ML20209G588
| ML20209G588 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/05/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20209G593 | List: |
| References | |
| NUDOCS 8609150016 | |
| Download: ML20209G588 (1) | |
Text
r
'L>
b "" 4 September 5, 1986 Docket No. 50-400 License No. CPPR-158
\\/ Carolina Power and Light Company ATTN:
Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
The Nuclear Regulatory Commission's (NRC) Office for Analysis and Evaluation of Operational Data (AE00) has recently completed a study on 19 newly licensed reactors.
The prime objective was to characterize the trends and patterns of the events that were being experienced during the first two years of operation.
The enclosed report represents a systematic review of the operating experience data bases with a focus on these "new plants."
The goal of our new plant study is to isolate specific trouble areas.
Therefore, we are providing Shearon Harris a copy of this study in order to help you identify those areas which may require close scrutiny to assure safe unit operation.
Please let us know if you have any questions.
Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director Division of Reactor Projects
Enclosure:
AE00 Evaluation of New Plant Experience cc w/ encl:
R. A. Watson, Vice President Harris Nuclear Project
- 40. L. Tibbitts, Director of Regulatory Compliance 3 J. 1. Willis, Plant General Manager bcc w/ encl:
C. Barth, ELD J. Moore, ELD N NRC Resident Inspector Document Control Desk State of North Carolina RII RIq kadde LReyes 7
d i g e
I
' ' Mi
'09/f/86 09/f/86 8609150016 860905 g-g/
PDR ADOCK 05000400 i
A PDR