ML20209F063
| ML20209F063 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/14/1987 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | James O'Reilly GEORGIA POWER CO. |
| Shared Package | |
| ML20209F071 | List: |
| References | |
| NUDOCS 8704300188 | |
| Download: ML20209F063 (3) | |
See also: IR 05000424/1987014
Text
c
bL
APR 3 4 m
Docket Nos. 50-424, 50-425
License Nos. NPF-61, CPPR-109
,korgiaPowerCompany
/
% TTN: Mr. James P. O'Reilly
Senior Vice President-Nuclear
Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NOTICE OF VIOLATION
(NRC INSPECTION REPORT NOS. 50-424/87-14AND50-425/87-10)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
G. A. Hallstrom on February 9-13, 1987.
The inspection included a review of
activities authorized for your Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
The inspection findings indicate that certain activities appeared to violate
l
NRC requirements.
The violations, references to pertinent requirements, and
!
elements to be included in your response are described in the enclosed Notice
l
of Violation.
1
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Roem.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
\\
Cb"
&
$$43M$$N
4
f
G
Luis
. Reyes, Director
Division of Reactor Projects
Enclosures:
(See page 2)
{\\
JDI
-
-
APR 141987
.
,
Georgia Power Company
2
Enclosures:
1.
2.
NRC Inspection Report
cy w/encls:
(E. E. Conway, Senior Vice President &
Project Director
(f. Whitney, General Manager Project \\/
Support
y D. Rice, Vice President, Project \\/
Engineering
ofV H. Pinson, Vice President, Project /
Jonstruction
W. W. Hayes, Vogtle Quality
s/
fssuranceManager
W. B. Bockhold, General Manager, /
Nuclear Operations
g/Gucwa, Manager, Nuclear Safety /
and Licensing
g.H.Googe, Project
sf
GonstructionManager
DV. A. Bailey, Project Licensing /
Manager
g W. Churchill, Esq., Shaw,
/
Pittman, Potts and Trowbridge
oX' E. Joiner, Troutman, Sanders, /
t/.LockermanandAshmoreG. Ledbetter, Commissioner, /
JepartmentofHumanResources
j
(,C. H. Badger, Office of Planning V
f nd Budget
i
LU. Kirkland, III, Counsel,
/
Office of the Consumer's Utility
founcil
W. Feig, Georgians Against /
uclear Energy
. B. Margulies, Esq., Chairman, V
Atomic Safety and Licensing Board
Panel
GUr. O. H. Paris, Administrative Judge /
Atomic Safety and Licensing Board
A
inenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
bec w/encis:
(See page 3)
.
o
,
.
Georgia Power Company
3
APR 14 M7
b
w/encls: /
eis. 0GC V
.
M. Hill, IE
Miller, NRR
Brach, ED0
j
@M. Sinkule RII - I
E Christnot, RII
dRCResidentInspector
Document Control Desk
State of Georgia
RI
RII
RIJ
RII
RII
j
GHallstrom:es x1Blake
r
V
ciera
MSi
le
V8ro
ee
'
03pJ/87
03 '/87
//f/87
03/
7
/p{/87
03//F/87
f