UMTED STATES NUCLEAR REGULATORY COMMISSION e
I wasenwavon.n.c. noses APR 4 BBS MEMORANDUM FOR:
Victor Stello, Jr.
Executive Director for Operations FROM:
Harold R. Denton, Director Office of: Nuclear Reactor Regulation
SUBJECT:
WEEKLY
SUMMARY
OF NRC ACTIVITIES INVOLVING TVA MARCH 24-28, 1986 The following activities involving TVA were conducted by the NRC staff during the week ending March 28, 1986. These activities are listed under the NRC office having lead responsibility for a particular activity.
Is Office of Nuclear Reactor Regulation (NRR) 3/24 NRR IE, Region II, and the TVA Oversight Group participated in the weekly conference call with TVA representatives to review the status of ongoing activities.
3/27 A meeting was held between H. Thompson and V. Benaroya to discuss the TVA Management Review.
3/28 A meeting was held with IE to discuss the Intimidation and Harassment Review Team inspection.
j Correspondence Issued by NRR 3/26 Thompson to Sniezek, Request for INPO Evaluations from TVA.
3/26 Youngblood to White. Sequoyah Verification Test for Auxiliary Power System Voltage Study.
3/27 Thompson to Denton, Status of Enforcement Review of the 01 Report issued on TVA Intimidation and Harassment.
3/27 Denton to Stello, Weekly Summary of NRC Activities Involving TVA March 17-21, 1986.
3/28 Stello to Asselstine. TVA Concrete Construction Procedures.
3/28 Thompson to SMT, Weekly Schedule of TVA Activities - Weeks of March 31, 1986 and April 7, 1986.
3/28 Thompson to Youngblood, et. al., Identification of Outstanding l
NRC Requests for Infomation of TVA.
412% 23 6 1? P-
~
..w
. APR 4 1986
~
II. Office of Insoection and Enforcement (IE)
Participated in activities as described in NRR section.
III. Reaion II i
3/24-28 InspectedfirehrotectionactivitiesatBrownsFerry.
Corresoondence Issued by Region II 3/24 Issued Sequoyah Inspection Report 86-14 on Plant chemistry.
3/25 01shinski to Senior Management Team, Executive Summary of Sequoyah Operational Readiness Activities (Inspection Report 86/20).
l 3/25 G1shinski to White, Letter addressing important issues identified during the Sequoya5 Operational Readiness Inspection l
conducted March 3-14.
3/26 01shinski to Thompson, SER. Input on Sequoyah Implementation of Appendix R.
3/27 Issued Sequoyah Inspection Report 86-04 on Health Physics.
Participated in other activities as described in NRR section.
IV. Office of Investigations (01) 3/24-27 01 had two investigators following welder certification issues in the Knoxville area.
3/25-2S Two investigators were in Knoxvilla area following ANI issues.
3/25-28 One investigator was preparing for an NSRS investigation scheduled for 3/31-4/4.
f Harold R. Denton, Director Office of Nuclear Reactor Regulation cc: