Forwards Supplemental Safety Evaluation Re Licensee Responses to IE Bulletin 80-11, Masonry Wall Design. Items 2(b) & 3 of Bulletin Fully Implemented
ML20210B451
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 09/11/1986
From: Varga S
Office of Nuclear Reactor Regulation
To: Farrar D
COMMONWEALTH EDISON CO.
Shared Package
ML20210B457 List:
References
IEB-80-11, NUDOCS 8609180082
Download: ML20210B451 (2)


Text

.

Szptemb:r 11, 1986 DISTRIBUTION Docket Nos. 50-295 (555 R TTTE"J3 B. Grimes and 50-304 NRC PDR J. Partlow Local PDR J..Norris PD#3 Rdg.

ACRS(10)

T. Novak C. Vogan Mr. D. L. Farrar 0GC Tech Branch Director Nuclear Licensing E. Jordan N. Chokshi Comonwealth Edison Company N. Thompson Post Office Box 767 Chicago, Illinois 60690

Dear Mr. Farrar:

SUBJECT:

ZION NUCLEAR POWER STATION, UNITS 1 AND 2 - MASONRY WALL DESIGN,

,IE BULLETIN 80-11, MULTI-PLANT ACTION B-59 By letters dated' July 7, July 25, and November 6, 1980, the Commonwealth Edison Company (CEC) responded to IE Bulletin 80-11. This information was supplemented by letters dated July 12 and September 10, 1982. On September 12, 1983, the staff issued the Safety Evaluation Report (SER) concluding that of the 222 masonry walls that had been reviewed 18 walls using horizontal joint reinforcement'still do not meet staff criteria. On November 14, 1983, CEC submitted additional information relating to the 18 masonry walls. identified in the staff's SER.

We have reviewed the ~ submitted information and conclude that staff's concerns with the affected 18 walls are resolved and, therefore, for all. block walls at Zion facility, Items 2(b) and 3 of the IE Bulletin 80-11 are fully implemented.

Enclosed is our Supplemental Safety Evaluation. This letter closes the action on this issue.

Sincerely,

/5 Steven A. Varga, Director Project Directorate #3 Division of PWR Licensing-A cc: See next page f

PD s PD#3 g p

CVogan JNo nis ar 9/$/86 9/gg/86 gt /86 860918o082 e60911 DR ADOCK 0500 5

Mr. D. L. Farrar Commonwealth Edison Company Zion Station' cc:

Robert J. Vollen, Esquire Mr. Michael C. Parker, Chief 109 North Dearborn Street Division of Engineering Chicago, Illinois 60602 Illinois Department of Nuclear Safety Dr. Cecil Lue-Hing 1035 Outer Park Drive, 5th Floor Director of Research and Development Springfield, Illinois 62704 Metropolitan Sanitary District of Greater Chicago 100 East Erie Street Chicago, Illinois 60611 Mr. Michael I. Miller Isham, Lincoln and Beale Counselors at Law Three First National Plaza Sist Floor Chicago, Illinois 60602 Susan N. Sekuler, Esquire Assistant Attorney General Environmental Control Division 188 West Randolph Street, Suite 2315 Chicago, Illinois 60601 Mayor of Zion Zion, Illinois 60099 Illinois Department of Nuclear Safety ATTN: Manager, Nuclear Facility Safety 1035 Outer Park Drive 5th Floor

~~

Springfield, Illinois 62704 U.S. Nuclear Regulatory Commission Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional idministrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

- -..