Forwards Updated Status List Re Implementation of Generic Requirements.Projected Dates of Completion Rough Estimates
ML20209J256
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/04/1986
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-OR, TASK-TM LAC-11805, NUDOCS 8609160252
Download: ML20209J256 (10)


Text

.

D DA/RYLAND hh[M[ COOPERATlVE P O BOX 817

  • 2615 EAST AVE SO
  • LA CRO (608) 788-4000 JAMES W. TAYLOR G;neral Manager September 4, 1986 In reply, please refer to LAC-11805 DOCKET NO. 50-409 Mr. John A. Zwolinksi, Director BWR Project Directorate #1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 GENERIC REQUIREMENTS

REFERENCE:

(1) NRC Letter, Zwolinski to Taylor dated April 18, 1986.

(2) DFC Letter, Taylor to Zwolinski, LAC-ll587 dated May 13, 1986.

Dear Mr. Zwolinski:

You requested that we provide status information on the list of generic requirements enclosed in your letter. We provided this information in Reference 2, except for those items on which we were awaiting explanatory information from the NRC. Enclosed is an updated status list. The information we have provided is to the best of oor knowledge at this time.

The projected dates of completion are rough estimates.

If you have any questions, please contact us.

Yours truly, g(nLE!) - .

NI a  % e, cu. xyW i JWT:LSG:sks )

Enclosure cc: Mr. John Stang, LACBWR Project Manager F r. James G. Keppler, Region 111 NRC Resident Inspector 1

)

WPl.6.10 %91hhb P

9 i

~

. R-1208731-001 R E G U'L A T O R Y INF0RMATION TRACKING SYSTEN FACILITY IMPLEMENTATION Facility: LA CROSSE 03/31/86

-Plant Location: 19 Mi. S-of La Crosse, WI Licensed Power:~ 0165 MWT Project Manager: J. Stang Docket Number: 050.-00409 Design power: 0050 MWE Branch Chief J. Zwolinski Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: 1. VillaIva LIC ACT -LICENSEE TAC No. MPA TITLE COMPLETE STATUS DATE M08332 A-01 10 CFR 50.55 A(G) - ISI 08/25/82C COMPLETE 1982 M08099 A-02 APPENDIX I - ALARA 10/18/84C COMPLETE MAY 1985 M07230 A-03 SECURITY REVIEWS - MODIFIED AMENDMENT PLANS 05/16/79C COMPLETE 1982 M08858 A-04 APPENDIX J - CONTAINMENT LEAK TESTING 08/24/82C COMPLETE APRIL 1985 M08467 A-06 RESPIRATORY PROTECTION SYSTEM 12/15/81C COMPLETE MARCH 1985' M10936 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE 05/19/30C COMPLETE 1977 M10928 A-10 CONTINGENCY PLANNING 04/02/82C COMPLETE 1983 M10929 A-11 GUARD TRAINING PLANS 12/06/82C COMPLETE DEC. 1984 M10930 A-12 VITAL AREA ANALYSIS 04/12/82C NA M47561 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 08/17/82C COMPLETE 1983 M51101 A-17 INSTRUMENTATION TO FOLLOW THE COURSE OF AN ACCIDENT 01/01/87 UNDER REVIEW BY NRC M54666 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL-83-43) 05/30/86 UNDER REVIEW BY NRC M59106 A-20 10 CFR 50.62 OPERATING REACTOR REVIEWS 03/31/86 PHYSICALLY COMPLETE 1980, UNDER REVIEW BY NRC.

M07897 B-01 DIESEL GENERATOR LOCKOUT ~ 12/15/81C COMPLETE 1978 M06665 B-02 FIRE PROTECTION ,07/27/79C PR(LTECTED 1987, REFER TO NRC INSPEC-TION REPORT 50-409/85013 (DRS)

R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM

~

FACILITY IMPLEMENTATION J

Facility: LA CROSSE 03/31/86 Plant Location: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Manager: J. Stang Docket Number: 050-00409 Design power: 0050 MWE Branch Chief J. Zwolinski Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: 1. Villalva LIC ACT LICENSEE TAC No. MPA TITLE COMPLETE STATUS DATE M46664 B-05 STRESS CORROSION CRACKING - BWR RCSPB 10/14/83C -004PLETE 1983 M08220 3-05 STRESS CORROSION CRACKING - BWR RCSPB 08/20/79C M08196 B-06 BWR RELIEF VALVE 07/16/80C COMPLETE JUNE 1985

M12172 B-16 EMERGENCY PLANNING AND REVISIONS 04/01/81C COMPLETE APRIL 1985 M08466 B-17 TECil SPEC SURVEILLANCE FOR HYDRAULIC SNU3BERS 12/15/81C NA M10285 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION 10/25/80C UNDER REVIEW FOR T.S. CHANGE ALSO REFER TO B-24 l M10347 B-21 LOSS OF 125-V DC BUS VOLTAGE WITH LOSS OF ANNUNCIA 02/28/82C NA - BELIEVE NO REQUIREMENTS ISSUED M08468 B-22 TECH SPEC SURVEILLANCE REQUIREMENTS OF MECHANICAL 06/04/81C NA 1
M10031 B-23 DEGRADED GRID VOLTAGE 10/14/82C PROJECTED 1988 M42611 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POWER 04/30/84C COMPLETE MARCH 1986 EXCEPT SEISMIC CONSIDERATION OF DEBRIS SCREENS IS M11136 B-24 VENTING AND PURGING CONTAINMENTS WHILE AT FULL POWER 12/12/80C TIED TO CONSEQUENCE STUDY WHICH IS UNDER NRC REVIEW.

M10888 B-2 7 REVIEW RESPONSES TO IE BULLETIN 78-03 (OFFGAS EXPL 10/01/80C COMPLETE 1978 7 M11100 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/01/81C M43628 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 07/12/83C PRGJECTED 1987 M43980 B-41 FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 04/04/84C i

R-1208731-001 REGULAT0RY INF0RMAT10N TRACK 1NG SYSTEM-FAC1L1TY IMPLEMENTATION i Facility: 1A CROSSE 03/31/86 i'

Platnt Lccation: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Manager: J. Stang i Docket Number: 050-00409 Design power: 0050 MWE branch Chief J. Zwolinski l Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant C. Jamerson IE Inspector: 1. V111alva LIC ACT LICENSEE TAC No. MPA TITLE COMPLETE STATUS DATE l M11747 B-42 'Dil FOLLOW UP - ALL PLANTS 10/14/80C COMPLETE 1982 M12449 B-44 LESSONS LEARNED IMPLEMENTATION 06/04/81C *

! M30584 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C NA 4

3 M30585 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C NA M30586 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C COMPLETE 1980 M30587 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C CAT. A - COMPLETE 1980

, CAT. B - REFER TO F-63 i

l M30588 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C COMPLETE 1980 t

l M30589 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C COMPLETE 1980 l

M30590 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C CAT. A - COMPLETE 1980 l CAT. B - REFER TO F-20 t

M30591 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C CAT. A - COMPLETE 1980 CAT. B - REFER TO F-12 M30592 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C CAT. A - COMPLETE 1980

CAT. B - REFER TO F-11 i

i M30593 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C COMPLETE 1980 1

l

  • From information provided, it cannot be determined which Category A item this is. If it is Category A requirements for j high point vents, which is not covered elrewhere, the coupletion was 1980.

i

1 R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM

~

FACILITY IMPLEMENTATION Facility: IA CROSSE 03/31/86 Plant Location: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Manager: J. Stang Docket Number: 050-00409 Design power: 0050 MWE Branch Chief J. ZwolinsLi Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: I. Villalva i LIC ACT LICENSEE TAC No. MPA TITLE COMPLETE STATUS DATE M30594 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C COMPLETE 1982 1

M30595 B-44 LESSONS LEARNED IMPLEMENTATION 04/25/80C CAT. A - COMPLETE 1980

CAT. B - REFER TO F-26 M30596 B-44 LESSONS LEARN'dD IMPLEMENTATION 04/25/80C COMPLETE 1981 M30597 B-44 LESSONS LEAlbiED IMPLEMENTATION 04/25/80C CAT. A - COMPLETE 1980 CAT. B - REFER TO F-14 M12917 B-45 WASH 1400 EVENT V, " PRIMARY C001 ANT SYSTEM PRESSURE 02/25/81C COMPLETE 1982 1

i M12763 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE II/05/81C COMPLETE 1981 1

M43981 B-51 EVALUATION OF BULLETIN 79-06 AND 79-08 07/04/81C COMPLETE 1981 f M42211 B-58 SDV CAPABILITY 01/01/70C NA, NO RESPONSE REQUIRED PER RES.

j INSPECTOR IN 1980 I

M42912 B-59 MASONRY WALL DESIGN 07/31/86 UNDER NRC REVIEW e

B-60 M42522 ENVIRONMENTAL QUALIFICATION 04/18/85C COMPLETE APRIL 1985 (BUT REFER TO A-17)

M42682 B-61 LOSS OF NON CIASS IE I&C POWER 07/28/82C COMPLETE 1980 M42753 B-62 ESF RESET CONTROL DESIGN DEFICIENCY 01/12/82C COMPLETE 1982 l

M43907 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACK 0UT 12/18/81C COMPLETE 1981 M43716 B-65 SAFETY CONCERNS ASSOCIATED WITH PIPE BREAKS IN BWR 12/15/81C NA

R-1208731-001 REGULAT0RY INF0RMATION TRACK 1NG SYSTEM FACILITY IMPLEMENTATION

  • Facility: IA CROSSE 03/31/86 Plent Location: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Manager: J. Stang Docket Number: 050-00409 Design power: 0050 MWE Branch Chief J. Zwolinski Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: 1. Villalva LIC ACT LICENSEE TAC No. MPA TITLE COMPLETE STATUS IATE M51682 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 01/08/85C COMPLETE 1985 EXCEPT FOR T.S. ASSOCIATED WITH F-19 M52768 B-76 ITEM 1.1 - POST TRIP REVIEW; PROGRAM DESCRIPTION & 12/02/850 COMPLETE - NRC LETTER 12/12/85 M52849 B-77 ITEM 2.1 - EQUIPMENT CIASSIFICATION & VENDOR INTER 09/30/86 UNDER NRC REVIEW M52930 B-78 ITEM 3.1.1 & 3.1.2 - POST MAINTENANCE TEST PROCEDURE 03/31/86 COMPLETE - NRC LETTER 03/20/86 M53011 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 02/28/87 UNDER NRC REVIEW M54542 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83- II/30/84C UNDER NRC REVIEW M56859 B-84 INSPECTIONS OF BWR STAINLESS STEEL PIPING ACCORDIN 03/31/86 UNDER NRC REVIEW M53600 B-85 SALEM ATWS 1.2 DATA CAPABILITY 04/15/86 UNDER NRC REVIEW M53683 B-86 SALEM ATWS 2.2 S-R COMPONENTS 09/30/86 UNDER NRC REVIEW M53766 B-87 SALEM AWS 3.2.1 & 3.2.2 S-R COMPONENTS 03/31/86 COMPLETE - NRC LETTER 03/20/86 M53849 B-88 SALEM AWS 3.2.3 T.S. S-R COMPONENTS 10/30/86 UNDER NRC REVIEW M54076 B-92 SALEM AWS 4.5.1 DIVERSE TRIP FEATURES 05/17/85C COMPLETE - NRC LETTER 05/17/85 M53993 B-93 SALEM AWS 4.5.2 & 4.5.3 TEST ALTERNATIVES 02/28/86 UNDER NRC REVIEW M08280 C-02 BWR-RECIRC. PUMP TRIP (AWS) 08/20/79C COMPLETE 1980 M07999 C-10 CONTROL OF HEAVY LQaDS OVER SPEND FUEL POOL (PilASE 08/17/83C COMPLETE - NRC LETTER 08/17/83

R-1208731-001 REGULAT0RY INF0RMATION TRACKING- SYSTEM FACILITY IMPLEMENTATION Facility: IA CROSSE 03/31/86 Plant Location: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Manager: J. Stang Docket Number: 050-00409 Design power: 0050 MWE Branch Chief J. Zwolinski Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: I. Villalva LIC ACT LICENSEE TAC No. MPA TITLE COMPLETE STATUS DATE M52239 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOWUP OF MPA 06/28/85C COMPLETE - NRC LETTER 06/28/85 M10068 D-11 FISSION GAS RELEASE 10/13/79C COMPLETE 1977 M07957 D-12 NON-JET PUMP BWR CORE SPRAY PERFORMANCE 04/19/79C COMPLETE 1977 M12289 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL 02/19/81C NA M43049 D-17 DEFINITION OF OPERABLE 10/30/81C COMPLETE 1981 i

M55870 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) 02/24/86C COMPLETE - NRC LETTER 02/24/86 M07441 E-01 SPENT FUEL POOL EXPANSIONS 02/04/80C COMPLETE 1980 M08856 E-01 SPENT FUEL POOL EXPANSIONS 10/06/79C i

j M01214 E-02 FUEL CASK DROP 10/22/75C COMPLETE IS'76 l M44030 F-01 1.A.l.1 Sh1FT TECHNICAL ADVISOR 07/09/82C COMPLETE 1982 M44099 F-02 I.A.1.3 SHIFT MANNING 06/30/83C COMPLETE - 1983 T.S. CHANGE 1/85 l

4 M44171 F-03 1.A.2.1 UPGRADING OF R0 AND SRO TRAINING 11/24/82C COMPLETE 1980 M44242 F-04

  • 1.C.I.2/3.A EMEREENCY OPERATING PROCEDURES GENERIC 06/07/84C AWAITING DPC/NRC MEETING N44312 F-05 I.C.I.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 10/30/86 AWAITING DPC/NRC MEETING
  • F-04 from clarification list - La Crosse - NUREG-0737 I.C.I.2.A Inadequate Core Cooling Guidelines - Complete 1980 j

i

R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM FACILITY IMPLEMENTATION Facility: LA CROSSE 03/31/86 Plant Location: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Manager: J. Stang

' Docket Number: 050-00409 Design power: 0050 MWE Branch Chief J. Zwolinski Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: 1. Villaiva LIC ACT LICENSEE TAC No. MPA TITLE CQ4PLETE STATUS DATE M47225 F-06 1.C.5 FEEDBACK OF OPERATING EXPERIENCE 02/09/82C COMPLETE 1980 M47297 F-07 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVIT 02/09/82C COMPLETE 19 81 I

M51171 F-08 1.D.I.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRA 10/10/84C COMPLETE 1982 M51251 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 08/30/86 UNDER NRC REVIEW M44381 F-10 II.B.1 RCS HIGH POINT VENTS 08/25/83C COMPLETE MAY 1986 M47948 F-11 11.B.2 PLANT SHIELDING 06/27/83C COMPLETE MAY 1985 M44450 F-12 II.B.3 POST ACCIDENT SAMPLING 05/30/86 COMPLETE AUGUST 1986 M44521 F-13 11.B.4 TRAINING FOR MITIGATING CORE DAMAGE 11/24/82C COMPLETE 1981 M44591 F-14 II.D.1 RV AND SV TRAINING 11/30/84C COMPLETE 1981 M44789 F-18 11.E.4.1 DEDICATED HYDROGEN PENETRATION 12/15/81C COMPLETE 1980 M44860 F-19 II.E.4.2 CONIAINHENT ISOLATION DEPENDABILITY 09/20/83C PROJECTED 1987 M44931 F-20 II.F.1.1 NOBLE GAS MONITOR 10/20/81C UNDER NRC REVIEW M45002 F-21 11.F.1.2 IODINE / PARTICULATE SAMPLING 10/20/81C UNDER NRC REVIEW M45073 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 03/05/82C COMPLETE 1982

R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM ,

FACILITY IMPLEMENTATION Facility: LA CROSSE 03/31/86 Plant Location: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Managec: J. Stang Docket Number: 050-00409 Design power: 0050 MWE Branch Chief J. Zwolinski Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: 1. Villalva LIC ACT LICENSEE TAC No . MPA TITLE COMPLETE STATUS DATE M47609 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 05/14/84C COMPLETE SEPT. 1985 M47680 F-24 II.F.1.5 CONTAINMENT WATER LEVEL INSTRUMENT 05/14/84C COMPLETE - NRC LETTER MAY 1984 M47751 F-25 II.F.1.6 CONTAINHENT HYDROGEN MONITOR 05/14/84C COMPLETE - NRC LETTER MAY 1984 M45144 F-26 II.F.2 INSTRUMENTS FOR DETECTION ON INADEQUATE 10/30/86 COMPLETE - NRC LETTER MAY 1981.

II.F.2.3 IS BEING REOPENED BY NRC M45353 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/08/82C COMPLETE 1981 T.S. 1/85 M45545 F-43 II.K.3.13 HFCI AND RCIC INITIATION LEVELS 11/30/81C COMPLETE 1980, NA M46524 F-44 II.K.3.14 ISOLATION CONDENSER ISOLATION MODIFICAT 12/14/81C COMPLETE 1980 NRC LETTER 1981, NA M45597 F-46 II.K.3.16 CHALLENGES AND FAILURES OF RELIEF VALVES 04/14/83C COMPLETE 1980, NA M45639 F-47 II.K.3.17 ECCS OUTAGES 08/19/83C CQ1PLETE 1982 N45693 F-48 II.K.3.18 ADS ACTUATION 03/31/82C COMPLETE 1980, NA

' M45717 F-49 II.K.3.19 INTERLOCK RECIRCULATION PUMP MODIFICATI 04/27/82C COMPLETE 1980 m45741 F-50 II.K.3.21 RESTART OF CSS AND LPCI 11/16/82C COMPLETE - NRC LETTER 1982 M45765 F-53 II.K.3.25 POWER ON PUMP SEALS 05/25/83C COMPLETE - NRC LETTER 1983 M45789 F-54 II.K.3.27 COMMON REFEREhCE LEVEL 10/15/82C PROJECTED 1987 M48279 F-55 II.K.3.28 QUALIFICATION OF ADS ACCUMULATORS 05/24/83C COMPLETE 1982

r R-1208731-001 REGULAT0RY INF0RMATION TRACKING SYSTEM .

FACILITY IMPLEMENTATION Facility: LA CROSSE 03/31/86 Plant Location: 19 Mi. S of La Crosse, WI Licensed Power: 0165 MWT Project Manager: J. Stang Docket Number: 050-00409 Design power: 0050 MWE Branch Chief J. Zwolinski Arch / Engineer: S&L NSSS Vendor: AC Lic. Assistant: C. Jamerson IE Inspector: 1. VillaIva LIC ACT LICENSEE TAC No. MPA TITLE COMPLETE STATUS DATE M46525 F-56 II.K.3.29 PERFORMANCE OF ISOLATION CONDENSERS 02/09/82C COMPLETE 1981 M45836 F-57 II.K.3.30 SB LOCA METHODS 02/02/84C COMPLETE - NRC LETTER FEB.1984 M48175 F- 58 II.K.3.31 COMPLIANCE WITH 10 CFR 50.46 02/02/84C COMPLETE - NRC LETTER FEB.1984 M45889 F-59 II.K.3.44 ANTICIPATED TRANSIENTS WITH SINGLE FAIL 03/26/84C COMPLETE 1981 M45913 F-60 II.K.3.45 MANUAL DEPRESSURIZATION 01/06/83C COMPLETE 1980, NA M45955 P-63 III. A.I .2 TECHNICAL SUPPORT CENTER 03/31/86 COMPLETE FEB. 1984 M46026 F-64 III.A.I.2 OPERATIONAL SUPPORT CENTER 03/31/86 COMPLETE FEB. 1984 M46098 F-65 III. A.I.2 EMERGENCY OPERATIONS FACILITY 03/31/86 COMPLETE FEB. 1984 M46170 F-66 III.A.I .2 NUCLEAR DATA LINK 07/30/82C NA M466242 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/16/83C COMPLETE 1983 M46314 F-68 III.A.2.2 METEOROLOGICAL DATA UPGRADE 03/31/86

  • M46385 F-69 III.D.3.3 IMPLANT RADIATION MONITORING 03/05/82C COMPLETE 1981 M46454 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 06/10/82C COMPLETE - NRC LETTER APRIL 1985 M56134 F-71 I.D.I.2 DETAILED CONTROL ROOH REVIEW (FOLLOWUP TO 02/21/85C UNDER NRC REVIEW
  • Current actions are adequate at this time per discussion with W. Snell, NRC-Region III, 08/25/86.