Forwards Readiness Review Module Insp Rept 50-424/86-80 of App G, Measuring & Test Equipment. Control of Equipment Acceptable W/Exception of Listed Items
ML20207T512
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 11/12/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20207T513 List:
References
NUDOCS 8703240085
Download: ML20207T512 (3)


See also: IR 05000424/1986080

Text

7

~

-

.

, , ,. Ef

3t.4

'

,

- Q

  • s

.

..

NOV 121986

Georgi /PowerCompany

ATTN:/ Mr..- J. H. Miller, . Jr.

President

P.O. Box 4545

Atlanta, Georgia 30302

Gentlemen:

' SUBJECT: NRC REVIEW 0F V0GTLE, UNIT 1 READINESS REVIEW MODULE APPENDIX G,

MEASURING AND TEST EQUIPMENT (M&TE) - REPORT N0. 5044&/86-80

+'ay

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on March 11, 1986 and revised

March 31, 1986.

Periodic inspections were conducted at the Vogtle site, and

the resultant findings were discussed with members of your staff at the

conclusion of these inspections.

Technical reviews were conducted primarily in

NRC Bethesda and Region II offices, and the findings from these reviews have

7

-

also been discussed with your staff.

/

Areas contained in the module which were reviewed, examined, and verified are

identified in the enclosed report. Within these areas, the inspection and

verification consisted of selected examinations of procedures and representa-

tive records, discussions with personnel, observations of activities in

progress, inspection of a sample representing. critical elements of hardware

included in the M&TE program and review of your licensing commitments.

The results of Module Appendix G reviews and inspections are summarized into

'

the categories of acceptable, conditionally acceptable, and/or. unac.:eptable.

Your attention is invited to these matters which will be pursued during future

licensing reviews and inspections.

-

.,

Based upon the NRC' review and inspection of those activities identified in the

module, we have determined that control of M&TE at Vogtle, Unit 1 is acceptable

and complies with applicable regulatory requirements with the exception of

those items or areas identified below as conditionally acceptable and/or

unacceptable. This decision was based upon information currently available to

.the inspectors and reviewers. Should information subsequently become available

which was not considered during this review or which conflicts with earlier

information, it will be evaluated to determine what effects it may have on the

above conclusion.

h.

.

TEo/

c;-

,

.

y, -

-d :

.-w

%

( ny

y

g_ y

.

_

Georgia Power. Company

-2-

The following items are conditionally acceptable las' discussed. The NRC

inspection of critical elements of hardware included in the M&TE program

revealed (1) a lack of activity logs or other required usage records.for-

. automatic welding machines (Violation 424/86-77-01), and (2)'a question

concerning the'overall M&TE program to ensure that project FSAR.and relevant

procedures are adequately implemented (Unresolved item (UNR) 242/86-77-02).

.These items require further licensee attention and NRC review prior'to full

-acceptance of Appendix G.

Please contact us should you have any questions.concerning this letter.

Sincerely,

Original-Signed by

J. N. Grace

J. Nelson Grace

Regional Administrator

Enclosure:

Peport No. 50-424/86-80

pc w/ encl:

VJ. P. O'Reilly, Sr. Vice President

.

Nuclear Operations

/R. E. Conway, Sr. Vice President &

Project Ofrector

M D. O. Foster, Vice President, Project

Support

MP.D. Rice,VicePresident, Project

Engineering

JR. H..Pinson, Vice President, Project

Construction

A 4. T. Beckham, Vice President &

d.GeneralManager-Operations

A. Thomas, Vice President, Licensing

Q . S. Read, General Manager, Quality

Assurance

- s/C. W. Hayes, Vogtle Quality

Assurance Manager

>/)l

C. Ramsey, Manager - Readiness Review

- VG. B. Bockhold, General Manager,

Nuclear Operations

dL..Gucwa, Manager, Nuclear Safety

and Licensing

r-

. W. Googe, Project Construction Manager

'-

E. D. Groover, Quality Assurance Site

Manager - Construction

elJ.A. Bailey,ProjectLicensing

Manager

jG.F.Trowbridge,Esq.,Shaw,

Pittman, Potts and Trowbridge

(cc w/ enc 1 cont'd - see page 3)

.

-

- -

-

-

-

-

-

-

- - -

- -

-

-

m

_

_

,

.,

.

',

.

Georgia Power Company

-3-

NOV 121985

Jccw/enclcont'd)

g B. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

/E. L. Blake, Jr. , Esq. , Shaw,

_

Pittman, Potts and Trowbridge

%/J. E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

MJ.G.Ledbetter, Commissioner, Department

of Human Resources

s/C.H. Badger,OfficeofPlanning

and Budget

jD.Kirkland,III, Counsel, Office

of the Consumer's Utility Council

M. B. Margulies, Esq., Chairman,

-

Atomic Safety and Licensing

j Board Panel

/ Dr. Oscar H. Paris, Administrative

Judge, Atomic Safety and Licensing

Board Panel

lGustave A. Lineberger, Jr. , Administrative

Judge, Atomic Safety and Licensing

Board Panel

D. Feig, Georgians Against Nuclear Energy

sMB.P. Garde,CitizensClinic, Director

Government Accountability Project

,.

i

bec w/ encl:

s

4 EReis. ELD

MSinkule, RII

g j Partlow, IE

j[

NBKGrimes, IE

EChristnot, RII

qJKonklin, IE

Do n ' TP-

V WHill, IE

.p NRC Resident Inspector J MPeranich, IE gay g::c

N M FCHawkins, IE

DCS.016

MiPhillips, IE

_vdMMiller,NRR

State of Georgia

RCPB R/F

Fd~~S

d""

I

WBrach, E00

~VLlewis,IE

f c/ [D /n

sold /%

I .J E :RCP

IE :RCPB:DI:IE

DIR' DI:I
Q : )QAVT:IE:QABrDQAVT:IE:DIR:DQAVT:IE

'0FC :R

s...--:

[.---:--

- C r--------:-

d- v


:---

---:--

---:-

p ------:WHill

NAME :

1ps/vj:M

J
JP

ow

L

Wis

mes T

..

,

.........:.........___:............:Ny......__..b.......L.

.....:............:

...__.....:.

/ 88

0 /%$/86
09/A/86
09 M 86

/f?/86

DATE :09/%1/86

/f/86

/

RII
RII

/g:RII

/

RII:

y

OFC :RII

... .....__:... g....p...:.. ...f.j

.

...:.______.....:.__.........:......__...

..___;...__
RW lker
JHGrace
E..sc.hnde,bu,

............:........___ :............:...I..T 9 %.

!NAME :EChristno

MSinkule
WBrownlee

!.....:...........:............:............:d/4/86

.....

jDATE:09/ /86

09/ /86
09/ /86
09/ /86
Hls/h.
145/96

n fYfB&

Is} Sl6c,

IslC[g,

l

N' h'~

f

-

-

- -

-

- - - - -

-

- - - -

-

-

-

- -