ML20210G537

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/86-33 & 50-499/86-33 on 861102-870102 & Notice of Deviation
ML20210G537
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/06/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20210G542 List:
References
NUDOCS 8702110292
Download: ML20210G537 (2)


See also: IR 05000498/1986033

Text

_. .

as

~'

FEB 0- 1987

In Reply Refer To:

Dockets: 50-498/86-33

50-499/86-33

Houston Lighting & Power Company

ATTN: J. H. Goldberg

Group Vice President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. D. R. Carpenter, T. Reis,

and H. F. Bundy of this office during the period November 2,1986, through

January 2,1987, of activities authorized by NRC Construction Permits CPPR-128

and 129 for the South Texas Project, Units 1 and 2, and to the ~ discussion of

our findings with Mr. W. H. Kinsey and other members of your staff at the

conclusion of the inspection.

Areas examined during the inspection included the preoperational test program,

preoperational test witnessing, preoperational test procedure review, training,

Technical Specifications review, SAFETEAM, and site tours. Within these areas,

the inspection consisted of selective examination of procedures and representative-

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities appeared

to deviate from a comitment made to the NRC.- This item and reference to the

- comitment are identified in the enclosed Notice of Deviation. You are

requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

The response requested by this letter and the accompanying Notice is not subject .

to the clearance procedures of the Office of Management and Budget as required l

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

8702110292 870206

PDR

0 ADOCK 05000498 O@mt G3ned By

PDR J.E.GMlla.-do

J. E. Gagliardo, Chief

Reactor Projects Branch

_

Enclosures: (see next page)

'

RI O 1 f RPB/ RP h M C_table

HFBundy RGTaulor G

C:RF ' .

M,. rson JEGa fiardo

10 enter /1r

w gae w+

v4p m7 S/a

fld' ky,11 hp

-

i

4

,

, .

Houston Lighting & Power Company -2-

Enclosures:

1. Appendix A - Notice of Deviation

2. Appendix B - NRC Inspection Report'

.50-498/86-33-

50-499/86-33

cc w/ enclosures:

Houston Lighting & Power Company

ATTN: M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas 77001

Texas Radiation Control' Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB DRSP
  • RRI-0PS R. D. Martin, RA
  • RRI-CONST. *SectionChief(RPB/C)
  • R&SPB * MIS System

'*RIV File *D. Weiss, RM/ALF

  • RSTS Operator R. Pirfo, ELD
  • R. G. Taylor, RPB/C *RSB
  • Project Inspector *R. Hall
  • w/766

l

,.

I

l

l

l

l

l

l