Forwards Insp Repts 50-424/87-14 & 50-425/87-10 on 870209-13 & Notice of Violation
ML20209F063
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/14/1987
From: Reyes L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20209F071 List:
References
NUDOCS 8704300188
Download: ML20209F063 (3)


See also: IR 05000424/1987014

Text

c

bL

APR 3 4 m

Docket Nos. 50-424, 50-425

License Nos. NPF-61, CPPR-109

,korgiaPowerCompany

/

% TTN: Mr. James P. O'Reilly

Senior Vice President-Nuclear

Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-424/87-14AND50-425/87-10)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

G. A. Hallstrom on February 9-13, 1987.

The inspection included a review of

activities authorized for your Vogtle facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

l

NRC requirements.

The violations, references to pertinent requirements, and

!

elements to be included in your response are described in the enclosed Notice

l

of Violation.

1

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed in the NRC Public Document Roem.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

\\

Cb"

&

$$43M$$N

4

f

G

Luis

. Reyes, Director

Division of Reactor Projects

Enclosures:

(See page 2)

{\\

JDI

-

-

APR 141987

.

,

Georgia Power Company

2

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

cy w/encls:

(E. E. Conway, Senior Vice President &

Project Director

(f. Whitney, General Manager Project \\/

Support

y D. Rice, Vice President, Project \\/

Engineering

ofV H. Pinson, Vice President, Project /

Jonstruction

W. W. Hayes, Vogtle Quality

s/

fssuranceManager

W. B. Bockhold, General Manager, /

Nuclear Operations

g/Gucwa, Manager, Nuclear Safety /

and Licensing

g.H.Googe, Project

sf

GonstructionManager

DV. A. Bailey, Project Licensing /

Manager

g W. Churchill, Esq., Shaw,

/

Pittman, Potts and Trowbridge

oX' E. Joiner, Troutman, Sanders, /

t/.LockermanandAshmoreG. Ledbetter, Commissioner, /

JepartmentofHumanResources

j

(,C. H. Badger, Office of Planning V

f nd Budget

i

LU. Kirkland, III, Counsel,

/

Office of the Consumer's Utility

founcil

W. Feig, Georgians Against /

uclear Energy

. B. Margulies, Esq., Chairman, V

Atomic Safety and Licensing Board

Panel

GUr. O. H. Paris, Administrative Judge /

Atomic Safety and Licensing Board

A

inenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

bec w/encis:

(See page 3)

.

o

,

.

Georgia Power Company

3

APR 14 M7

b

w/encls: /

eis. 0GC V

.

M. Hill, IE

Miller, NRR

Brach, ED0

j

@M. Sinkule RII - I

E Christnot, RII

dRCResidentInspector

Document Control Desk

State of Georgia

RI

RII

RIJ

RII

RII

j

GHallstrom:es x1Blake

r

V

ciera

MSi

le

V8ro

ee

'

03pJ/87

03 '/87

//f/87

03/

7

/p{/87

03//F/87

f