r S;ptember 8,1986 Docket No.'50-302 Mr. Walter S. Wilgus Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing
& Fuel Management P. O. Box 14042; M.A.C. H-3 St. Petersburg, Florida 33733
Dear Mr. Wilgus:
Your letter of April 30,-1986 described the interim modifications FPC was making at CR-3 to preclude inadvertent EFIC actuations which have occurred due to OTSG low level " spiking" events. These modifications will remain in place only until the next regularly scheduled refueling outage. Subsequent telephone discussions provided additional information regarding suitability of the two-second time delay in EFIC actuation introduced by this modification.
By letter dated June 25, 1986 you informed us that the modification does not involve changes to the Technical Specifications or any unreviewed safety questions, and that you have performed a review in accordance with 10 CFR 50.59. Our review of.your April 30 letter was therefore terminated at an appropriate point shortly after receipt of the June 25 letter. We will examine
.your 50.59 analysis at a future vis_it to the plant.,No further licensing action is planned at this time.
Sincerely, Lw John F. Stolz, Director /cj PWR Project Directorate #
Division of PWR Licensing-B cc: See next page DmHTin_R ACRS-10 GEdison cket File) BGrimes RWeller NRC PDR JPartlow PShemanski L PDR HSilver SSun PBD-6 Rdg RIngram DCrutchfield FMiraglia Gray File OGC-MNBB 9604 NThompson EJordan BMozafari
- See previous white for concurrences.
PBD-E PBD-6 PBD-6 PBD-6 PBD-6 PBD-6 PBD-6 HSilieV;jak*
BMozafari* RWeller* GEdison* PShemanski* SSun*
JStolz*
9/3/86 9/3/86-9/3/86 9/4/86 9/5/86 9/8/86 9[8/86 8609180296 860908 DR ADOCK 0500 2
r.
Docket No.
0-302 Mr. Walter S. Wilgus Vice President, Nublear Operations Florida Power Corporation ATTN: Manager, Nucle'er Licensing
& Fuel Managemen't -
P. O. Box 14042; M.A.C. k-3 St. Petersburg, Florida 33733
Dear Mr. Wilgus:
Your letter of April 30, 1986 described the interim modifications FPC was making at CR-3 to preclude inadvSqtent EFIC actuations which have occurred due to OTSG low. level " spiking" events'. Subsequent telephone discussions provided additional information'regarding suitability of the two-second time. delay'in EFIC actuation introduced by this modification.
By letter dated June 25, 1986 you informed us that the modification does not involve changes to the Technical Specifications or any unreviewed safety questions, and that you have performed a review in accordance with 10 CFR 50.59. Our review 'of your April 30 letter was therefore terminated at an appropriate point shortly after receipt of the June 25 letter. We will examine your 50.59 analysis at a future visit to the plant. No further licensing action is planned at this time.
x Sincerely,
'x John F. Stolz, Director PWR Project Directorate #6 Division of PWR Licensing-B cc: See next page N
DISTRIBUTION ACRS-10 GEdison Docket-File BGrimes RWeller NRC PDR JPartlow PShemanski L PDR HSilver SSun PBD-6 Rdg RIngram DCrutchfield FMiraglia
. Gray File OGC-MNBB 9604 NThompson EJordan BMozafari V
/d s w YS Y
g
,/
PBD-b PBD-6' PBD-6
-PBD-6 Mf.f.
N PBD-6 HSilver;jak--
BMozafari RWeller GEdison PShemanski SSun JSt lz 4
[f'~
9/g86 9/J/86 9/'J/86-9///86 9/f/86 9/f /86 9 86 s k & tr uaEhrd W 6.
gn in b m Sir unbl %e next debeWp ennge (. Rem) 2 Q,
Mr. W. S. Wilgus Crystal River Unit No. 3 Nuclear Florida Power Corporation Generating Plant cc:
Mr. R. W. Neiser State Planning and Development Senior Vice President Clearinghouse and General Counsel Office of Planning and Budget Florida Power Corporation Executive Office of the Governor P. O. Box 14042 The Capitol Building St. Petersburg, Florida 33733 Tallahassee, Florida 32301 Mr. P. McKee Mr. F. Alex Griffin, Chairman Nuclear Plant Manager Board of County Commissioners Florida Power Corporation Citrus County P. O. Box 219 110 North Apopka Avenue Crystal River, Florida 32629 Inverness, Florida 36250 Mr. Robert B. Borsum Babcock & Wilcox Nuclear Power Generation Division
- Suite 220, 7910 Woodmont Avenue Bethesda, Maryland 20814 Resident Inspector U.S. Nuclear Regulatory Commission Route #3, Box 717 Crystal River, Florida 32629 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.
T311ahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Attorney General Departnent of Legal Affairs The Capitol Tallahassee, Florida 32304 f
.,,7,
-