Forwards Insp Repts 50-317/86-19 & 50-318/86-19 on 861201- 870112.No Violations Noted.Concerns Re Preservation of Design Requirements During Svc Water Sys Mods & Possible Weaknesses in Component Environ Qualification Expressed
ML20210A055
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/27/1987
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20210A059 List:
References
NUDOCS 8702060395
Download: ML20210A055 (2)


See also: IR 05000317/1986019

Text

.

_ _ _ - _ _ _ _ _ _ _ _ _ _ _

,

. .

.

34tl 27196T

Docket / License: 50-317/DPR-53

50-318/DPR-69

Baltimore Gas and Electric Company

ATTN: Mr. J. A. Tiernan

Vice President, Nuclear Energy

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject: NRC:RI Inspection 50-317/86-19, 50-318/86-19

This transmits the December 1,1986 - January 12, 1987 resident inspection findings

by Messrs. T. Foley and D. Trimble at the Calvert Cliffs Nuclear Power Plant, Lusby,

Maryland. Those findings were based on observation of activities, interviews, and

document reviews, which have been discussed with Mr. Lemons of your staff.

Within the scope of this inspection, no violations were observed.

Concerns were identified regarding your controls for (1) assuring preservation of

original design basis requirements during modifications of the Service Water System

(Section 2.c), and (2) possible weaknesses'within the program for assuring that

all components are environmentally qualified (Section 8 of this report). We

understand you have initiated efforts to determine if similar problems exist in

other plant systems. Because of the potential for inadequate controls in these

areas to significantly affect plant safety, we will closely monitor your assess-

ments and any resulting corrective action. In addition, although not needed

during this outage, we understand that prior to any future planned use of the

shutdown cooling system to augment the spent fuel pool cooling system, the

flow path will be verified operable by test.

Your cooperation with us is appreciated.

Sincerely,

int o Eignad B71

dwar z hief

Projects Branch No. 3

Division of Reactor Projects

Enclosure: Region I Inspection Report 50-317/86-19, 50-318/86-19 1

cc w/ enclosure:

M. Bowman, General Supervisor, Technical Services Engineering

T. Magette, Administrator, Nuclear Evaluations

Public Document Room (LPDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maryland (2) /

8702060395 870127 [

PDR

G

ADOCK 05000317

PDR

0[

_

---_----_---_____-.--___'___'_______j

, . . .

, .

.

Baltimore Gas and Electric Company 2 y 271987

bec w/ enclosure:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosure)

DRP Section Chief

T. Kenny, SRI, Salem

M. McBride, RI, Pilgrim

S. McNeil, LPM, NRR

Robert J. Bores, DRSS

i

f .bRP P RI:DRP

.

l} v (9 Oc N h

'

Iey/Trimble/ss T ipp Wenzinger

l '

1/20/87 i 12 7

0FFICIAL RECORD COPY