ML20210G537
| ML20210G537 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/06/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20210G542 | List: |
| References | |
| NUDOCS 8702110292 | |
| Download: ML20210G537 (2) | |
See also: IR 05000498/1986033
Text
_. .
as
~ '
FEB 0- 1987
In Reply Refer To:
Dockets: 50-498/86-33
50-499/86-33
Houston Lighting & Power Company
ATTN:
J. H. Goldberg
Group Vice President, Nuclear
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. D. R. Carpenter, T. Reis,
and H. F. Bundy of this office during the period November 2,1986, through
January 2,1987, of activities authorized by NRC Construction Permits CPPR-128
and 129 for the South Texas Project, Units 1 and 2, and to the ~ discussion of
our findings with Mr. W. H. Kinsey and other members of your staff at the
conclusion of the inspection.
Areas examined during the inspection included the preoperational test program,
preoperational test witnessing, preoperational test procedure review, training,
Technical Specifications review, SAFETEAM, and site tours. Within these areas,
the inspection consisted of selective examination of procedures and representative-
records, interviews with personnel, and observations by the NRC inspectors.
The inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities appeared
to deviate from a comitment made to the NRC.- This item and reference to the
- comitment are identified in the enclosed Notice of Deviation.
You are
requested to respond to this deviation in writing. Your response should be
based on the specifics contained in the Notice of Deviation enclosed with this
letter.
The response requested by this letter and the accompanying Notice is not subject
.
to the clearance procedures of the Office of Management and Budget as required
l
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8702110292 870206
ADOCK 05000498
O@mt G3ned By
0
J.E.GMlla.-do
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next page)
_
RI O 1
f
RPB/
RP h M C_
C:RF ' .
'
10
enter /1r
HFBundy RGTaulor G
table
M,.
rson JEGa fiardo
v4p
w
m7
S/a
gae
w+
fld'
ky,11 hp
4
i
-
,
,
.
Houston Lighting & Power Company
-2-
Enclosures:
1.
Appendix A - Notice of Deviation
2.
Appendix B - NRC Inspection Report'
.50-498/86-33-
50-499/86-33
cc w/ enclosures:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Texas Radiation Control' Program Director
bec to DMB (IE01)
bec distrib. by RIV:
- RPB
DRSP
- RRI-0PS
R. D. Martin, RA
- RRI-CONST.
- SectionChief(RPB/C)
- R&SPB
- MIS System
'*RIV File
- D. Weiss, RM/ALF
- RSTS Operator
R. Pirfo, ELD
- R. G. Taylor, RPB/C
- RSB
- Project Inspector
- R. Hall
- w/766
l
,.
I
l
l
l
l
l
l