078 Atlanta Federal Center 61 Forsyth Street, S.W., Suite 23T85 J. Michael McGarry, III, Esquire:
Atlanta, Georgia _ 30303 Winston and Strawn 1400 L-Street, NW, Elaine Wathen. Lead REP Planner i
Washington, DC _20005-Division of Emergency _ Management 116 West Jones Street 4
Senior Resident Inspector Raleigh, North Carolina 27603-1335 c/o U. S. Nuclear Regulatory Commission Mr. Richard M. Fry, Director L
12700 Hagers Ferry Road Division of Radiation Protection i-Huntersville -North Carolina 28078
- North Carolina Department of Environment, Health and Natural F
Mr._ Peter R. Harden, IV
-Resources-L Account Sales Manager 3825-Barrett Drive Westinghouse Electric-Corporation
-Raleigh, North Carolina 27609-7721-Power Systems Field Sales P. O. Box 7288 Mr. T. Richard Puryear
. Charlotte, North Carolina 28241
-Owners Group (NCEMC)
F 4
Duke Power Company Dr. John-M. Barry 4800 Concord Road Mecklenberg County York, South Carolina 29745
-Department of: Environmental
-Protection
_700 N. Tryon Street-f LCharlotte, North Carolina 28202 J
j-I
I i,
- 4 LER No. 370/96-002
- LER No. 370/96-002 Event
Description:
2B Emergency Diesel Generator Inoperable due to Slow instrumentation Response Date of Event: March 6,1996 Plant: McGuire Umt 2 Event Summary McGuire Unit 2 was at 100% power when the 2B Emergency Diesel Generator (EDG), which was undergoing a scheduled operating test, tripped on a low lube oil pressure signal shortly after starting (Ref.1). The test failure was the result of air entrainment into the instrument line for the lube oil piping combined with low room temperature. Personnel deternuned that these conditions (air ingress and cold room temperature), which were deemed sufficient to cause the 2B EDG to trip, existed for a combined total of 540 h. (The 540 h total was distributed over four separate occasions where the 72 h single EDG outage allowed by Technical Specifications was exceeded.) This long-term ur. availability of the 2B EDG could have impacted the units' response to a loss of-ofisite power (LOOP). The estimated increase in the core damage probability (CDP) over the 540 hour0.00625 days <br />0.15 hours <br />8.928571e-4 weeks <br />2.0547e-4 months <br /> period for this event (i e., the importance) is 4.3 x 104. The base probability of core damage (the CDP) for the same period is 1.7 x 104 Event Description Unit 2 was at 100% power on February 6,1996. The 2B EDG was scheduled for a non prelubricated start test. ' The 2B EDG reached 95% of rated speed in 9 s (Ref. 2). The 2B EDG tripped on a " Low Lube Oil Pressure" signal 30 s later (39 s after starting the EDG). Indicated pressure was 15 20 psig and decreasing; normal operating pressure is 40 psig.' However, personnel determmed that the low lube oil pressure indication was false. The low pressure indication resulted from a slow instrument response due to air entramment into the instrument line for the lube oil piping, coupled with the low EDG room temperature. (An inadequate design of the instrument lines allowed for air to be introduced into the system. The lube oil pressure switch impulse line for the 2B EDG is approximately 70 ft long. The hcensee ia&aH that this length is conrblered
. excessive.) The cool EDG room temperature added to the slow instrument response by increasing the-viscosity of the oil in the instrument line. Since the " Low Lube Oil Pressure" trip signal is not bypassed on an emergency start of the EDGs, the failure was classified as a valid test failure.
The lowest recorded EDG room t+ature in the 7 d precedmg the EDG failure to start was 62'F. EDG room temperature was 68'F just prior to the test. On March 6,1996, the licensee deternuned that the 2B EDG should be considered to be inoperable with the current instrument line can'iguration when the EDG -
room temperature is less than 71'F and the "Before and After"(B&A) lube oil pump is not running Based on this criteria, all other station EDGs were determined to be operable at the time the 2B EDG failed its operating test. Based on a review of the log books containing the EDG room temperature readmgs, the licensee calculated that the 2B EDG was susceptible to this type of failure for a total of 666 h. Because the =
1
e J
t LER No. 370/96-002 B&A lube oil pump runs for 15 min during each hour, the licensee estimated that the 2B EDG was susceptible to this type of failure only 75% of the time-a total of 499.5 h. NRC inspectors,in NRC Inspection Report 50 370/96 02 (Ref. 2), noted that previous EDG trips occurred while the B&A lube oil pump was runmng.
Therefore, the NRC inspectors discounted the assumption that running a B&A lube oil pump at the time of a start demand with the EDG room temperature below 71 *F would have prevented this type of failure of the EDO to start. The NRC inspection report tallied the amount of time above 72 h, per occurrence, that the room temperature dropped below 71'F and determined that the four susceptibility periods totaled 540 h.
Additional Event-Related Information McGuire Nuclear Station maintains a Safe Shutdown Facility (SSF) designed to provide an alternate and independent means to achieve and maintain hot standby conditions (Ref. 3). The facility includes an EDG that can be utilized to operate a positive displacement pump to supply seal injection water to the reactor coolant pump (RCP) seals, preventing a RCP seal loss-of coolant accident (LOCA). Credit for the SSF is included in the ASP models via the LOOP iritiating event frequency, operator nonrecovery probabilities, and the RCP seal failure probability.
The most important recovery action with respect to this condition assessment is the possibility of restoring ac power to Unit 2 from Unit I via a cross tie, given a station blackout at Unit 2. Because procedures exist detailing this operation, it is considered to be a viable option. Recovery via the cross-tic is included in the LOOP recovery probabilities discussed below.
There was a brief period (5.3 h) when both EDGs were technically out of service due to maintenance activities on Motor Control Center IEMXH 1, which affected ventilation. The 2A EDG was functionally available and would have been able to perform its design function. Technical Specifications allow both EDGs to be out of service for up to 8 h.
Modeling Assumptions Similar to the licensee's analysis of this event (Ref.1), the failure probability of the 2B EDG was set to 1.0 (TRUE) for this condition assessment.
The licensee indicated that if an actual failure to start occurred under circumstances similar to the conditions that existed since February 6, then a second start attempt would likely be successful (Ref.1). Therefore, the emergency power non-recovery probability (EPS-XHE NOREC) was adjusted from 0.8 to 0.34, as shown in Table 1, to reflect the fact that the equipment appeared recoverable and was accessible (Recovery Class 2).
The 2B EDG failure appears to be a failure mode unique to the physical setup of the lube oil pressure instrumentation lines on the 2B EDG. A similar failure of the 2A EDG was documented by special report 25 months earlier (Ref. 4). The length of time between events and consequently, the number of successful surveillance tests between events, indicates that the two failures were random rather than because of any common-cause effects. Consequently, the common-cause failure probability for the EDGs was not adjusted from the nommal value of 1.1 x 10 shown in Table 1.
4 2
J LER No. 370/96-002 During the 5 h period that both EDGs were declared unavailable, the 2A EDG was functionally available and would have been able to perform its design function. This 5 h period was not considered separately when calculating the increase in the CDP over the entire 540-h period because the importance (i c., the increase in the CDP)is less than the ASP cut off value of 1.0 = 10 4 The possibility of preventing a seal LOCA using the SSF and the possibility of providing ac power via the cross tic are factored into the following LOOP parameters:
IE LOOP LOOP Initiating Event Frequency, which includes short-term recovery actions, including cross-ticing between units OEP.XHE-NOREC 2H Operator Fails to Recover Offsite Power Within 2 h OEP XHE-NOREC 6H Operator Fails to Recover Offsite Power Within 6h OEP XHE NOREC-BD Operator Fails to Recover Offsite Power Before Battery Depletion OEP XHE NOREC SL Operator Fails to Recover Offsite Power During Seal LOCA RCS MDP LK SEALS RCP Seals Fail.
The probability of SSF failure is 0.36 based on information in the plants' Indwidual Plant Examination (Ref. 5). It was assumed that at least 30 min would be required to staff the SSF. It was also assumed that personnel could cross tic the power buses at Unit I with the buses at Unit 2 in under I h 5% of the time, and within 2 h 95% of the time. The LOOP parameters were then calculated using a lognormal distribution for the SSF failure probability; and a Weibull distribution for the LOOP initiating event frequency, the operator non recovery probabilities, and the RCP seal failure probability [per ORN11NRC/LTR 89/11 (Ref. 6)]. [The LOOP initiating event frequency accounts for the failure to statT the SSF within 30 min, as well as the failure of the SSF itself. Hence, the failure of the SSF is not specifically indicated in the results ]
Analysis Results The increase in the CDP (i.e., the importance) over a 540-h period for this event is 4.3 x 104 This is over the nominal CDP of 1.7 x 10 The donunant core damage sequence for this event (scauence 28 on Fig.1) 4 involves a postulated LOOP, a successful reactor trip, a failure of emergency power.
success of the auxiliary feedwater (AFW) system, no challenge to the power operated relief valves (PORVs),
a RCP seal LOCA, and a failure of the operators to restore ofTsite power.
This sequence accounts for 29% of the total contribution to the increase in the CDP. Sequence 37 is similar to LOOP sequence 28, except LOOP sequence 37 involves a PORV lift and successful re-closure. Combined, these two sequences account for 46% of the total contribution to the increase in the CDP (Table 2). Core damage in these two sequences is the result of a RCP seal LOCA. Core damage results from a failure of l
3
i LER No. 370/96-002 AFW in one other sequence (27% of the increase in the CDP) and results from battery depletion in two additional sequences (20% of the increase in the CDP).
Acronytas AFW auxiliary feedwater system B&A before and after lube oil pump CCDP conditional core damage probability CDP core damage probability EDG cmcrgency diesel generator LOCA loss of coolant accident LOOP loss-of-offsite power NRC Nuclear Regulatory Commission PORV power-operated relief valve PWR pressurized water reactor RCP reactor coolant pump SGTR steam generator tube rupture SLOCA small break LOCA SSF safe shutdown facility TRANS transient References
- 1. LER 370/96 002, Rev. O, "Past Inoperability of Emergency Diesel Generator 2B Due to Low Lube Oil Pressure Caused by Unanticipated Interaction of Systems and Components" March 29,1996.
- 2. NRC Inspection Report No. 50-370/96-02, inspection Conducted: March 11,1996 - April 1,1996.
- 3. AnalSafety Analysis Report, McGuire Nuclear Station.
4.
Special Report 94-01, " Diesel Generator Special Report," Duke Power Company, McGuire Nuclear Station, PIP 2 M94 0242, March 15,1994.
- 5. McGuire Nuclear Station,lndwidualPlant Examination.
4-
LER No. 370/%002 ll 5555858888855885588885585888585585888888
....~..s cessetssannnanatanasanasannae lll i l1l i
[ll I
l il l ill i 1ll 1
illi :
till :
ill! :
1lll l i
n11 g
g e
I
! I h,
Il i i
lf l l1 1 8
111 g
lit ;
Ii !
Fig. 2 Dommant core damage sequence for LER No. 370/96-002.
5
LER No. 370/96-002 Table 1. Definitions and Probabilities for Sektled Basic Events for LER No.370/96-002 Modified Event Base Current for this name Description probability probability Type event IE LOOP trutiating Esent-Loss-ofofTaite 1.6 E 005 1.6 E 005 No Power (LOOP)
IE-SGTR Initiating Event-Eteam Generator 1.6 E-006 1.6 E@6 No Tube Rupture IE SLOCA laitiating Event-SLOCA 1.0 E 006 1.0 Ec06 No IE-TRANS Initiating Event-Transient 5.3 E-ON 5.3 E.ON No (TRANS)
AFW-TDP-FC 1 A AFW Turbine-Dnven Pump fails 3.a E 002 3.2 E 002 No AFW X11E NOREC EP Operator Fails to Recoser AFW 3 4 E 001 3 4 E 061 No During a Station Blackout EPS-DON CF ALL Common-Cause Failure of EDO:
1.1 E 003 1.1 E@3 No EPS-DGN FC I A Diesel Generator A fails 4.2 E 002 4.2 E 002 No EPS-DGN FC IB Diesel Generator B Fa.ls 4.2 E 002 1.0 E4000 TRUE Yes EPS XilE-NOREC
' O 4 ator Fails to Recour 1.0 Ee 3 4 E 001 Yes Emergency Power OEP XllE NOREC-2il Operator Fails to Recover Offsite 7.6 E 002 7.6 E-002 No Power Within 2 h OEP-XilE NOREC 611 Operator Fails to Recover Offsite 3.6 E-002 3.6 E-002 No Power Within 6 h OEP-XIIE NOREC BD Operstor Fails to Recoser OfTsite 8.5 E-003 8.5 E 003 No Power Before Battery Depletion OEP-X11E-NOREC SL Operator Fails to Recover Offsite 5.4 E 001 5.4 E 001 No Power Dunng a Seal LOCA PPR SRV-CO SBO PORVs Open Dunng a Station 3.7 E 001 3.7 E-001 No Blackout PPR SRV-OO.PRVI PORV I Fails to Reciose 2.0 E-003 2.0 E 003 No PPR-SRV OO.PRV2 PORV 2 Fails to Reclose 2.0 E 003 2.0 E 003 No PPR SRV-OO PRV3 PORV 3 Fails to Reclose 2 0 E-003 2.0 E-003 No RCS-MDP-LK SEALS RCP Seals Fail Without Cooling 3 4 E 002 3.4 E-002 No and Injection Water Table 2. Sequence Conditional Probabilities for LER No.370/96-002 1
6 l
l
LER No. 370/96-002 4
l Conditional Event tree Sequence core damage Core damage Importance Percent name number probability probability (CCDP-CDP) contribution *
(CCDP)
(CDP)
LOOP 28 1.5 E 006 3.0 E-007 1.2 E 006 29.2 LOOP 39 1.4 E-006 2.8 E-007 1.1 E-0%
27.1 LOOP 37 8.9 E 007 1.7 E-007 -
7.1 E 007 17.0 LOOP 21 6.6 E 007 1.3 E 007 5.3 E 007 12.8 LOOP 30 3.9 E 007 7.7 E 008 3.1 E 007 7.4 LOOP 38 2.8 E 007 5.6 E-008 2.3 E-007 5.5 Total (all sequences) 6.0 E-006 1.7 E-006 4.3 E-006
' Percent contribution to the total importance.
t 7
4 i
w
LER No. 370/96-002 l
Table 3. Sequence Logic for Dominant Sequences for LER No. 370/96-002 Event tree name Sequence Logic number LOOP 28
/RT L, EP,/AFW L EP,/PORV SBO, SEALLOCA,OP SL LOOP 39
/RT L, EP,/AFW L EP, PORV SBO,
/PORV EP,SEALLOCA,OP SL LOOP 2I
/RT L, EP,/AFW L EP,/PORV-SBO,
/SEALLOCA, OP BD LOOP 30
/RT-L, EP, /AFW L EP, PORV-SBO,
/PORV EP,/SEALLOCA, OP BD LOOP 38
/RT L, EP, /AFW-L-EP, PORV-SBO, PORV EP Table 4. System Names for LER No.370/96-002 System name Logic AFW-L EP No or Insufficient AFW Flow During a Station Blackout EP Failure of Both Trains of Emergency Power OP BD Operator Fails to Recover OfTsite Power Before Battery Depletion i
OP-SL Operator Fails to Recover Offsite Power Dunng a Seal LOCA PORV EP PORVs Fail to Reclose (No Electric Power)
PORV-SBO PORVs Open Durmg a Station Blackout RT L Reactor Fails to Trip During a LOOP SEALLOCA RCP Seals Fail During a LOOP 4
8
e g
LER No. 370/96-002 Table 5. Conditional Cut Sets for Higher Probability Sequences for LER No. 370/96-002 Cut set Percent number contribution CCDP' Cut sets' LOOP Sequence 28 1.5 E-006 a
^
l 97.4 1.5 E.,06 EPS-DON-FC I A. EPS-DON FC 1B, EPS-XIIE-NOREC,
/PPR SRV40 SBO, RCS-MDP-LK SEALS,OEP X1tE NOREC-SL LOOP Sequence 39 1,4 E-006 v.
I 96.8 1.3 E 006 EPS-DGN FC-1A. EPS-DGN FC 1D, EPS-X1tE NOREC, AFW TDP-FC 1A, AFW X11E-NOREC-EP LOOP Sequence 37 8.9 E 007 I
97.4 8.4 E 007 EPS-DGN FC l A, EPS-DGN FC-1B, EPS-X11E NOREC, PPR SRV-CO SBO, /PPR SRV OO PRVI,/PPR SRV OO.PRV2,
/PPR SRV-OO.PRV3, RCS-MDP LK SEALS, OEP X}lE-NOREC SL LOOP Sequence 21 6.6 E 007 1
97.4 6.4 E-007 EPS-DGN-FC 1 A, EPS-DGN-FC 1B, EPS-X1tE-NOREC,
/PPR SRV CO SBO,/RCS-MDP-LK SEALS, OEP XIIE NOREC BD LOOP Sequence 30 3.9 E 007
~
4 1
97.4 3.7 E-007 EPS DGN FC 1 A, EPS-DGN FC.IB EPS-XFIE NOREC, PPR SRV-CO SBO,/PPR SRV OO PRV1,/PPR SRV OO-PRV2,
/PPR SRV OO PRV3, /RCS-MDP-LK SEALS, OEP X11E-NOREC BD LOOP Sequence 38 2.8 E-007
'm 1
32.5 9,1 E 008 EPS DGN-FC I A, EPS DGN-FC 18. EPS-XilE NOREC, PPR SRV CO SBO, PPR SRV.OO PRVI
-2 32.5 9.1 E-008 EPS-DGN-FC 1A, EPS-DGN-FC 1B, RIPS-XIiE-NOREC, PPR SRV-CO SBO, PPR-SRV OO-PRV2 3
32.5 9,1 E 008 EPS-DGN-FC l A, EPS-DGN-FC-1B, EPS-XilE-NOREC, PPR-SRV CO-SBO, PPR SRV-OO PRV3 Total (all sequences) 6.1 E-006 M'
X2 ~
- lhe CCDP is determined by multiplying the probability that the portion of the sequence that makes the precursor visible (e.g., the system with a failure is demanded) will occur during the duration of the event by the probabilities of the remaining basic events a the minimal cut set. This can be approximated by 1 - e*, where p is determined by multiplying the expected number ofinitiators that occur during the duration of the event by the probabilities of the basic events in that mmimal cut set. The expected number ofinitiators is given by
' 1t, where 1 is the frequency of the initistag event (given on a per-hour basis) and t is the d r tiu a on time of the event (540 h). This approximation is conservative for procursors made visible by the initiating event. 'Ibe frequencies of interest for this event are:
9
LER No. 370/96-002 l
b - 5.3 ' 10%, Aw - 1.6 = 10 /h Asun - 1.0 = 10 4 h, and A m - 1.6 = 10 /h. The importance is determined by subtracting
=
d
/
d the CDP for the same period but with plant equipnent assumed to be operating nominally.
M event EPS DON FC lB is a type TRUE event. This type of event is not normally included in the output of the fault tree reductka
. process. This event has been added to aid in understandsng the sequences to potential core damage associated with the event.
10
t L.. '
6 GUIDANCE FOR LICENSEE REVIEW 0F PRELIMINARY ASP ANALYSIS
Background
The preliminary precursor analysis of an operational event that occurred at your plant has been provided for your review. This analysis was performed as i
a part of the NRC's Accident Sequence Precursor (ASP) Program.
The ASP Program uses probabilistic risk assessment techniques to provide estimates of operating event significance in terms of the potential for core damage.
The types of events evaluated include actual initiating events, such as a loss of off-site power (LOOP) or loss-of-coolant accident (LOCA), degradation of plant conditions, and safety equipment failures or unavailabilities that could increase the probability of core damage from postulated accident sequences.
-This preliminary analysis was conducted using the information contained in the plant-specific final safety analysis report (FSAR), individual plant examiaation (IPE), and the licensee event report (LER) for this event.
Modeling Techniques The models used for the analysis of 1995 and 1996 events were developed by the Idaho National Engineering Laboratory (INEL).
The models were developed using the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) software.
The-models are based on linked fault trees.
Four types of initiating events are considered: (1) transients, (2) loss-of-coolant accidents (LOCAs), (3) losses of offsite power (LOOPS), and (4) steam generator tube ruptures (PWR only).
Fault trees were developed for each top event on the event trees to a supercomponent level of detail.
The only
-support system currently modeled is the-electric power system.
The models may be modified to include addition.al detail for the systems /
components of interest for a particular event. This may include additional equipment or mitigation strategies as outlined in the FSAR or IPE.
Probabilities are modified to reflect the particular circumstances of the event being analyzed.
Guidance for Peer Review Comments regarding the analysis should address:
Does the " Event Description" section accurately describe the event as it occurred?
Does the " Additional Event-Related Information" section provide accurate e
additional information concerning the configuration of the plant and the operation of and procedures associated with relevant systems?
Does the "Modeling Assumptions" section accurately describe the modeling o
-done for the event?
Is the modeling of the event appropriate for the events that occurred or that had the potential to occur under the event conditions? This also includes assumptions regarding the likelihood of equipment recovery.
Ehclosure 2
~. -.
l
l e
Appendix H of Reference 1 provides examples of comments and responses for previous ASP analyses.
Criteria for Evaluating Comments Modifications to the event analysis may be made based on the comments that you provide.
Specific documentation will be required to consider modifications to the event analysis. References should be made to portions of the LER, AIT, or other event documentation concerning the sequence of events.
System and component capabilities should be supported by references to the FSAR, IPE, plant procedures, or analyses. Comnents related to cierator response times and capabilii.ies should reference plant procedures, t1e FSAR, the IPE, or applicable operator response models. Assumptions used in determining failure probabilities should be clearly stated.
criteria for Evaluating Additional Recovery Measures Additional systems, equipment, or specific recovery actions may be considered for incorporation into the analysis. However, to assess the viability and effectiveness of the equipment and methods, the appropriate documentation must be included in your response.
This includes:
normal or emergency operating procedures.'
piping and instrumentation diagrams (P& ids),'
electrical one-line diagrams,'
results of thermal-hydraulic analyses, and operator training (both procedures and simulator),' etc.
Systems, equipment, or specific recovery actions that were not in place at the time of the event will not be considered.
Also, the documentation should address the impact (both positive and negative) of the use of the specific recovery measure on:
the_ sequence of events, the timing of events, the probability of operator error in using the system or equipment, and other systems / processes already mod led in the analysis (including operator actions).
For example, Plant A (a PWR) experiences a reactor trip, and during the subsequent recovery, it is discovered that one train of the auxiliary feedwater (AFW) system is unavailable. Absent any further information regrading this event, the ASP Program would analyze it as a reactor trip with one train of AFW unavailable.
The AFW modeling would be patterned after information gathered either from the plant FSAR or the IPE.
However, if information is received about the use of an additional system (such as a standby steam generator feedwater system) in recovering from this event, the transient would be modeled as a reactor trip with one train of AFW unavailable, but this unavailability would be
- Revision or practices at the time the event occurred.
l 9
.;.. e i
mitigated by the use of the standby feedwater system. The mitigation effect for the standby-feedwater system would be credited in the analysis provided that the following material was avoilable:
standby feedwater system characteristics are docamented in the FSAR or accounted for in the IPE, procedures for using the system during recovery existed at the time of the event, the plant operators had been trained in the use of the system prior to the event, a clear diagram of the system is available (either in the FSAR, IPE, or supplied by the licensee) -
previous analyses have indicated that there would be sufficient time available to implement the procedure successfully under the circumstances of the event under analysis, the effects of using the standby feedwater system on the 07eration
.andrecoveryofsystemsorproceduresthatarealready-inciudedin the-event modeling.
In this case, use of the standby feedwater system may reduce the likelihood of recovering failed AFW equipment or initiating feed-and-bleed due to time and persennel constraints.
Materials Provided for Review The following materials have been provided in the package to facilitate your review of the preliminary analysis of-the operational event.
The specific LER, augmented inspection team (AIT) report, or other pertinent reports, e'
A summary of the calculation results. An event tree with the dominant sequence (s) highlighted.
Four tables in the analysis indicate:
(1) a summary of the relevant basic events,-including modifications to the probabilities to reflect the circumstances of the event, (2) the dominant core-damage sequences, (3) the system names for-the systems cited in the dominant core damage sequences, and (4) cut sets for the dominant core damage sequences.
Schedule
- Please refer to the transmittal letter for schedules and procedures for submitting your comments.
References 1.
_L. N. Vanden-Heuvel et al., Precursors to Potential Severe Core Damage Accidents: 1994, A Status Report, USNRC Report NUREG/CR-4674 (ORNL/NOAC-232) Volumes 21 and 22, Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory and Science Applications International Corp.,
December 1995.
I
' -l. t p
a Due herCommny T C McMun McCuve Nuclear Generotton Depamnenr
%ct hesndent I!700Hafen fem RoadtVG01\\P)
(IN4?k%0 Huntersalle..\\C2507&UL5 (IN4ik509Far DUKEPOWER DATE:
April 2, 1996 U.S. Nuclear Regulatory Commission Document Centrol Desk Washington, D.C.
20555 Subject McGuire Nuclear Station Unit 2 Docket No. 50-370 Licensee Event Report 370/96-02, Revision 0 Problem Investigation Process No.:
2-M96-0331 Gentlemen Pursuant to 10 CFR 50.73 Sections (a) (1) and (d), attached is Licensee Event Report 370/96-02, Revision 0, concerning past inoperability of Emergency Diesel Generator 2B.
This report is being submitted in accordance with 10 CFR 50.73 (a) (2) (1) (B).
This event is considered to be of no significance with respect to the health and safety of the public.
Very truly y urs, jT/R#~ '
T.C. McMeekin JWP/gts Attachm nt
./
cc Mr.
S.D. Ebneter
~INPO Records Center Administrator, Region II Suite 1500 U.S.
Nuclear Regulatory Commission 1100 Circle 75 Parkway 101 Marietta St.,
NW, Suite 2900 Atlanta, GA 30339 Atlanta, GA 30323 Mr. Victor Nerses Mr. George Mascwell U.S.
Nuclear Regulatory Commission NRC Resident Inspector Office of Nuclear Reactor Regulation McGuire Nuclear Station Washington, D.C.
20555 mces 1 gams MQp ++
5 ffgp
.-e-~'"
3 acws= 3
1 bxc B. L. Walsh (EC110)
E. L._ Taylor -(CNS9 G. A.
Copp (EC050)
J. I. Glenn (MG02ME)
P..R. Herran (MG01VP)
C. B. Davis (MG01CP)
J.
E.
Burchfield (ONS Reg Compliance)
G. H. Savage (EC06E)
G. B. Sv4ndlehurst (EC11-0842)
C. M. Misenheimer (EC08I)
R.
F. Cole (ECOSN)
J. M. Frye (EC05N)
T. G. Becker (PB02L)
P. M. Abraham (EC08I)
R.
B. White (MG01VP)
L. V. Wilkie (ONO3SR)
D. P. Kimball (CN05SR)
K. L. Crane (MG01RC) e
,R.
N. Casler (EC05N)
NSRB Support Staff (EC05N)
)
NRC FORM 304 y & NyctlAR RgOuttyORy CouangvON apngOYED ST OndS NO. 316641to EXMRES0#3erto E StiuATE0 0URDEN PrR RESPONSE TO COMPLY wifM Tiet UANCAtoRy sNFORuaf SON COLLECitON REQvE$7 50 0 HR$
LICENSEE EVENT REPORT (LER)
REPORTED LESSONS LEARNED ARE INCORPORATE 0 iNTO THE uCENsmo PaOCEss aNo Fro SACR To eusrRv FoawARo COuu(Nil REGAR0tNG BURDEN ESiluATE TO THE INFORuAtiON AND RECORD $ uANAGEugNT BRANCH (T4 F13) W $ NUCLEAR REGULATORv COuut&$60N. WA$peNG10N. DC #05564001. AND TO THE 'APERWORet REDUCilON PsiCUECT OtS4090sk CeFICE OF FACluTY NAME (1) waNa".f uf NY ANf5 popcET wa$wwotON DC P%o3 McGuire Nuclear Station, Unit 2 loOcEtNuusERm PAGE o>
l05000 370 1 OF 8 TITLE (4)
Past inoperabihty Of Emergency Diesel Generator 28 Due To Low Lube Oil Pressure Caused By Unanticipated in Systems And Components.
EVENT DATE (5)
LER NUMBER (6)
REPORT D ATE (7)
OTHER F ACILITIES INVOLVED (4) e,m vu pas vt aa vt aa se wsww na viso.
esmvu ca, vaan saccre waws DOCKET NuuSER(5) eonesa emmega 05000 03 06 96 96 02 0
01 29 96 N/A 05000 OPERATING THa$ RE PORT IS SUOVITTFD PURSUANT TO THE REQUtREuENTS OF 10 CFR (Checar ces or more ot the foA,.wcMit' teo0E (9) j 20 402(b) 20 405(c) 50 73(aK2Krv) 73 T1(b)
POWEA 20 405(a K t)D) 60 36(cx1) 50 7hax2Xv) 73 7t(c)
LEVEL (101 100 %
20 405 tax 1x.)
50 3s(ex2) 60 7haK2 Hun)
OTHER (SpectPy n i
sM&i %
20 405(a)(1xus)
X 507xax2xa 507xaK2xv.xA) destracio.4= and
~
h
- b
'D 20 a054aX t Hrv) 50 FAsK2)(a) 50 73(aW2)(vmHB) n Taaf. NRC Fonti h*#1. Y s e.
20 40Hs M t Wwl 50 7Naw?)f n) 50 73(sM2Mu) 366A)
LICENSEE CONTACT FOR THIS LER (17)
NAME TELEPHONE NUuBER ARE A CODE J. W. Pitesa (704) 875-4788 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBFO IN THis REPORT f13)
CAUSE SYSTEM COMPONENT MANUFACTURER REPORTA8J lbf CAUSE SysTIu COMPONENT MANUFACTURER REPORTA8tJ 70 NpADS T
70 NPROS
.: q
)
2*
EEBtoA IDISSW C753 No w
B6 EEBLOA IDISSW U075 No aM SUPPLEMENTAL REPORT EXPECTE0 04)
EXPECTED MONTH DAY YEAR X
sueuissioN VEs (t ns corvere (KPECTED SUBM!$SION DA Tf]
NO DATE 05)
A:stRACT rLat no H00 spaces, o e approscu.ety Meen segoe space twowntren enes)(16)
Unit Status:
Unit 2 was in Mode 1(Power Operation) at 100 percent power.
Evcnt
Description:
On February 6, 1996, during the performance of a ccheduled operability test involving a non-prelubed start of Emergency Diesel Gsnarator (EDG) 2B, the EDG tripped after approximately 39 seconds due to a low lube oil pressure indication.
Investigation of this event revealed that tha indication was false, and had resulted from slow instrumentation response duo to excessive air entrainment coupled with low EDG room temperature.
Intdequate design for the associated impulse lines led to the air entrainment.
On March 6, 1996, it was determined that periods existed when EDG 2B was past inoperable.
For reporting purposes it was assumed the inoparable period exceeded the Technical Specifications limiting condition.
In feet. the EDG was not continuously inoperable during these periods.
A nimilar failure had occurred on EDG 2A on February 15, 1994.
The impact of air entrainment coupled with low EDG room temperature on the speed of pressure indication response was not considered as significant when formulating corrective actions associated with the 1994 event.
Evcnt Causet This event is assigned a cause of Design Deficiency due to unanticipated interaction of systems and components.
Carrcctive Action:
Corrective actions include increased frequency for periodic venting and implementation of modifications to the impulse lines for these instruments on all EDGs.
UA asfuaA Pttha atony COhnmE50,16 A8Phovte tv Case seo. passim senc Fo8w an6A -
wi ax=s.,==
E$TIMAT(o $VRD(es P(R RC$poN$( 1000MMY MTH THis MANDATORY eN80RMATION COLitCT10N REQUEST 90 0 HR$ 8EPORTED Li&aONS LICENSEE EVENT REPORT (LER) tt Aa~ao Aar acoRaoaaTeo'~to Twi ter=si~o Process ANo no SACR TO INDUSTRY FOR*AA0 COMMENTS REGAR00seG BURD TEXT CONTINUATION t
(74 F33t U $ esOCLEAR REGULATORY COMaal&sost was#4NQfQN, DC
- 0566 0,00t. AND TO THE PAPERWORK REpuCTION PROJECT (3tweiost ossac os uaNactwtNT ano tivnorT wassigotou oc ynno3 F ACILITY NAME (t)
DOCKEi NUMBER (2)
LE'R NUMBER f6)
PAGE (31 vgAR stoutwnAt afvissoN wvween w
esuumEn McGuire Nuclear Station Unit 2 05000 370 96 t
02 0
2 OF 8 EVALUATION:
Description of Event On February 6, 199i5, Unit 2 was in Mode 1(Power Operation) at 100 percent power.
Operations (OPS) personnel were running procedure PT/2/A/4350/028, Diesel Generator 2B Operability Test, involving a non-prelubed start of Emergency Diesel Generator (EIIS:DG) (EDG) 2B.
This test is required twice a year and is performed in August and February to test temperature extremes.
After verification of prerequisites, the EDG 2B start sequence was initiated per enclosure 13.1 of the procedure.
The EDG started, and the time to reach 95 percent speed, as indicated an the EDG control panel (EIIS:PL), was noted to be acceptable.
- At that time the Operator running the test heard the EDG slowing down and then observcd that it had tripped.
He also noted the annunciator (EIIS: ANN) for " Low Lube Oil Pressure" on the EDG control panel was lit.
The EDG Engine Lube Oil (LD) system (EIIS:LA) pressure as indicated on control pane'. pressure gauge [ETIS:PI) 2LDPG 5130, was at 15-20 psig and decreasing (normal operating pressure is 40 psig).
The Operator then notified Control Room (EIIS:NA) OPS personnel, and Engineering personnel of the EDG trip.
- Initial investigations found no problems with the associated circuitry, and it was concluded that the EDG had most likely tripped due to a low LD system pressure indication at approximately 39 seconds, as designed.
This trip is considered a " valid failure" because the
- Low Lube Oil Pressure" trip is not bypassed during an emergency start.
Special Report 96-001 was submitted to the NRC on March 07, 1996, as required to document this failure.
1
e l
e ',,
- c n= mA v s atAR moaatoRv cc.ms.a~.
=w, o aiwi
=>
tmRts tam t simeAftD evRDEN PER M SPONst 10 CouMv witM tMit taANoAtoRY LICENSEE EVENT REPORT (LER)
- N5oapAf*0N COLLEC710s. REQUE $1 SC 0 hrs REPORfW d 8 SONS te AaNco An i~CoaeoaArto Nto rwe oceNsaa mets ANo rto TEXT CONTINUATION.
is,,wiio,STRY. roRwARO COWMENTS feEGAR0peo SURDEN SAC.I fo iN00 ne,,on.Ario. ANo ncoRos A An oc.,i.RAue,,
itira os NucttARRtoutAtoRvConussa wAs oto oc 2055$ 000i. AND to THE P APE RVv0 Ret R(OUC710N PROJECT i3154410a1 08ncf 08 WANAGEuf a T AND Sut4{t wAsmo?ON Oc posos F ACluTY NAME (1) s
(>OCKET NUMBER (2)
L ER NUMBER ftd PAGEft vt AR stoutwfiat MvisON uvuera wouera McGuire Nuclear Staten. Unit 2 05000 370 96 02 O
3 OF C Further investigation by OPS, Engineering, and Maintenance personnel revealed that the low LD system pressure indication was false and had resulted from slow response by the associated instrument loop.
The cause of the slow response was further determined to be primarily due to inadequate design of the associated instrument impulse lines which creates the possibility for air to be introduced into the This coupled with increased viscosity of the oil caused by system.
low EDG room temperatures caused the oil pressure instrumentation response to be slowed significantly.
Based on past operating experience at McGuire Nuclear Station and information obtained from other utilities, it was determined that long impulse lines in conjunction with low EDG room temperatures have caused similar problems in the past.
The total length of the pressure switch impulse line for EDG 2B is approximately 70 feet. The lowest recorded room temperature in the seven days preceding this event was approximately 62 degrees F, but had risen to approximately 68 degrees F at the time of the test.
Testing was performed to determine the impact of these findings on EDG operability.
Based on the results of this testing, on March 6, 1996, EDG 2B was determined to be "Past Operable"- for periods with the room temperature >/= 71 degrees F, and for periods when the Before and After Lube Oil Pump (EIIS:P) was running (runs for 15 min out of each hour).
However, the EDG was determined to be "Past Inoperable" for periods with the room temperature < 71 degrees F when the Before and After Lube Oil Pump was not running.
Using this criteria, all other EDGs were determined to have been past operable.
A detailed review of the EDG 2B room temperature trend showed that EDG 2B had experienced some periods in excess of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> when the room temperature was < 71 degrees F.
As noted in the above paragraph, EDG 2B was o;.erable for at least 15 minutes of each hour during these low temperature periods.
However, for reporting purposes, the EDG was assumed to be potentially inoperable in excess of the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Limiting Condition For Operation (LCO) for one EDG inoperable.
Review of the operability of EDG 2A during those times revealed that the only concurrent inoperability occurred on January 4, 1996, when motor control center (EIIS:MCC) 1EMXH-1 was removed from service for maintenance.
Train A of the Nuclear Service Water (RN) system
)
V I
' t l
, c,,,u
~
~
- vi ucteukoum.cc~ues t
a>= n g g iewim n,,=,io.
..t, o~u, ooc, m,,,,.
,o.,
LICENSEE EVENT REPORT (LER) woneafiONCott CiCN atout$1 topwas ntPonitoLAL& Chi it'a~t o aat acc~oaut o ato m ucta$>* *m.v.si ao r t
TEXT CONTINUATION saca townvitav soa noco w tinso aae m.
istiatno w uoaate *w accoaos =~4os utur ea ~c m #a y s
- vet Aa asopoar couwstica wasw%,os oc 0,06 RC6. ANo fo THf PArt Mvcan AtDUCTON P8vMC1 tniSHip F0 rz.cury haut m se t es una",tutNt awn pM.rt waewetow pg pg r
tocktT WMN R m jf R NWN A fM PAM @
_ i stouturm
, $a agesc=
w)vnt a w su 1R McGuire Nuclear Station. Unit 2 05000 370 96 02 0 0 4 OF 8 (EIIStBI) and EDG 2A were declared technically inoperable during that maintenance period.
They were functionalhe available during this period and would have been able to perform their design functions.
Duration of the technical inoperability wA3 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and 17 minutes which is less than the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Technical Specification LCO time for two EDGs inoperable.
On March 6, 1996, the NRC was notified of the violation of the Technical Specification in accordance with procedure RP/0/A/5700/10, NRC Immediate Notification Requirements.
Conclusion This event did not result in any uncontrolled releases of radioactive material, personnel injuries, or radiation overexposures.
The event is not Nuclear Plant Reliability Da:a System (NPRDS) reportable.
-This event is assigned an NFC -*.use code of Design Deficiency, resulting in an-unanticipated interaction of components.
The design of the impulse lines for the LD system pressure o
instrumentation associated with this event creates the possibility that air will be introduced into the system.
i t
t Initial observation of EDG 2B indicated that little air was emitted o
from the impulse line for the pressure instrumentation when it was s
vented.
However, during extensive testing of EDG 2B, conducted on March 5, 1996, a significant amount of air was found to be in the impulse line, as observed from the main control panel vent and the individual instrument vents.
Following this extensive venting, the.
EDG 2B LD system pressure instrumentation response improved I
dramatically.
This indicates that air entrainment is the primary
)
contributor to the trip of EDG 2B on February 6, 1996.
l Low EDG room temperatures cause low oil temperature in the impulse o
line, which increases oil viscosity, and slows instrumentation response to pressure transients when coupled with air entrainment.
This was evidenced by slow pressure increase ac indicated on the EDG 2B Control Panel Gauge at reduced room temperatures, but improved response at higher room temperatures.
The results from testing performed show that the combination of these o
factors (air entrainment and-low room temperatures) causes pressure b
t.
weic f onu ansa u s wuctran nLGutATOHV c'=6bov$
Q Appmorto av pass no sieseine LAMatt$ tWated iltMAtto tumDEN Pts hl680N58 foCouptf witw twiguANDAtomy LICENSEE EVENT REPORT (LER)
- N80nualcN CottictcN atout St 60 0 wRt REPontto tt bSONS tt asto Aao~cu*oaattoato t t uaas*Pmciss A~oeto TEXT CONTINUATlON 6ACK totNoul'Rf Fof8*AADCouWtW 8 MiGAM ist.An io tot,~,oauAt.o~ A asc'oaos.otNo ksmC44 c Aoi It eea vs wuctsAmatoutAtoavcowssion wAssinoton oc Ptapaaos Awo tD tut PAPlaWOH.L Af DuCTOv PscAct mb>0ios FLC8UTV NA.JL (14 Derict et use.aa,turist Awp oote,rt wa4H'NG'M tr FSDi POCKETffUMBER(h ti A NUVfit R (6)
PAOF (7i vs Am 6e Out8vfiAL RE vi&Os
. m era
. met a McGuire Nuclear Station, Unit 2 05000 370 9el d
02 k
0
$ OF 8 response of the instrumentation to be slowed more than had previously been concluded.
Although similar failures had occurred in the past, the results of this combination of factors had not been previously understood.
A review of the Operating Experience Program (OEP) and Problem Investigation Process (PIP) data bases for the past 24 months revealed that a similar failure '..ad occurred on EDG 2A on February 15, 1994, as documented on Special Report 94-001 and PIP 2-!!94-0242.
During the evaluation of that event, the impact of low EDG room temperature on the speed of pressure indication responce was considered, but determined to not be a significant factor.
Therefore, the corrective actions taken at the time of that event did not fully address the problem as it is now known, and were not adequate to prevent recurrence.
This event is considered to be recurring.
CORRECTIVE ACTION:
Immediate:
- 1. Troubleshooting was performed on the associated circuitry to determine the cause of the failure.
- 2. The Lube Oil Full Flow Filter Bypass Valves [EIIS:V) (Units 1 and 2LD-0108A, and-Units 1 and 2LD-Oll3B) were manually opened to ensure maximum LD system header pressure response during an EDG start.
5.A Conditional Operability statement was issued for EDG 2B to require performance of a Semi-Daily Surveillance to ensure maintenance of EDG room temperature > 75 degrees F and LD system keepwarm temperature >
115 degrees F per OPS Special Order 96-02.
Subsequent:
j' s.
j er assic song sep -
u & evucts AR RtGutA1ORv Coun44KsMi6 69)
Arretovte av case eso. Sit 64ste tAmfit8OWaste
($tmAtt o tunot 4 Pt R RtisPONSE TO CoWP4V Wit ( tWl %94pATORy LICENSEE EVENT REPORT (LER) tt aaNto.0N CoLitCtiON MoutSt 60 0 HRt nr.>ontio LitsCovl aN50sevat:
M acon outtoutotH e C. tomoustu,oawanooc it Ct.% Pooct ist-it so t i oa 47 cm...t no Maano,%.unot
,to TEXT CONTINUAT ON Co o.
.ci
.n NC,,
(14 f Mt U S NUCLE AA MouLAtOHV Cohan48& son n ASHIN010N. DC 706W041. ANo t0 tHE PArt mWOHN MDUCt10N PACtitCT (3tto$10st F ACitlTY esAME (1)
N 8 ett N usa.a*.t ut Nt Anti punot t wa $**NGTCW (C P0601 DOCKET teWBE R (2)
L f 4 MA8BF R (6)
PAGF (3)
,taa uoutNt= 3 alva oN wuunta m.un a.,
n.
McGuire Nuclear Station. Unit 2 h
05000 370 96 D
02 0
6 OF 8_
l.A conditional Operability statement was issued for Unit 2 EDGs to require performance of a Semi-Daily Surveillance to ensure maintenance of EDG room temperature > 75 degrees F.
a.'
- 2. The Unit 1 Operator Rounds Sheet was revised to ensure maintenance of EDG room temperature between 75-85 degrees F.
- 3. Engineering personnel conducted further investigations and testing to determine the exact cause of the failure.
- 4. The periodic maintenance tasks for flush and vent of the LD system pressure loops for all EDGs was changed from an aanual to a quarterly frequency and improved guidance was added within the tasks to ensure proper venting.
- 5. Engineering personnel initiated periodic testing of the LD system impulse lines on all EDGs for degradation.
Planned:
- 1. Nuclear Station Modifications will be performed to shorten the impulse lines and move the pressure instrumentation for both Unit 1 and 2 EDGs.
2, Engineering personnel will evaluate the results of the modifications on LD system performance and adjust for degradation and periodic maintenance tasks for flush and ventthe frequency of period accordingly.
SAFETY ANALYSIS:
Based on this analysis, this event is not considered to be significant.
At no time were the health and safety of the public or plant personnel affected as a result of this event.
Th EDGs are required to start and run to support Engineered Safety Feature (ESP) loads to mitigate an accident involving a Loss of Offsite Power (LOOP).
FSAh Chapter 15 contains the analysis of several accidents assuming the LOOP event.
The primary event of interest is the LOOP event as an initiating event.
The existing McGuire Probabilistic Risk Assessment (PRA) assumes the frequency of LOOP events to be 0.07 events per year.
j' to 4
W fOMW wha.
e W) u 8 NucLt am atoutAtcriv Couus&&fr>de Arraovt0 DV OIst NQ $1994194 l
(AmeMS $pwte
($ twit D eunut N Pim mt &PONSE 10 Cousty vetu tHig uANoatoav LICENSEE EVENT REPORT (LER) 6Nf CHW AtiON COLit Ctetse M out St 60 0 HAS M Poatt D LE S$0NS tt a~to AM aconPoaArio ~to rut uctNi~o Paocesi aso no TEXT CONTINUATION BACK to WDutt#v FOa* ARD COWW Nil inmit to rnt i,oau.t.au A~o nteo.MGANawa D.umatN oi ANAcc
.n 9..uco n 4 *m u s Nucit An moutatoav ComssioN war,.woto= oc Ral&4001 AND to THE PAPtmwoAN MDOCitON PAO,ftC1(31604104)
FACluTV NAMC (ti ossert or uANAot utkt a~0 tour.f t wagwmf> pc yeo3 DOCK [1 NUMS[R (2) t t A Nm8M A W PAGFf31 vt a4 64 Out NTiAL I..
M vibioN w nueir a 1-
- wt a McGuire Nuclear Station, Unit 2 05000 370 96 h
02 0
7 OF 8 The particular failure associated with this event is a failure of the EDG 2B to start and run on demand due to a false low lube oil pressure indication.
During all time periods that EDG 2B was susceptible to failures of this nature, the 2A EDG was functionally available.
Should EDG 2A fail following a LOOP and the EDG 2B fail to start and run, a variety of means are available to mitigate the LOOP.
Some examples of these are as follows:
0 OPS personnel could try to restart EDG 2B since the failure only involves a slow impulse line response.
O At McGuire there are two shared 4160V auxiliary transformers which can power the 4160V buses from either Unit.
These transformers would be available except for a L(OP involving both Units.
Based on industry data, LOOP to more than one unit occurs in only 17 percent of all LOOP events.
O Assuming both EDGs failed following the occurrence of a LOOP and failures of power from the other unit, from power run back, and from recovery of offsite power, the Unit could still be maintained in a safe shutdown condition with the use of the Standby Shutdown Facility (SSF), which can supply the Reactor Coolant (EIIS:AB) Pump Seal Injection and provide Stean.
Generator (EIIS:SG) cooling by means of the Turbine (Ells:TRB]
Driven Auxiliary Feedwater [EIIS:BA) Pump.
This event was analyzed using the McGuire PnA models by setting EDG 2B start failure to *True" (failure probability of 1) and using an exposure time of 499.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.
The exposure time is based on a period of 666 hours0.00771 days <br />0.185 hours <br />0.0011 weeks <br />2.53413e-4 months <br /> that EDG 2B was susceptible to the conditions necessary for the failure to occur minus 25 percent to account for the time that the Before And After Lube Oil Pump normally runs (the start failure would not have occurred while the Before And After lube oil pump was running).
Also, the above mitigation means were applied.
The result of this analysis is that the increase in core damage frequency due to this event is approximately lE-08.
This event has a negligible impact on normal plant risk.
LER 370/96-01 documents a Unit 2 Refueling Water Storage Tank Level Instrumentation Inoperability During Cold Weather Conditions.
The impact of the FWST level instrument inoperability while EDG 2B was considered inoperable has been examined with respect to the LOCA-LOOP scenario risk.
Using an exposure time of 4 days, a bounding
,s
- t o r
. s NRC # 0RW 36t.A
- L' t %Att AR RtGutA1(siv FCwu'590**+
..i APPROVED St ense sso att64tte eA=Res en.=
15twAttD DURDE N Pt# At&PON&t 10 CFAsaty wtMtNil uANoAtoRv mpOswAiION COLLt Ct10N Rt Out 8i to 0 HR$ AtPORft p LJ $3ONS LICENSEE EVENT REPORT (LER) it AaNt o aac acmaman o 'N'o ta L'cr=5 = aac'et$5ANotto TEXT CONTINUATION BACR 70INDU$ thy FORR AAD COWutNtl RtGARDING 00RDEN Is, watt to c a *VamN ANo atemos==AGtutut mw:a (148331 y & NutttAR atGULAtORY CoueAS$40N WASHINQtON.QC 706164ct. AND to THE PAPtRvv0Rn AttMCt10N PROJECT (31644804L F ACILity NAME (4 twsset or uawar.t y(wt agn ey,rt wagamtow gr poy3 DOCkEl HWBER til L FR Ni#aBf R f$s PAGF (36
.t out h tiAL Rt viso.m wwta o ver McGuire Nuclear Station. Unit 2 05000 370 96 02 0
8 OF 8 assumption of a LOOP following a LOCA (IE-03), and the probabilistic failure mode of EDG 2A being operable, the associated accident sequence is estimated to have a prcbability of occurrence of less than 1.BE-08.
Therefore, significant, this scenario,is not probabilistically During the periods of reduced reliability of EDC 2B, no event requiring the use of the EDGs occurred at the McGuire site.
.