ML20209D742
| ML20209D742 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 04/22/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20209D745 | List: |
| References | |
| NUDOCS 8704290350 | |
| Download: ML20209D742 (3) | |
See also: IR 05000285/1987006
Text
.
.
In Reply Refer To:
Docket:
50-285/87-06
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. P. H. Harrell of this office
during the period March 1-31, 1987, of activities authorized by NRC Operating
License DPR-40 for the Fort Calhoun Station, and to the discussion of our
findings with you and other members of your staff at the conclusion of the
inspection.
,
Areas examined during the inspection included operational safety verifications,
maintenance, surveillance, plant tours, safety-related system walkdown,
security observations, in-office review of periodic and special reports,
preparation for refueling activities, refueling activities, review of the
welding program, containment local leak rate testing, and followup on Generic Letter 83-28 (Salem ATWS event). Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspector.
The inspection findings
are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
i
Notice of Violation enclosed with this letter.
n
The material enclosed in Appendix A and the Safeguards Attact. ment to Appendix B
Jg
contains Safeguards Information as defined by 10 CFR Part 73.21 and its
cuon
disclosure to unauthorized individuals is prohibited by Section 147 of the
o8
Atomic Energy Act of 1954, as amended.
Therefore, the material contained in
S@
Appendix A and the Safeguards Attachment to Appendix B will not be placed in
the Public Document Room.
'
no
@@
We have also examined actions you have taken with regard to a previously
'
0-
identified inspection finding.
The status of this item is identified in
@q
paragraph 2 of the enclosed report.
,
,
O$
.
a)a.e
The response directed by this letter and the accompanying Notice is not subject
'
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
t
C:RSB/OSh
RI
PI %
EP&S S,
C:EP
,
J80ardman DHunnicutt
RIV:RS
PHarrell/nc RMullikin
RCal
LYand
4/3/87 /'
Af /ly /87
A/g/8
g /87
9 /6 /87 2/ //y/87
I
C:R
C:RPB t/
ENCLOSURE CONTAINS
r
90
JEGaglia ,o
SAFEGUARDS INFORMATION.
i
er
y
V
87
4/tl/87
UFON SEPARATION THIS
k
{
SAFEGUARDS INFORMADOU
emE iS oECoNTaou.co.
i
_-
.
.
!
Omaha Public Power District
-2-
l
'
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
[kWJnal Signed of
'U. E. Gastiardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
which is Safeguards Information
2.
Appendix B - NRC Inspection Report
50-285/87-06
3.
Safeguards Attachment to Appendix B
cc w/o Appendix A which is Safeguards Information and Safeguards
Attachment to Appendix B:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
Washington, DC 20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bcc:
(see next page)
I
1
j
1
l
REMOVAL OF TijE PAGF t '?? ken "S APGUAPCS INFORMATION"
'
DECOriTAOLS Y:,E ;
27,", cc ,
t
ic!:S q u CtJfA G N T.
_
'.
s
%
..
,.
.
.
- s
,
, .,
.,i
A
.s
- ,-
'~
-
s
,
,
%
<
V'S
'g
[
'
'
Omaha Public Power District
-3-
'
- -
,
.
'
-
bec: Copy of entire report:
R IV Security 11$l
,
-
G. McCorkle, NMSS
J. Gibson, SSFD/NRR
IE File
Resident Inspector
R. D. Martin, RA
Security Inspector
Chief, EP&SPS
D. Powers, E0
R. L. Bangart
_
.
bcc distrib. by RIV - Copy of report w/o Appendix A which is Safeguards
-
Information and Safeguards Attachment to Appendix B and w/766:
R&SPB
Section Chief (RPB/B)
MIS System
RIV file
RSTS Operator
D. Wiss, Rit/ALF
,
RSB
Pr_oject Inspector
'
R. Hall
RPB
bcc: RIV - Copy of report w/o Appendix A which is Safeguards Information and
s
j
Safeguards Attachment to Appendix B w/o 766:
3
DMB - IE04
E
H. Johnson, DRS&P
7
,
9
%
.,
,.
S
,
-
s
,,
'
e
+
t
M
%.
4
4
D*
s
4
=
-4%.
3
8
'
_.
. _
_
.
.. __ ..
$
h
mim i
..e.pa.
.=w
-a
1m-
aGm + h
-
-
-