Text
c
!O M b
,
ff a l
-
SEP 0 31986
Docket No. 50-373
License No. NPF-11
4
Docket No. 50-374
License No. NPF-18
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
Subject: NOTICE OF VIOLATION (NRC INSPECTION REPORTS N0. 50-373/86021
AND N0. 50-374/86020)
This refers to the inspections conducted during the period May 10 through
June 11, 1986 of activities authorized by NRC Operating Licenses No. NPF-11
and No. NPF-18 for the LaSalle County Nuclear Power Station, Units 1 and 2.
The inspection identified two procedural violations during withdrawal of a
control rod for Unit 2 on May 26,1986. This matter was discussed on
August 13, 1986 during an Enforcement Conference held at the USNRC Region III
office between Mr. L. DelGeorge (CECO) and Mr. James G. Keppler (NRC) and
members of our respective staffs.
As stated in our correspondence to you dated August 4,198G, the two procedural
violations were under consideration for escalated enforcement action. As a
result of the meeting on August 13, we have decided that escalated enforcement
action is not warranted at this time and are instead issuing two Severity
Level IV violations. However, further violations similar to these could result
in escalated enforcement action.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to take to prevent recurrence.
Enclosed also you will find five revised pages to the subject inspection report.
These pages corrected the tracking numbering sequence in the original report
for the identified violations and open items which were in error. Also this
will document the attendees to the Enforcement Conference in the subject report.
Please replace the old report pages with these new pages.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosures will be placed in the NRC's Public Document
Room.
8609030260 860903
'\\ i
4 DOCK 03000373
\\
O
. . _ .
_
._
.
.
.
Comonwealth Edison Company
2
SEP 0 3 L986
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
'
$c,...
- ,.-
'
-
,
Charles E. Norelius, Director
Division of Reactor Projects
Enclosures:
1.
2.
Corrected Pages to Report
cc w/ enclosure:
D. L. Farrar Director
of Nuclear Licensing
G. J. Diederich, Plant
Manager
DCS/RSB(RIDS)
Licensing Fee Management Brar.ch
Resident Inspector, RIII
Phyllis Dunton, Attorney
General's Office, Envirormental
Control Division
RIII
RIII
RIII
,/mj
Gu ,femopdele
us
_ _ _