Advises That Liquid Samples Spiked W/Radionuclides Will Be Sent to Facilities for Radiochemical Analyses Per NRC Confirmatory Measurements Program.Samples Should Be Analyzed for tritium,Sr-89,Sr-90 & Fe-55 within 60 Days of Receipt
ML20209F570
Person / Time
Site: Hatch, Vogtle, 05000000
Issue date: 08/28/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
References
NUDOCS 8609120198
Download: ML20209F570 (3)


Text

T

.  % o(&cioJ AUG 2 81966

/eorgiaPowerCompany

./ ATTN: Mr. J. H. Miller,.Jr.

President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT:

DOCKET NOS. 50-321, 50-366, AND 50-424 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the Hatch and Vogtle facilities for radiochemical analyses. These samples are to be analyzed for tritium, strontium-89, strontium-90, and iron-55 in accordance with your approved procedures for analysis of liquid waste samples. If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples.

The spiked samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory within approximately thirty' days.

We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of the samples. Results should be sent to:

U. S. Nuclear Regulatory Commission, Region II, ATTN: Mr. P. G. Stoddart. Our evaluation of your results will be discussed with your staff and documented in our next inspection report for this area. Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Mr. Phillip G.

Stoddart by telephone at (404) 331-2689.

Sincerely Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects cc: J. P. O'Reilly, Senior Vice President Nuclear Operations J. T. Beckham, Vice President and General Manager-Nuclear Operation H. C. Nix, Site General Manager

/'/A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing

/ R. E. Conway, Senior Vice President &

Project Director

/D. O. Foster, Vice President, Project Support t

8609120198 860G28 ' o PDR ADOCK 05000321 P PDR

[ffdf

^

. N Georgia Power Company 2 MP.D. Rice,VicePresident, Project Engineering JR. H. Pinson, Vice President, Project

/ .RConstruction A. Thomas, Vice President, Licensing D. S. Read, General Manager, Quality Assurance

/C. W. Hayes, Vogtle Quality Assurance Manager

/W.C.Ramsey, Manager-f Readiness Review t

V G. B. Bockhold, General Manager, Nuclear Operations

/ M. H. Googe, Project j Construction Manager V E. D. Groover, Quality Assurance Site Manager -

f Construction JJ. A. Bailey, Project Licensing Manager

/G.F.Trowbridge,Esq.,Shaw, Pittman, Potts and Trowbridge

/B.W. Churchill,Esq.,Shaw, f Pittman, Potts and Trowbridge V E. L. Blake, Jr. , Esq. , Shaw, Pittman, Potts and Trowbridge J. E. Joiner, Troutman, Sanders, Lockerman and Ashmore

/ .JG. Ledbetter, Commissioner, Departnent of Human Resources

/C. H. Badger, Office of Planning and Budget

/D.Kirkland,III, Counsel, Office of the Consumer's Utility

/. DCouncil C. Teper, Georgians Against Nuclear Energy MM.B.Margulies,Esq., Chairman, Atomic Safety and Licensing Board Panel

/Dr. O. H. Paris, Administrative Judge Atomic Safety and Licensing Board

/.GPanel A. Linenberger, Jr., Administrative Judge Atomic Safety and Licensing Board Panel jB. P. Garde, Citizens Clinic, Director Government Accountability Project N/f B. C. Arnold, Chemistry Supervisor V D. F. Hallman, Chemistry Superintendent

. _ _ ~ _ . _ _ _ _ _ _ _ _ , - _ _ -..

. 5 Georgia Power Company 3 bec/:!.Reis, E

ELD l f W. M. Hill, IE ,

/M. Miller, NRR ,

v'jW. Brach, ED0  :

vM. Sinkule, RII .

  1. E.Christnot,RII '

v'NRC Resident Inspectors j Document Control Desk tate of Georgia .

/Hugh S. Jordan, Executive Secretary .

i l

i l

l n

l RII RII RII RI JW SAdamovitz JW PStoddart W

DCollins y MSinkule 8/-7//86 8/>s'/86 8RL/86 8//g/86 h$N