ML20207T928
| ML20207T928 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/19/1987 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML19292G981 | List: |
| References | |
| NUDOCS 8703240429 | |
| Download: ML20207T928 (2) | |
See also: IR 05000269/1987002
Text
- - _ _ _ _ _ _ _ _ _ _ _
,3
uma tamwmt9HEREMM
f
.
f.
.
-
coms awe neoa*20"
-
r
..
FEB 1 9 E
'
.
Docket Nos. 50-269, 50-270, 50-287
License Nos. DPR-38, DPR-47, DPR-55
, Dyke Power Company
MTTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
INSPECTION REPORT NOS. 50-269/87-02, 50-270/87-02 AND 50-287/87-02
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. H. Miller, Jr., on January 26 - 30, 1987. The inspection included a review of
activities authorized for your Oconee facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff identi-
fled in the enclosed inspection report.
This inspection included a review of the implementation of 10 CFR 50, Appendix R,
Sections
III.G, III.J. III.L. and III.0 requirements at your Oconee facility.
As a result of the inspection, failures to comply with NRC regulatory require-
ments were identified.
The violation described in the enclosed Inspection Report is under consideration
for escalated enforcement action. Accordingly, no Notice of Violation is being
issued at this time. No response to this letter is required. However, please be
advised that the number and characterization of the violation described in the
enclosed report may change as a result of further NRC review.
Your attention is invited to the unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosure, and any
reply will be placed in the NRC Public Document Room.
If you wish to withhold
information contained therein, please notify this office by telephone within ten
days of the date of this letter and submit a written application to withhold
information contained therein promptly thereafter.
Such application must be
consistent with the requirement of 10 CFR 2.790(b)(1).
If we do not hear from
you in this regard within the period specified above, this letter, its enclosure,
and any reply will be made available to the public and be placed in the NRC
Public Document Room.
The responses directed by this letter and its enclosure are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
.
O
s h M Eg etw a
u= w
_
_- - ____ ___ _ -_ __ __
- - - - - - - - -
'
MfaL"..!=="*
pgs i s s
'
.
.
..
.
Duke Power Company -
2
You will be advised by separate correspondence of the results of our delibera-
tions on this matter.
Should you have any questions concerning this letter,
please contact us.
Sincerely,
C .~. .
MID 3I:
J.L e va C sd
J. Nelson Grace
Regional Administrator
Enclosure:
NRC Inspection Report
cc w/ encl-
4E S. Tuckman, Station Manager
bec w/ encl:
LIE File
tNMSS/SGPL
e4RR/DL/SSPB
Document Control Desk, 016
LRRC Resident Inspector
tg. Kubicki, NRR
bec w/ Inspection Summary:
State of North Carolina
7
L
'
. ' .[}1/k
j( f
(hV
RI[I
RI::
RIL
RI
RI
A
RII
'
Wi
ler:ls
.TCo lor[
AHerdt
AGib on
V rownlee
LReyes
7
'
02/t /87
gf
02/i /87 02 4 * /87 02//2./87
b
02/q/87
02//
7
t
RII
-
MIrn
02/ /87
$[,'gretevrnmi,a
w oe.sancu